M L S Builder Inc.
- Based in
- Oakland
- On San Francisco permits
- Sep 2010 to Apr 2026
- Last 24 months
- 7 permits filed
73 permits since 2000: 40 completed, 4 in progress, 15 never finaled, 14 expired or cancelled.
Of the 15 never-finaled permits, 7 are 5 to 10 years old, 8 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 1593 Mcallister St | unit 206 and 305: to comply w/ nov items 202534534 item #2 & 3 - full bathroom remodels, tub to shower for both. customer stated no plumbing and electrical to be completed. no removal of wallsDetails
unit 206 and 305: to comply w/ nov items 202534534 item #2 & 3 - full bathroom remodels, tub to shower for both. customer stated no plumbing and electrical to be completed. no removal of walls | $14,663 |
| Apr 1, 2026 | In progress issued Apr 2026 | 3255 Balboa St | horizontal addition -add 43 sf to rear of building. relocate side setback wall and construct new wall. remove partial roof and construct new partial roof. the lighting and receptacles are existing to remain.Details
horizontal addition -add 43 sf to rear of building. relocate side setback wall and construct new wall. remove partial roof and construct new partial roof. the lighting and receptacles are existing to remain. | $15,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 1028 Balboa St | kitchen remodel: replace 2nd floor kitchen cabinets.Details
kitchen remodel: replace 2nd floor kitchen cabinets. | $10,000 |
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 1593 Mcallister St | apt 206: replace kitchen/cabinets, flooring, and counter. apt 305 replace countertop and sink. to comply with nov#202650430Details
apt 206: replace kitchen/cabinets, flooring, and counter. apt 305 replace countertop and sink. to comply with nov#202650430 | $10,000 |
| May 8, 2025 | Expired or cancelled cancelled Dec 2025 | 1256 30th Av | comply with nov 202537138. less than 50% repair front landing for loosening masonry for exterior stairway. repair front door.Details
comply with nov 202537138. less than 50% repair front landing for loosening masonry for exterior stairway. repair front door. | $2,000 |
| Dec 10, 2024 | In progress issued May 2025 | 3405 Geary Bl | remodel residence on 2nd fl: kitchen & bathroom . add bath and convert great room to 2 bedroom at frontDetails
remodel residence on 2nd fl: kitchen & bathroom . add bath and convert great room to 2 bedroom at front | $45,000 |
| Nov 27, 2024 | Completed final sign-off Apr 2025 | 226 Balboa St | rev 202408078195 and ref 201902080819- for fire spinkler plansDetails
rev 202408078195 and ref 201902080819- for fire spinkler plans | |
| Aug 20, 2024 | In progress issued Apr 2025 | 486 Head St | add 2 story rear addition for new bedrooms. remodel (e) 1st floor into new wet bar area, bathroom & new family.Details
add 2 story rear addition for new bedrooms. remodel (e) 1st floor into new wet bar area, bathroom & new family. | $150,000 |
| Aug 7, 2024 | Completed final sign-off Apr 2025 | 226 Balboa St | voluntary install new fire sprnkler system, interior and install new underground fire line (pa# 2018-0208-0819 change of use permit, from retail store to child care)Details
voluntary install new fire sprnkler system, interior and install new underground fire line (pa# 2018-0208-0819 change of use permit, from retail store to child care) | $10,000 |
| May 17, 2024 | Expired or cancelled expired Feb 2026 | 226 Balboa St | revision to pa#202206025458. relocate new concrete footngs and steel beam as shown on the revised plans sheet sr1Details
revision to pa#202206025458. relocate new concrete footngs and steel beam as shown on the revised plans sheet sr1 | $100 |
| Apr 18, 2024 | Completed final sign-off Apr 2025 | 945 Pine St | side staircase guard rail repair in kind approx. 20%. backyard, side yard painting. upgrade electrical meter and service from pg&e.Details
side staircase guard rail repair in kind approx. 20%. backyard, side yard painting. upgrade electrical meter and service from pg&e. | $10,000 |
| Jun 2, 2022 | Completed final sign-off Feb 2026 | 226 Balboa St | revision change of use (e) building to child carre center pa# 201802080819 change of occupancy. restroom revisions & electrical.Details
