Back to bathroom remodel contractors
Dunros Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2014 to May 2026
- Last 24 months
- 15 permits filed
93 permits since 2000: 86 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
42 bathroom remodel permits: 39 completed, 3 in progress. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2026 | In progress issued May 2026 | 778 44th Av | demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned spaceDetails
demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned space | $150,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 296 Santa Rosa Av | to comply w/ nov# 202534271, fix fire damage area at south side roughly 300 sqft of siding and framing. kitchen & bathroom remodel, everything stays in same location.Details
to comply w/ nov# 202534271, fix fire damage area at south side roughly 300 sqft of siding and framing. kitchen & bathroom remodel, everything stays in same location. | $50,000 |
| Jan 23, 2026 | Completed final sign-off May 2026 | 2270 29th Av | kitchen and bathroom remodel 1st flr. new kitchen cabinets, stone and backsplash, replace 1 window facing light well. bathroom replace all fixtures, replace 1 window facing lightwell. no structual work.Details
kitchen and bathroom remodel 1st flr. new kitchen cabinets, stone and backsplash, replace 1 window facing light well. bathroom replace all fixtures, replace 1 window facing lightwell. no structual work. | $45,000 |
| Sep 10, 2025 | Completed final sign-off Nov 2025 | 734 21st Av | full bathroom remodel like for like, all current fixtures to remain in current locations, all walls to remain, new electrical in bathroom only. no change to floor layout. no change to wall layout. no structural work.Details
full bathroom remodel like for like, all current fixtures to remain in current locations, all walls to remain, new electrical in bathroom only. no change to floor layout. no change to wall layout. no structural work. | $15,000 |
| Jun 17, 2025 | Completed final sign-off Mar 2026 | 2910 26th Av | remodel a total of 3 bathrooms all fixtures to remain in current locations new fixtures throughout change locations of ressed cans.Details
remodel a total of 3 bathrooms all fixtures to remain in current locations new fixtures throughout change locations of ressed cans. | $40,000 |
| May 7, 2025 | Completed final sign-off Jul 2025 | 734 21st Av | 50% bathroom remodel: new vanity, floor tile, new toilet and new electrical. everything in same location. no work in shower area.Details
50% bathroom remodel: new vanity, floor tile, new toilet and new electrical. everything in same location. no work in shower area. | $6,000 |
| Dec 9, 2024 | In progress issued Dec 2024 | 1633 Sanchez St | emergency in kind repair of (e) 3 story rear structrue correct floor slope replace floor sheating repair dry rot damaged wall studs/floor joists posts, foundation repair. kitchen/bath remodel at 2nd/3rd floor due to repair. under 50% repair or rear structureDetails
emergency in kind repair of (e) 3 story rear structrue correct floor slope replace floor sheating repair dry rot damaged wall studs/floor joists posts, foundation repair. kitchen/bath remodel at 2nd/3rd floor due to repair. under 50% repair or rear structure | $96,000 |
| Aug 28, 2024 | Completed final sign-off Mar 2025 | 244 Whitney St | remodel bathroom keep all fixture locations in same place. remove counter top and tile backsplash in kitchen and replace in kind no structural work to be completed.Details
remodel bathroom keep all fixture locations in same place. remove counter top and tile backsplash in kitchen and replace in kind no structural work to be completed. | $12,000 |
| Jul 11, 2024 | Completed final sign-off Oct 2024 | 145 Casitas Av | remodel one bathroom at 3rd floor. replace one bedroom door at 3rd floorDetails
remodel one bathroom at 3rd floor. replace one bedroom door at 3rd floor | $20,000 |
| Jun 6, 2024 | Completed final sign-off Dec 2024 | 993 Tennessee St | unit #2 interior remodel of 1,511 sqft condo. remodel to include 2 in kind full baths on upper level and 1.5 bath on the lower level. in kind kitchen remodel on lower level. (n) laundry machines will be installed to a cabinet in the kitchenDetails
unit #2 interior remodel of 1,511 sqft condo. remodel to include 2 in kind full baths on upper level and 1.5 bath on the lower level. in kind kitchen remodel on lower level. (n) laundry machines will be installed to a cabinet in the kitchen | $150,000 |
| May 31, 2024 | Completed final sign-off Apr 2025 | 528 Stanyan St | interior remodel to convert (e) full bath and half bath into 2 full baths; add 1 new window in existing lightwell (not visible from street)Details
