Block 0029, lot 007
555 North Point St
- City’s use
- Commercial Hotel
- Built
- 1990
- Stories
- 5
- Rooms
- 316 bedrooms, 333 bathrooms
- Building
- 198,544 sq ft
- Lot
- 60,537 sq ft
- Zoning
- C2
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
70 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 23, 2026 | In progress filed Jul 2026, not yet issued | 555 North Point St | Tide Wave Pools Inc | strip old pool plaster, re-plaster pool with white marcite plaster, install 8 aquastar 10fxxx round white drain covers., install 13 pool fittings and properly haul and dispose of all plaster debris.Details
strip old pool plaster, re-plaster pool with white marcite plaster, install 8 aquastar 10fxxx round white drain covers., install 13 pool fittings and properly haul and dispose of all plaster debris. | $17,500 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 555 North Point St | to obtain final inspection for work approved under pa# 201405216410 & 201408194119. all work is complete.Details
to obtain final inspection for work approved under pa# 201405216410 & 201408194119. all work is complete. | ||
| Oct 2, 2025 | Completed final sign-off Jun 2026 | 555 North Point St | Continental Contractors Inc | 2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing).Details
2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). | $650,000 |
| Oct 2, 2025 | Completed final sign-off May 2026 | 555 North Point St | Continental Contractors Inc | 4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes.Details
4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes. | $930,000 |
| Sep 19, 2025 | Completed final sign-off Jun 2026 | 555 North Point St | Continental Contractors Inc | to obtain final inspection for work approved under pa 201504093287. all work is complete.Details
to obtain final inspection for work approved under pa 201504093287. all work is complete. | |
| May 30, 2023 | Completed final sign-off Mar 2024 | 555 North Point St | Centric Construction Inc | interior alterations prefunction finishes, lighting, ff&e, ada compliance, door hardware. meeting spaces, finishes, lighting ff+e, public restrooms, layouts to comply with current ada code complianceDetails
interior alterations prefunction finishes, lighting, ff&e, ada compliance, door hardware. meeting spaces, finishes, lighting ff+e, public restrooms, layouts to comply with current ada code compliance | $700,000 |
| Nov 16, 2021 | Completed final sign-off Dec 2021 | 555 North Point St | M L S Builder Inc. | relocate and replace total 2 f.s. heads at rooms 545 and 454. re-route 1 fire sprinkler line at room #454. ref app#202104299570Details
relocate and replace total 2 f.s. heads at rooms 545 and 454. re-route 1 fire sprinkler line at room #454. ref app#202104299570 | $3,000 |
| Aug 10, 2021 | Completed final sign-off Dec 2021 | 555 North Point St | Global Managing Innovations Inc Dba Nati | barrier removal related to accessible business entrance program 51-16 category 2. including item 1: route from accessible passenger loading zone exceeds 1:48.regrade excessive slipes at accessible passenger loading zone; new handrails at (e) ramp (in parking lot)Details
barrier removal related to accessible business entrance program 51-16 category 2. including item 1: route from accessible passenger loading zone exceeds 1:48.regrade excessive slipes at accessible passenger loading zone; new handrails at (e) ramp (in parking lot) | $25,000 |
| Apr 29, 2021 | Completed final sign-off Feb 2022 | 555 North Point St | Global Managing Innovations Inc Dba Nati | room 554: barrier removal at executive suite to a mobility accessible guestroom to meet dispersion. scope includes reconfiguration of bathroom, replacement of plumbing fixtures, and replacement of finishes to match existing.Details
room 554: barrier removal at executive suite to a mobility accessible guestroom to meet dispersion. scope includes reconfiguration of bathroom, replacement of plumbing fixtures, and replacement of finishes to match existing. | $55,000 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 555 North Point St | Megahertz Electric | sign permit non electric wall lettersDetails
sign permit non electric wall letters | $1,500 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 555 North Point St | Megahertz Electric | sign permit 2 bannersDetails
sign permit 2 banners | $1,500 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 555 North Point St | Megahertz Electric | install entrance sign wall plaque. n/a maher ordinanceDetails
install entrance sign wall plaque. n/a maher ordinance | $1,000 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 555 North Point St | Megahertz Electric | sign permit electric wall sign maher not reqDetails
sign permit electric wall sign maher not req | $5,000 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 555 North Point St | Megahertz Electric | sign permitDetails
sign permit | $5,000 |
| Sep 25, 2015 | Completed final sign-off Oct 2015 | 555 North Point St | Johnson Controls Fire | as built drawings consist of deleting sheet fa-102. no work performed for room 476,491,591 & 576 extg device location to renewal. t.i. app#201507171766. n/a maher.Details
