Block 3589, lot 122
2208 Mission St
- City’s use
- Single Family Residential
- Built
- 2009
- Stories
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 921 sq ft
- Lot
- 13,600 sq ft
- Zoning
- NC3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 2208 Mission St | M Iii Construction | common areas: in kind water damage repairs to walls and ceilings in laundry rooms of floors 3, 4, 5,. repairs @ ceiling should kee 1hr fire rating@ all openings for horizontl separation.Details
common areas: in kind water damage repairs to walls and ceilings in laundry rooms of floors 3, 4, 5,. repairs @ ceiling should kee 1hr fire rating@ all openings for horizontl separation. | $3,168 |
| Mar 12, 2026 | Completed final sign-off Aug 2026 | 2208 Mission St | Lev Ingman | redo shower waterproffing, new pan, new tile, replace mixing valve and add new heads. in kind. unit 201Details
redo shower waterproffing, new pan, new tile, replace mixing valve and add new heads. in kind. unit 201 | $5,000 |
| Mar 6, 2026 | In progress issued Mar 2026 | 2208 Mission St | unit 201: administrative permit to remove first floor from scope of work. pipe no longer needs th be rerouted on first floor. ref#: sprinkler pa#: 202501138175.Details
unit 201: administrative permit to remove first floor from scope of work. pipe no longer needs th be rerouted on first floor. ref#: sprinkler pa#: 202501138175. | ||
| Mar 6, 2026 | Completed final sign-off Sep 2026 | 2208 Mission St | Lev Ingman | recommencement and completion of work approved under pa# 202411265795.Details
recommencement and completion of work approved under pa# 202411265795. | $7,200 |
| Jan 13, 2025 | In progress issued Jan 2025 | 2208 Mission St | A M West Mechanical Inc. | unit 201-ref 202303314843-add relocate and remove 1 fire spriknler for ti. reroute pipe conflict with plumbing pipe. no underground workDetails
unit 201-ref 202303314843-add relocate and remove 1 fire spriknler for ti. reroute pipe conflict with plumbing pipe. no underground work | $3,000 |
| Nov 26, 2024 | Expired or cancelled expired Sep 2026 | 2208 Mission St | revision to permit# 202303314843: patching of rated walls, new minor floor penetrations, removal of non structural wall, anchorage of new interior sliding door.Details
revision to permit# 202303314843: patching of rated walls, new minor floor penetrations, removal of non structural wall, anchorage of new interior sliding door. | $8,000 | |
| Mar 31, 2023 | Completed final sign-off Aug 2026 | 2208 Mission St | Jeurieb Construction, Lev Ingman | unit#201: renovation of existing condo including demo of non-structural interior partitions, new interior finishes and kitchen cabinetry and new enlarged opening at existing kitchen window and new sliding door to provide access to exiting lightwell deck.Details
unit#201: renovation of existing condo including demo of non-structural interior partitions, new interior finishes and kitchen cabinetry and new enlarged opening at existing kitchen window and new sliding door to provide access to exiting lightwell deck. | $40,000 |
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 2208 Mission St | street spaceDetails
street space | ||
| Jul 18, 2019 | Completed final sign-off Oct 2019 | 2208 Mission St | Dunros Construction | remove and replace approximately 2600 sqft of stucco, in kind. street facing and side.Details
remove and replace approximately 2600 sqft of stucco, in kind. street facing and side. | $50,000 |
| Jun 25, 2019 | Never finaled issued Jun 2019, no final | 2208 Mission St | street spaceDetails
street space | ||
| May 28, 2019 | Never finaled issued May 2019, no final | 2208 Mission St | street spaceDetails
street space | ||
| May 2, 2019 | Completed final sign-off Oct 2019 | 2208 Mission St | Dunros Construction | exploratory demo concrete in garage to evaluate water intrusion.Details
exploratory demo concrete in garage to evaluate water intrusion. | $400 |
| Sep 6, 2018 | Never finaled issued Sep 2018, no final | 2208 Mission St | street spaceDetails
street space | ||
| Apr 11, 2018 | Never finaled issued Apr 2018, no final | 2208 Mission St | street space w/mtaDetails
street space w/mta | ||
| Mar 13, 2018 | Never finaled issued Mar 2018, no final | 2208 Mission St | street space w/mtaDetails
street space w/mta | ||
| Feb 8, 2018 | Completed final sign-off Aug 2018 | 2208 Mission St | Andrew Chekene Enterprises/ Dba Ac Enter | tune up 18 windows, remove and replace 24 windows like for like (aluminum windows).u factor below 0.32Details
tune up 18 windows, remove and replace 24 windows like for like (aluminum windows).u factor below 0.32 | $80,000 |
| Jul 6, 2016 | Completed final sign-off Jan 2017 | 2208 Mission St | Andrew Chekene Enterprises/ Dba Ac Enter | work in common area: inkind repair of stucco in southern lightwells; replace 36 aluminum sh windows in southern lightwells with fiberglass sh windowsDetails
work in common area: inkind repair of stucco in southern lightwells; replace 36 aluminum sh windows in southern lightwells with fiberglass sh windows | $135,000 |
| Jun 27, 2013 | Never finaled issued Jun 2013, no final | 2208 Mission St | street spaceDetails
street space | ||
| Apr 15, 2013 | Never finaled issued Apr 2013, no final | 2208 Mission St | Ideal Carpentry** See Contractor's Note* | replace new tub and tile rap, in same location, maintain accessibility requiredDetails
replace new tub and tile rap, in same location, maintain accessibility required | $3,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.