interior remodel to convert (e) full bath and half bath into 2 full baths; add 1 new window in existing lightwell (not visible from street) | $50,000 |
| May 31, 2024 | Completed final sign-off Oct 2024 | 376 Marietta Dr | 3x bathroom remodel- in kind no wall removal or structural work.Details
3x bathroom remodel- in kind no wall removal or structural work. | $35,000 |
| May 21, 2024 | Completed final sign-off Aug 2024 | 20 Cotter St | revision to 202404220439 to change contractor of record and remove 1 window and replace one window in kind at 2nd fk bathroom. not visible from street.Details
revision to 202404220439 to change contractor of record and remove 1 window and replace one window in kind at 2nd fk bathroom. not visible from street. | $100 |
| May 9, 2024 | Completed final sign-off Aug 2024 | 467 Gates St | covert existing full bath into half bath and laundryDetails
covert existing full bath into half bath and laundry | $20,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 20 Cotter St | remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street)Details
remodel bathroom. no structural. replace 3 rear windows in kind (not visible from the street) | $30,000 |
| Mar 14, 2024 | Completed final sign-off Aug 2024 | 1735 39th Av | revision to 202309196916: g/f layout change - wet bar, bathroom, & hallwayDetails
revision to 202309196916: g/f layout change - wet bar, bathroom, & hallway | |
| Sep 19, 2023 | Completed final sign-off Aug 2024 | 1735 39th Av | interior alter on 1st fl: (n) conditioned entertaiment rm, wet bar, bath, new rear sliding dr. reconfig entry wall. upgrade eletrical panel. 247 sf of conditioned spaceDetails
interior alter on 1st fl: (n) conditioned entertaiment rm, wet bar, bath, new rear sliding dr. reconfig entry wall. upgrade eletrical panel. 247 sf of conditioned space | $45,000 |
| Feb 3, 2023 | Completed final sign-off Apr 2023 | 372 Marietta Dr | 2 bathroom remodels with evrything staying in same location. no moving walls, approx 50 sf each.Details
2 bathroom remodels with evrything staying in same location. no moving walls, approx 50 sf each. | $30,000 |
| Oct 20, 2022 | Completed final sign-off Jan 2023 | 2195 Green St | apt #4: remodeling one kitchen and 2 bathrooms and everything staying in the same location. adding washer/dryer in hallway closet.Details
apt #4: remodeling one kitchen and 2 bathrooms and everything staying in the same location. adding washer/dryer in hallway closet. | $75,000 |
| Jun 30, 2022 | Completed final sign-off Sep 2022 | 1737 Sutter St | 2 baths remodel in kindDetails
2 baths remodel in kind | $35,000 |
| Apr 21, 2022 | Completed final sign-off Apr 2023 | 255 Chenery St | remodel the (e) 1st story and 2nd story, relocate (e) plumbing, create a hallway to have the residence separated from the garage on the 1st story, remove the (e) half bath on the 1st story, replace the (e) hvac system with energy star rated equipment reconfigure the (e) plumbing on the 2nd storyDetails
remodel the (e) 1st story and 2nd story, relocate (e) plumbing, create a hallway to have the residence separated from the garage on the 1st story, remove the (e) half bath on the 1st story, replace the (e) hvac system with energy star rated equipment reconfigure the (e) plumbing on the 2nd story | $450,000 |
| Mar 23, 2022 | Completed final sign-off Jul 2022 | 990 Burnett Av | 2 bath rooms and kitchen remodel: everything is staying in same location.Details
2 bath rooms and kitchen remodel: everything is staying in same location. | $65,000 |
| Feb 18, 2022 | Completed final sign-off May 2022 | 150 Riverton Dr | bathroom remodel in-kindDetails
bathroom remodel in-kind | $22,000 |
| May 7, 2021 | Completed final sign-off Jul 2021 | 1026 Clayton St | bathroom remodel with new replacement window - street facing. like for like, no changesDetails
bathroom remodel with new replacement window - street facing. like for like, no changes | $19,000 |
| May 7, 2021 | Completed final sign-off Oct 2021 | 160 Lenox Wy | bathroom remodel and new kitchen countertops (like for like, no changes)Details
bathroom remodel and new kitchen countertops (like for like, no changes) | $20,000 |
| Feb 5, 2021 | Completed final sign-off Apr 2021 | 216 Lily St | work on unit 216 a: remodel 2 bathrooms on first flr. change bathtub out, replace vanity and toilets. no electrical work to be preformed. no new wall and no existing wall relocation. new lighting, shall comply w/ cec 150.0.(k)3 & (k) sDetails
work on unit 216 a: remodel 2 bathrooms on first flr. change bathtub out, replace vanity and toilets. no electrical work to be preformed. no new wall and no existing wall relocation. new lighting, shall comply w/ cec 150.0.(k)3 & (k) s | $15,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2021 | 25 Brentwood Av | remodel bathroom. all walls to be unchanged.Details