revision change of use (e) building to child carre center pa# 201802080819 change of occupancy. restroom revisions & electrical. | $40,000 |
| Nov 16, 2021 | Completed final sign-off Dec 2021 | 555 North Point St | relocate and replace total 2 f.s. heads at rooms 545 and 454. re-route 1 fire sprinkler line at room #454. ref app#202104299570Details
relocate and replace total 2 f.s. heads at rooms 545 and 454. re-route 1 fire sprinkler line at room #454. ref app#202104299570 | $3,000 |
| Nov 24, 2020 | Never finaled issued Jan 2021, no final | 234 Balboa St | electrical plan check only. install electrical lights, & wall outlets per title 24 energy report (electrical installation requires sep permit). ref pa201802080824.Details
electrical plan check only. install electrical lights, & wall outlets per title 24 energy report (electrical installation requires sep permit). ref pa201802080824. | $3,000 |
| Nov 23, 2020 | Expired or cancelled expired Feb 2026 | 226 Balboa St | electric plan check only - oti. install electrical lights and wall outlets per title 24 energy report. ref pa #2018 0208 0819Details
electric plan check only - oti. install electrical lights and wall outlets per title 24 energy report. ref pa #2018 0208 0819 | $3,000 |
| Jul 21, 2020 | Expired or cancelled expired Feb 2026 | 226 Balboa St | mechanical only ti instlall hydronic radiant heating ventalation duct in ti title 24 child care space ref pa# 201802080819Details
mechanical only ti instlall hydronic radiant heating ventalation duct in ti title 24 child care space ref pa# 201802080819 | $45,000 |
| Mar 10, 2020 | Completed final sign-off Jun 2021 | 1967 22nd Av | install new (13r) fire sprinkler system including underground; 40 heads total; ref pa 2019-0213-2882Details
install new (13r) fire sprinkler system including underground; 40 heads total; ref pa 2019-0213-2882 | $15,000 |
| Feb 19, 2020 | Expired or cancelled cancelled Dec 2025 | 1256 30th Av | add (2) bedroom adu on 1st fl per ord 95-17. rear yard extension & remodel (e) house under appln #202002184667Details
add (2) bedroom adu on 1st fl per ord 95-17. rear yard extension & remodel (e) house under appln #202002184667 | $150,000 |
| Feb 18, 2020 | Expired or cancelled cancelled Dec 2025 | 1256 30th Av | rear yard extension. all (3) levels & remodel (e) house. replace (e) front windows in kind. (2) (n) bedrooms. adu under seperate permit 202002194849.Details
rear yard extension. all (3) levels & remodel (e) house. replace (e) front windows in kind. (2) (n) bedrooms. adu under seperate permit 202002194849. | $200,000 |
| Dec 9, 2019 | Expired or cancelled suspend Mar 2020 | 920 Rutland St | new residential fire sprinkler (nfpa 13d) for new adu on back; including underground work. refer to pa 2018 0118 8911Details
new residential fire sprinkler (nfpa 13d) for new adu on back; including underground work. refer to pa 2018 0118 8911 | $5,000 |
| Nov 25, 2019 | Completed final sign-off Nov 2021 | 1640 Vallejo St | recommencement and completion of work approved under pa# 201704285137Details
recommencement and completion of work approved under pa# 201704285137 | $250,000 |
| Aug 19, 2019 | Completed final sign-off Apr 2021 | 1640 Vallejo St | new fire sprinkler system to (2) adu basement, with underground. ref 201704285137 s1Details
new fire sprinkler system to (2) adu basement, with underground. ref 201704285137 s1 | $20,000 |
| Jun 17, 2019 | Completed final sign-off Sep 2021 | 2342 03rd St | new fire sprinkler system for interior and underground connection.Details
new fire sprinkler system for interior and underground connection. | $20,000 |
| Feb 21, 2019 | Never finaled issued Feb 2019, no final | 272 Clara St | rev pa #201707262987; revision on approved fire sprinkler underground plan n/a maherDetails
rev pa #201707262987; revision on approved fire sprinkler underground plan n/a maher | $8,000 |
| Feb 11, 2019 | Completed final sign-off Feb 2021 | 1072 Noe St | develop a new fire sprinkler systemDetails
develop a new fire sprinkler system | $25,000 |