as built drawings consist of deleting sheet fa-102. no work performed for room 476,491,591 & 576 extg device location to renewal. t.i. app#201507171766. n/a maher. | |
| Aug 7, 2015 | Never finaled issued Aug 2015, no final | 555 North Point St | Interserv Lp, Global Managing Innovations Inc Dba Nati | revision to app#201408194119 to upgrade men's and womens restroom in lobby. n/a for maher.Details
revision to app#201408194119 to upgrade men's and womens restroom in lobby. n/a for maher. | $25,000 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 555 North Point St | Johnson Controls Fire | fire alarm as built drawings are to remove and replace 120 v smoke detectors with strobe to 120v smoke detectors with sounder base for local alarm only. extg ada rooms shall remain unchange. t.i. app#201504083158. n/a for maher. ref app#201506037997Details
fire alarm as built drawings are to remove and replace 120 v smoke detectors with strobe to 120v smoke detectors with sounder base for local alarm only. extg ada rooms shall remain unchange. t.i. app#201504083158. n/a for maher. ref app#201506037997 | |
| Apr 9, 2015 | Never finaled issued Jun 2015, no final | 555 North Point St | Interserv L P | for administrative purposes only to correct record guest room count as 316, changed from 313. no construction or alteration work of any kindDetails
for administrative purposes only to correct record guest room count as 316, changed from 313. no construction or alteration work of any kind | |
| Apr 8, 2015 | Completed final sign-off Oct 2015 | 555 North Point St | Johnson Controls Fire | fire alarm ti consist of guestroom remodel and ada upgrade on 2nd, 3rd, 4th, 5th fl. relocate 24 existing strobes to newly extended bathrooms per construction upgrade to existing ada rooms. add 2 new speakers and, 1 to each of 2 new guestrooms created by splitting and existing room. app 201408184023Details
fire alarm ti consist of guestroom remodel and ada upgrade on 2nd, 3rd, 4th, 5th fl. relocate 24 existing strobes to newly extended bathrooms per construction upgrade to existing ada rooms. add 2 new speakers and, 1 to each of 2 new guestrooms created by splitting and existing room. app 201408184023 | $25,000 |
| Feb 19, 2015 | Never finaled issued Feb 2015, no final | 555 North Point St | street spaceDetails
street space | ||
| Feb 17, 2015 | Completed final sign-off Mar 2015 | 555 North Point St | Johnson Controls Fire | 2nd,3rd,4th, & 5th floors: add and relocate new fire spirnklers for the new guest room remodel and ada upgrades per new t.i. drawing. total of 24 fire sprinklers. ref app#201408184023Details
2nd,3rd,4th, & 5th floors: add and relocate new fire spirnklers for the new guest room remodel and ada upgrades per new t.i. drawing. total of 24 fire sprinklers. ref app#201408184023 | $15,000 |
| Jan 5, 2015 | Completed final sign-off Jun 2015 | 555 North Point St | Interserv Lp | renovation of 4 hotel rooms 476, 491, 576, 591 for full ada accessibility. no other work. mep and fire protection on sep permit maher not reqDetails
renovation of 4 hotel rooms 476, 491, 576, 591 for full ada accessibility. no other work. mep and fire protection on sep permit maher not req | $40,000 |
| Dec 9, 2014 | Never finaled issued Dec 2014, no final | 555 North Point St | street spaceDetails
street space | ||
| Sep 17, 2014 | Completed final sign-off Oct 2014 | 555 North Point St | Western States Fire Protection Co. | tenant improvement for existing fire sprinkler system in breakfast room: 10 relocates, 2 adds, 1 removedDetails
tenant improvement for existing fire sprinkler system in breakfast room: 10 relocates, 2 adds, 1 removed | $15,000 |
| Aug 19, 2014 | Never finaled issued Feb 2015, no final | 555 North Point St | Interserv Lp | work on 1st fl only.installation of an escalator in lobbby w/new stair, new lobby railing. renovation of reception back of house into market. minor basement office reconfiguration below escalator pit. sprinklers, fire alarm sep permits n/a for maher ordinance.Details
work on 1st fl only.installation of an escalator in lobbby w/new stair, new lobby railing. renovation of reception back of house into market. minor basement office reconfiguration below escalator pit. sprinklers, fire alarm sep permits n/a for maher ordinance. | $825,000 |
| Aug 18, 2014 | Never finaled issued Dec 2014, no final | 555 North Point St | Interserv Lp | 2nd thru 5th floor - accessible room renovation for 12 accessible guest rooms & bathrooms, miscellaneous partition & outlet work in non-accessible guest rooms. conversion of 2 suites to 6 guest rooms. n/a maher ordinanceDetails
2nd thru 5th floor - accessible room renovation for 12 accessible guest rooms & bathrooms, miscellaneous partition & outlet work in non-accessible guest rooms. conversion of 2 suites to 6 guest rooms. n/a maher ordinance | $200,000 |
| May 21, 2014 | Never finaled issued Aug 2014, no final | 555 North Point St | Global Managing Innovations Inc Dba Nati | partition alterations, drywall ceiling alterations, new lighting and electrical minor plumbing work at 1/f restaurant. n/a for the maher ordinance #155-13Details