remodel bathroom. all walls to be unchanged. | $20,000 |
| Mar 4, 2020 | Completed final sign-off Jul 2020 | 2462 24th Av | remodel 1st fl bathroom in kind all fixtures to remain in same locationDetails
remodel 1st fl bathroom in kind all fixtures to remain in same location | $12,000 |
| Sep 27, 2019 | Completed final sign-off Aug 2020 | 66 Belcher St | remodel kitchen new cabinets, appliances all same location. remodel bathroom 80 sq ft, all same location. repair water damage on floor in hallway.Details
remodel kitchen new cabinets, appliances all same location. remodel bathroom 80 sq ft, all same location. repair water damage on floor in hallway. | $17,000 |
| Sep 23, 2019 | Completed final sign-off Feb 2021 | 372 Marietta Dr | remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl.Details
remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl. | $64,193 |
| Aug 30, 2019 | Completed final sign-off May 2020 | 2632 Bush St | remodel bathroom & kitchen, no structural work, approx. 250 sq. ft.Details
remodel bathroom & kitchen, no structural work, approx. 250 sq. ft. | $35,000 |
| Jul 31, 2019 | Completed final sign-off Apr 2020 | 467 Gates St | rev to pa# 201906274521 remove (e) perimeter foundation & shift new retaining wall to line with perimeter wall above. remodel (e) ground floor bathroom in kind. replace drywall and insulation in family room.Details
rev to pa# 201906274521 remove (e) perimeter foundation & shift new retaining wall to line with perimeter wall above. remodel (e) ground floor bathroom in kind. replace drywall and insulation in family room. | |
| Apr 10, 2019 | Completed final sign-off Apr 2020 | 467 Gates St | relocate kitchen within building area. remodel 3rd fl bath. no change to footprint, no change to exteriorDetails
relocate kitchen within building area. remodel 3rd fl bath. no change to footprint, no change to exterior | $60,000 |
| Sep 19, 2018 | Completed final sign-off Feb 2020 | 2446 20th Av | 2-story addition @ rear of home approx 5' deep. addition of approx 5' shed dormer @ upper level of south side residence. renovation of kitchen, powder room @ main level, renovation of master bedroom @ upper level, addition of master bath @ upper levelDetails
2-story addition @ rear of home approx 5' deep. addition of approx 5' shed dormer @ upper level of south side residence. renovation of kitchen, powder room @ main level, renovation of master bedroom @ upper level, addition of master bath @ upper level | $100,000 |
| Jun 18, 2018 | Completed final sign-off Dec 2018 | 47 Melrose Av | add bathroom to ground floor rear bedroom. legalize 117 sq. ft. extg living space on ground floor.Details
add bathroom to ground floor rear bedroom. legalize 117 sq. ft. extg living space on ground floor. | $50,000 |
| Mar 16, 2018 | Completed final sign-off May 2018 | 2462 24th Av | remodel bathroom no structural changes. replace all fixtures same location. approx 40 sq. st. lighting per cenc 150.0(k)Details
remodel bathroom no structural changes. replace all fixtures same location. approx 40 sq. st. lighting per cenc 150.0(k) | $12,500 |
| Dec 1, 2017 | Completed final sign-off Dec 2018 | 270 Cresta Vista Dr | remodel 1 bathroom & kitchen ; in kind. no removal of walls.Details
remodel 1 bathroom & kitchen ; in kind. no removal of walls. | $20,000 |
| Oct 23, 2017 | Completed final sign-off Mar 2018 | 642 Rockdale Dr | remodel bathroom fixtures to remain in current locations. no change in wall & opening layout.Details
remodel bathroom fixtures to remain in current locations. no change in wall & opening layout. | $12,500 |
| Jun 20, 2017 | Completed final sign-off Dec 2017 | 4270 Cesar Chavez St | remodel existing bathroom, relocate shower & vanity, in kind bathroom remodel, same sizeDetails
remodel existing bathroom, relocate shower & vanity, in kind bathroom remodel, same size | $18,000 |
| Nov 18, 2016 | Completed final sign-off May 2017 | 150 Page St | demo non bearing interior partition walls. remodel bathroom.Details
demo non bearing interior partition walls. remodel bathroom. | $18,000 |
| Aug 31, 2015 | Completed final sign-off Mar 2018 | 290 Parnassus Av | provide private roof deck garden & remodel kitchen & baths. replace windows. provide fire sprinklers under sep permit. no work visible from streetDetails
provide private roof deck garden & remodel kitchen & baths. replace windows. provide fire sprinklers under sep permit. no work visible from street | $150,000 |
| Jun 16, 2015 | Completed final sign-off Sep 2015 | 627 Masonic Av | remodeling bathroom and powder room at the 3rd floor and replace window in the bathroom not visible from the street.Details
remodeling bathroom and powder room at the 3rd floor and replace window in the bathroom not visible from the street. | $30,000 |