| Dec 11, 2018 | Completed final sign-off Feb 2020 | 1619 Ocean Av | recommencement and completion of work approved under pa 201502279527.Details
recommencement and completion of work approved under pa 201502279527. | $4,000 |
| Nov 16, 2018 | Expired or cancelled cancelled Aug 2023 | 226 Balboa St | fire sprinkler systemDetails
fire sprinkler system | $15,000 |
| Nov 16, 2018 | Expired or cancelled cancelled Aug 2023 | 234 Balboa St | fire sprinkler systemDetails
fire sprinkler system | $15,000 |
| Aug 29, 2018 | Completed final sign-off Oct 2018 | 987 Dolores St | to obtain final inspection for work approved under pa #2014-0506-5005. all work is completeDetails
to obtain final inspection for work approved under pa #2014-0506-5005. all work is complete | |
| Aug 23, 2018 | Completed final sign-off May 2019 | 239 25th Av | ref#201609087095. change/update engineer of record only, for soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. no changes to structural design. same work as pa #201609087095.Details
ref#201609087095. change/update engineer of record only, for soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. no changes to structural design. same work as pa #201609087095. | |
| Jun 12, 2018 | Completed final sign-off Mar 2019 | 140 Turk St | commercial space - partition wall for new office. repair water damaged ceiling, correction to notice of violation #201846771. maher naDetails
commercial space - partition wall for new office. repair water damaged ceiling, correction to notice of violation #201846771. maher na | $5,000 |
| May 30, 2018 | Completed final sign-off Oct 2019 | 55 Sequoia Wy | revision to pa 2017-1212-6248, alarm monitoring not requred. remove from scopeDetails
revision to pa 2017-1212-6248, alarm monitoring not requred. remove from scope | |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 1710 Larkin St | interior remodel re-routing lighting, setting tile. reinstall plumbing fixtures. remodel in units 3, 11, and 12 only. non structural work onlyDetails
interior remodel re-routing lighting, setting tile. reinstall plumbing fixtures. remodel in units 3, 11, and 12 only. non structural work only | $60,000 |
| Feb 8, 2018 | Never finaled filed Feb 2018, never issued | 234 Balboa St | change of use. change (e) building to childcare centerDetails
change of use. change (e) building to childcare center | $30,000 |
| Feb 8, 2018 | Expired or cancelled expired Feb 2026 | 226 Balboa St | change of use. change (e) building to childcare centerDetails
change of use. change (e) building to childcare center | $30,000 |
| Jan 12, 2018 | Completed final sign-off Sep 2024 | 728 Cole St | new partial fire sprinkler system to nfpa 13 for public community space only. ref pa 201605127280, total 13 sprinklers, 262 gpm @ 38 psi. includes dedicated 4" pvc c900 fire underground service with 4" d.i. clp segment connector. safety margin ~4 psi. monitoring required, under separate permit.Details
new partial fire sprinkler system to nfpa 13 for public community space only. ref pa 201605127280, total 13 sprinklers, 262 gpm @ 38 psi. includes dedicated 4" pvc c900 fire underground service with 4" d.i. clp segment connector. safety margin ~4 psi. monitoring required, under separate permit. | $7,000 |
| Jan 10, 2018 | Completed final sign-off Feb 2019 | 2666 21st Av | new development fire sprinkler system. ref pa 2015-1222-5777, throughout entire building to nfpa 13d, 28 sprinklers, 24 copper k 1" combo fire/domestic service.Details
new development fire sprinkler system. ref pa 2015-1222-5777, throughout entire building to nfpa 13d, 28 sprinklers, 24 copper k 1" combo fire/domestic service. | $10,000 |
| Dec 12, 2017 | Completed final sign-off Oct 2019 | 55 Sequoia Wy | install fire sprinkler system with new 1-1/2" combination fire service off of 12-inch main on sequoia way at front portion of ground floor per nfpa 13r ref pa 2017-0601-8155Details
install fire sprinkler system with new 1-1/2" combination fire service off of 12-inch main on sequoia way at front portion of ground floor per nfpa 13r ref pa 2017-0601-8155 | $12,000 |
