- 15 permits filed
93 permits since 2000: 86 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 7 completed, 2 in progress, 1 never finaled. Typically 31 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2026 | In progress issued May 2026 | 778 44th Av | demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned spaceDetails
demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned space | $150,000 |
| Mar 2, 2026 | In progress issued May 2026 | 563 18th Av | rebuild (e) deteriorating exterior stair at rear of the building for life/safety purposes. rebuild (e) decks at each of the 3 floor levels in a revised configuration.Details
rebuild (e) deteriorating exterior stair at rear of the building for life/safety purposes. rebuild (e) decks at each of the 3 floor levels in a revised configuration. | $50,000 |
| Jun 10, 2022 | Completed final sign-off Apr 2023 | 255 Chenery St | revision to 202204212679. hvac changed from forced air system to hydronic system, 2 interior (e) stairs will be replaced w/new code complaint stairs. (e) door from (e) stair #1 to the breezeway will be replaced w/ new door @ backyard.Details
revision to 202204212679. hvac changed from forced air system to hydronic system, 2 interior (e) stairs will be replaced w/new code complaint stairs. (e) door from (e) stair #1 to the breezeway will be replaced w/ new door @ backyard. | $15,000 |
| May 31, 2022 | Completed final sign-off Feb 2023 | 665 05th Av | convert (e) attic to habitable space, add dormers, add interior stairs connecting attic to 3rd floor - replace 3rd floor tub with shower, enlarge 3rd floor between living and dining. -Details
convert (e) attic to habitable space, add dormers, add interior stairs connecting attic to 3rd floor - replace 3rd floor tub with shower, enlarge 3rd floor between living and dining. - | $120,000 |
| Jun 22, 2021 | Completed final sign-off Oct 2021 | 160 Lenox Wy | new stair at rear yard. new french door.Details
new stair at rear yard. new french door. | $9,000 |
| Nov 17, 2020 | Never finaled issued Apr 2021, no final | 306 Sanchez St | rear porch upgrade: structural work only. existing rear staircase to be repaired in-kind.Details
rear porch upgrade: structural work only. existing rear staircase to be repaired in-kind. | $5,000 |
| Feb 12, 2020 | Completed final sign-off May 2020 | 2634 Bush St | fix front exterior stair trends and risers (9 steps in total). work less than 50%.Details
fix front exterior stair trends and risers (9 steps in total). work less than 50%. | $2,000 |
| Nov 2, 2018 | Completed final sign-off Aug 2020 | 642 Rockdale Dr | construct (n) deck on grade & (n) deck @ 2nd flr w/ connecting stair @ rear of bldg. add (2) sliding doors @ 2nd flr deck.Details
construct (n) deck on grade & (n) deck @ 2nd flr w/ connecting stair @ rear of bldg. add (2) sliding doors @ 2nd flr deck. | $45,000 |
| Mar 22, 2017 | Completed final sign-off Apr 2018 | 60 Belcher St | add new stair to rear of property, stair connects existing rea yard to existing balcony off rear of 2nd fl unit. stair for yard access only, not means of egress. add new 10' fence to rear yardDetails
add new stair to rear of property, stair connects existing rea yard to existing balcony off rear of 2nd fl unit. stair for yard access only, not means of egress. add new 10' fence to rear yard | $20,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2015 | 2036 Santiago St | repair in kind 50% of exterior stairs front of house approx 50%Details
repair in kind 50% of exterior stairs front of house approx 50% | $10,000 |