Block 1328, lot 015
745 El Camino Del Mar
- City’s use
- Single Family Residential
- Built
- 1936
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 4,065 sq ft
- Lot
- 5,161 sq ft
- Zoning
- RH1D
- Construction type
- WOO
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2023 | Completed final sign-off Nov 2023 | 745 El Camino Del Mar | Dunros Construction | replace in kind (3) double hung windows, (18) casement windows, (1) set of french ext doors, and (1) exterior door.Details
replace in kind (3) double hung windows, (18) casement windows, (1) set of french ext doors, and (1) exterior door. | $65,000 |
| Mar 18, 2013 | Completed final sign-off Jun 2013 | 745 El Camino Del Mar | Martin Hawkins | remodel in extg residence in basement area. work to include adding a new full bath and enclosed laundry room in same location as extg laundry area. no change in bldg envelope or exterior.Details
remodel in extg residence in basement area. work to include adding a new full bath and enclosed laundry room in same location as extg laundry area. no change in bldg envelope or exterior. | $30,000 |
| Mar 1, 2013 | Completed final sign-off Jun 2013 | 745 El Camino Del Mar | Martin Hawkins | remove existing bathroom on 2nd floor - all new fixtures, tiles and vanity. change tile @ existing half bathroom on 1st floor. no structuralDetails
remove existing bathroom on 2nd floor - all new fixtures, tiles and vanity. change tile @ existing half bathroom on 1st floor. no structural | $15,000 |
| Oct 24, 2012 | Completed final sign-off Jan 2013 | 745 El Camino Del Mar | J M K Construction Inc | remove of cracked stucco at rear of house. reflash windows. apply new stucco,paint and repair in kind.Details
remove of cracked stucco at rear of house. reflash windows. apply new stucco,paint and repair in kind. | $6,000 |
| Jun 17, 2005 | Completed final sign-off Sep 2005 | 745 El Camino Del Mar | Van Der Sterre Construction | reduce scope at lower level per revised plan. no structural changes. remove bathroom see page 4- grDetails
reduce scope at lower level per revised plan. no structural changes. remove bathroom see page 4- gr | |
| Oct 19, 2004 | Completed final sign-off Sep 2005 | 745 El Camino Del Mar | add residential elevator, remodel kitchen & 3 bathrooms finish existing space in basementDetails
add residential elevator, remodel kitchen & 3 bathrooms finish existing space in basement | $200,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Martin Hawkins (2), Dunros Construction, J M K Construction Inc, Van Der Sterre Construction
- Architects
- John Ploss
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.