| Nov 30, 2017 | Completed final sign-off Jan 2019 | 993 Dolores St | revision/modify pa #201603162175 - creates adu. modification- adds addition media room space, creates entry lobby off of dolores street by reducing size of garage & storage areas. add (n) bath. correct 201603162175 unit count from 5 to 6.Details
revision/modify pa #201603162175 - creates adu. modification- adds addition media room space, creates entry lobby off of dolores street by reducing size of garage & storage areas. add (n) bath. correct 201603162175 unit count from 5 to 6. | $20,000 |
| Aug 23, 2017 | Completed final sign-off Aug 2025 | 693 Sutter St | this permit is to consolidate all architectural permits per dbi request for conversion of office building to residential. permits to include 200208194350, 200409174492, 200508241157, 200712241222, 200804290902,200804290904, 200912243842, 201106107871, 201311262876, 201501206130.Details
this permit is to consolidate all architectural permits per dbi request for conversion of office building to residential. permits to include 200208194350, 200409174492, 200508241157, 200712241222, 200804290902,200804290904, 200912243842, 201106107871, 201311262876, 201501206130. | |
| Aug 21, 2017 | Completed final sign-off Aug 2018 | 985 Church St | install new fire sprinkler system on 1st fl per nfa 13r. new underground 2" fire water service from sidewalk. ref pa #201605036406.Details
install new fire sprinkler system on 1st fl per nfa 13r. new underground 2" fire water service from sidewalk. ref pa #201605036406. | $13,000 |
| Feb 16, 2017 | Never finaled issued Mar 2017, no final | 987 Dolores St | 1st floor - design & build new fire sprinkler system to legalize existing unit. ref pa#201603162175.Details
1st floor - design & build new fire sprinkler system to legalize existing unit. ref pa#201603162175. | $8,000 |
| Feb 16, 2017 | Never finaled issued Feb 2017, no final | 188 Quane St | design & build new fire sprinkler system. ref pa#201405064989.Details
design & build new fire sprinkler system. ref pa#201405064989. | $5,000 |
| Dec 29, 2016 | Expired or cancelled cancelled Jul 2023 | 4221 Geary Bl | new system of fire sprinkler to be built. ref #201503160999Details
new system of fire sprinkler to be built. ref #201503160999 | $25,000 |
| Dec 6, 2016 | Never finaled filed Dec 2016, never issued | 171 Farallones St | comply with nov 201636191. legalize 2 windows on west side. remove 1 window and infill at garageDetails
comply with nov 201636191. legalize 2 windows on west side. remove 1 window and infill at garage | $1,500 |
| Oct 18, 2016 | Completed final sign-off Jun 2017 | 170 Bridgeview Dr | installation new fire sprinkler system on upper basement and lower basement & installation of underground. ref app#2016-0816-5069Details
installation new fire sprinkler system on upper basement and lower basement & installation of underground. ref app#2016-0816-5069 | $4,000 |
| Sep 8, 2016 | Completed final sign-off May 2019 | 239 25th Av | soft story retrofit to comply w/2016 sfebc chapter 4d based on 2016 cebc. appendix a-4Details
soft story retrofit to comply w/2016 sfebc chapter 4d based on 2016 cebc. appendix a-4 | $40,000 |
| Aug 16, 2016 | Never finaled issued Aug 2016, no final | 1624 Bay St | relocate extg fire sprinkler head at 5 number each due to interior remodel. n/a for maherDetails
relocate extg fire sprinkler head at 5 number each due to interior remodel. n/a for maher | $1,500 |
| Jul 12, 2016 | Expired or cancelled cancelled Jan 2026 | 85 Turner Tr | demo 5' long 8' height non-bearing wall without change structural, to enlarge usage, layout of building.Details
demo 5' long 8' height non-bearing wall without change structural, to enlarge usage, layout of building. | $1,000 |
| Mar 16, 2016 | Completed final sign-off Jan 2019 | 987 Dolores St | create new additional (studio) unit at (e) garage space. under ordinance 161-15.Details
create new additional (studio) unit at (e) garage space. under ordinance 161-15. | $55,000 |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 2882 Geary Bl | to complete work approved under building application #201410158993.Details
to complete work approved under building application #201410158993. | $30,000 |
| Nov 2, 2015 | Completed final sign-off Nov 2016 | 3359 26th St | add equipment for a cafe in the art gallery, the cafe is an auxiliary use to the gallery, ref. to t.i. pa# 201507212056 for art gallery. l/s under separate permit.Details
add equipment for a cafe in the art gallery, the cafe is an auxiliary use to the gallery, ref. to t.i. pa# 201507212056 for art gallery. l/s under separate permit. | $5,000 |
| Oct 6, 2015 | Completed final sign-off Mar 2019 | 1789 45th Av | to comply 201556761 (bid). convert existing 2nd floor office to single family dwelling.Details
to comply 201556761 (bid). convert existing 2nd floor office to single family dwelling. | $5,000 |
| Jul 21, 2015 | Completed final sign-off Jul 2016 | 3359 26th St | change of use from laundry to art gallery. ti work for use of space as an art gallery. sprinklers throughout building under separate permit.Details
change of use from laundry to art gallery. ti work for use of space as an art gallery. sprinklers throughout building under separate permit. | $18,000 |
| May 1, 2015 | Completed final sign-off Jun 2016 | 3359 26th St | interior remodel of the residential unit: kitchen remodel, bathroom, and powder room remodel. new bathroom, reconfigure non-bearing walls on 2nd floor only.Details
interior remodel of the residential unit: kitchen remodel, bathroom, and powder room remodel. new bathroom, reconfigure non-bearing walls on 2nd floor only. | $55,000 |
| Feb 18, 2015 | Completed final sign-off Jan 2016 | 279 26th Av | to obtain final inspection for work approved under pa 201301248633; all work is complete.Details
to obtain final inspection for work approved under pa 201301248633; all work is complete. | |
| May 6, 2014 | Never finaled issued Sep 2015, no final | 987 Dolores St | combined 2 units in unit 991. remove fire rated door separating units combine electrical panel. ( no change to unit count, submitted with apl #2014-05-06-4989 to add 1 dwelling.Details
combined 2 units in unit 991. remove fire rated door separating units combine electrical panel. ( no change to unit count, submitted with apl #2014-05-06-4989 to add 1 dwelling. | $3,500 |
| Aug 29, 2013 | Expired or cancelled withdrawn Nov 2014 | 1984 Great Hy | revision to pa #2013.05.14.6833 - re-routing ada ramp erection new door opening, re-configure ground floor ada kid bathroom, repair staircase from 2nd floor to attic.Details
revision to pa #2013.05.14.6833 - re-routing ada ramp erection new door opening, re-configure ground floor ada kid bathroom, repair staircase from 2nd floor to attic. | $3,000 |
| Aug 29, 2013 | Expired or cancelled withdrawn Nov 2014 | 1984 Great Hy | comply w/nov #201313041 - revision to pa #2013.07.25.2783: repair dryrotted wooden deck, erection new staircase fro emergency exit. work scope more than 50%.Details
comply w/nov #201313041 - revision to pa #2013.07.25.2783: repair dryrotted wooden deck, erection new staircase fro emergency exit. work scope more than 50%. | $3,000 |
| Aug 27, 2013 | Never finaled issued Sep 2013, no final | 1984 Great Hy | fire sprinkler system installation. arch pa# 2013/01/08/7442 & pa# 2013/05/14/6833. mech pa# 2013/07/24/2639.Details
fire sprinkler system installation. arch pa# 2013/01/08/7442 & pa# 2013/05/14/6833. mech pa# 2013/07/24/2639. | $10,000 |
| Aug 26, 2013 | Never finaled issued Aug 2013, no final | 1635 26th Av | remove the basement kitchen, legalize (e) bathroom on ground floorDetails
remove the basement kitchen, legalize (e) bathroom on ground floor | $500 |
| Jul 25, 2013 | Completed final sign-off May 2014 | 1984 Great Hy | comply with complaint #201313041 (bid)-repair (e) dry rot on exteior wooden deck & staircase. the location of deck is located in side of house. less than 50%Details
comply with complaint #201313041 (bid)-repair (e) dry rot on exteior wooden deck & staircase. the location of deck is located in side of house. less than 50% | $3,000 |
| Jul 25, 2013 | Completed final sign-off Nov 2014 | 1984 Great Hy | replace existing cracked wood beam and post with 8x67 steel beam and steel column ref 201301087442Details
replace existing cracked wood beam and post with 8x67 steel beam and steel column ref 201301087442 | $10,000 |
| Jul 24, 2013 | Completed final sign-off May 2014 | 1984 Great Hy | install new 2 furnaces.historic bldg. pa #2013.01.08.7442.outright air intake and toilet exhaust extg bldg. no vent.Details
install new 2 furnaces.historic bldg. pa #2013.01.08.7442.outright air intake and toilet exhaust extg bldg. no vent. | $10,000 |
| Jul 5, 2013 | Never finaled issued Jun 2014, no final | 2886 Geary Bl | install fire sprinkler system to sprinkler entire 2/f thru 4th floors to make the entire building fully sprinklered. ref arch submittil 2011/06/02/7305 for conversion of two office spaces to residential units.Details
install fire sprinkler system to sprinkler entire 2/f thru 4th floors to make the entire building fully sprinklered. ref arch submittil 2011/06/02/7305 for conversion of two office spaces to residential units. | $30,000 |
| May 14, 2013 | Completed final sign-off May 2014 | 1984 Great Hy | changes to approved permit app#201301087442. 1)relocate extg handicapped ramp. 2)keep extg bathroom on the 2nd floor.Details
changes to approved permit app#201301087442. 1)relocate extg handicapped ramp. 2)keep extg bathroom on the 2nd floor. | $5,000 |
| Mar 5, 2013 | Completed final sign-off Sep 2013 | 2809 San Bruno Av | installation fire sprinkler system for 1/f per nfpa13 & underground (meter to be reissued under new permit). sprinkler plan #201111088512 was cancelled, construction pa#200705181706Details
installation fire sprinkler system for 1/f per nfpa13 & underground (meter to be reissued under new permit). sprinkler plan #201111088512 was cancelled, construction pa#200705181706 | $5,000 |
| Jan 24, 2013 | Completed final sign-off Apr 2015 | 279 26th Av | install fire sprinkler system. 70 sprinklers per nfpa 13. includes underground. (as required under pa# 200605091174).Details
install fire sprinkler system. 70 sprinklers per nfpa 13. includes underground. (as required under pa# 200605091174). | $20,000 |
| Jan 8, 2013 | Completed final sign-off May 2014 | 1984 Great Hy | change of use from church to children center as approved by hearing. tenant improvement removal of interior partition wall. add children & staff toilet. construction of (n) ada ramp on front door. demo (e) ada ramp on backyard. adding smoke barrier to 2nd floor.Details
change of use from church to children center as approved by hearing. tenant improvement removal of interior partition wall. add children & staff toilet. construction of (n) ada ramp on front door. demo (e) ada ramp on backyard. adding smoke barrier to 2nd floor. | $60,000 |
| Oct 26, 2010 | Never finaled issued Oct 2010, no final | 2864 San Bruno Av | revision to appl #201010052285: water meter size revision per water department requested.Details
revision to appl #201010052285: water meter size revision per water department requested. | |
| Oct 5, 2010 | Never finaled issued Oct 2010, no final | 2864 San Bruno Av | new fire sprinkler system and 2-inch underground pipe installation-per nfpa 13 (garage); nfpa 13d (living area); nfpa 13 & 24 (underground)Details
new fire sprinkler system and 2-inch underground pipe installation-per nfpa 13 (garage); nfpa 13d (living area); nfpa 13 & 24 (underground) | $10,000 |
| Sep 13, 2010 | Completed final sign-off Apr 2011 | 430 Balboa St | submit revised drawing per app#201009010034 for layout of fire sprinkler system.change 2inch combination to 2inch fire service;add notes to show plan check comments.Details
submit revised drawing per app#201009010034 for layout of fire sprinkler system.change 2inch combination to 2inch fire service;add notes to show plan check comments. | $12,000 |
| Sep 1, 2010 | Completed final sign-off Apr 2011 | 430 Balboa St | fire sprinkler system installation for 2 family residential 13d in resdidential, nfpa 13 in garage, 2" combination fire service underground pipe installation.40 sprinklersDetails
fire sprinkler system installation for 2 family residential 13d in resdidential, nfpa 13 in garage, 2" combination fire service underground pipe installation.40 sprinklers | $10,000 |