partition alterations, drywall ceiling alterations, new lighting and electrical minor plumbing work at 1/f restaurant. n/a for the maher ordinance #155-13 | $140,000 |
| Oct 10, 2012 | Expired or cancelled cancelled Jan 2026 | 555 North Point St | Pomi Mechanical Inc | replace extg cooling, tower. replacement will be like for like.Details
replace extg cooling, tower. replacement will be like for like. | $75,000 |
| May 23, 2012 | Completed final sign-off Feb 2013 | 555 North Point St | Red Hawk Fire & Security Ca Llc | 1st floor-fire alarm as builts submission for 201103021232. remove led indicators for duct detectors- moving door - removing smoke detector and door hold openDetails
1st floor-fire alarm as builts submission for 201103021232. remove led indicators for duct detectors- moving door - removing smoke detector and door hold open | |
| Jan 11, 2012 | Completed final sign-off Feb 2013 | 555 North Point St | Red Hawk Fire & Security Ca Llc | 1st floor fire alarm t.i. 8-addressable smoke detectors, 3 duct detectors, 4-control relays, 2-wall strobes, 8-ceiling speaker/strobes, 1-wall speaker/strobe.Details
1st floor fire alarm t.i. 8-addressable smoke detectors, 3 duct detectors, 4-control relays, 2-wall strobes, 8-ceiling speaker/strobes, 1-wall speaker/strobe. | $12,385 |
| Dec 21, 2011 | Completed final sign-off Jun 2012 | 555 North Point St | J S J Electrical Display Corp | change mounting detail. alternate mounting detail to signs on pa# 201111098573Details
change mounting detail. alternate mounting detail to signs on pa# 201111098573 | $1,000 |
| Nov 18, 2011 | Completed final sign-off Feb 2012 | 555 North Point St | Westates Mechanical Corporation Inc | add & relocate fire sprinklers as required by tenant improvements at the meeting rooms & service corridors, restrooms & laptop lounge. ref app #201109295799Details
add & relocate fire sprinklers as required by tenant improvements at the meeting rooms & service corridors, restrooms & laptop lounge. ref app #201109295799 | $4,500 |
| Nov 17, 2011 | Never finaled issued Nov 2011, no final | 555 North Point St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Nov 9, 2011 | Completed final sign-off Jun 2012 | 555 North Point St | J S J Electrical Display Corp | erect a electric wall single faced direct new signDetails
erect a electric wall single faced direct new sign | $24,000 |
| Nov 9, 2011 | Completed final sign-off Jun 2012 | 555 North Point St | J S J Electrical Display Corp | erect a non electric wall single faced non illuminated replacement signDetails
erect a non electric wall single faced non illuminated replacement sign | $5,500 |
| Sep 29, 2011 | Completed final sign-off Apr 2013 | 555 North Point St | Howard S. Wright Constructors Lp | new ingress / access corridor to allow independant accessible path of travel to 4 meeting rooms. (e) meeting rooms will receive new finishes, paint, carpet, trim, wall covering, some rooms will receive new / replaced light fixtures. toilet facilities being renovated completly & fully accessible.Details
new ingress / access corridor to allow independant accessible path of travel to 4 meeting rooms. (e) meeting rooms will receive new finishes, paint, carpet, trim, wall covering, some rooms will receive new / replaced light fixtures. toilet facilities being renovated completly & fully accessible. | $962,576 |
| Sep 7, 2011 | Completed final sign-off Apr 2012 | 555 North Point St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $995,171 |
| Mar 2, 2011 | Completed final sign-off Dec 2011 | 555 North Point St | Red Hawk Fire & Security Ca Llc | fire alarm t.i.-add 1 speaker/strobe to new hotel entranceDetails
fire alarm t.i.-add 1 speaker/strobe to new hotel entrance | $3,000 |
| Dec 13, 2010 | Never finaled issued Dec 2010, no final | 555 North Point St | Northern Sun Associates | new unconditioned entry vestibule under (e) entry canopyDetails
new unconditioned entry vestibule under (e) entry canopy | $140,000 |
| Nov 23, 2010 | Completed final sign-off Jan 2011 | 555 North Point St | Central Sign Services | hyatt. replace (e) illuminated wall sign on (e) steel canopy with new illuminated wall signDetails
hyatt. replace (e) illuminated wall sign on (e) steel canopy with new illuminated wall sign | $1,500 |
| Feb 17, 2010 | Completed final sign-off Jul 2010 | 2545 Taylor St | revision to appl #200910300237: sliding doors to be deleted from plan & replaced by swinging doors.Details
revision to appl #200910300237: sliding doors to be deleted from plan & replaced by swinging doors. | ||
| Oct 30, 2009 | Completed final sign-off Jul 2010 | 2545 Taylor St | parital replacement of existing storefront. remove existing non struct partition patch and paint. new sales counterDetails
parital replacement of existing storefront. remove existing non struct partition patch and paint. new sales counter | $30,000 | |
| Feb 12, 2009 | Never finaled issued Feb 2009, no final | 555 North Point St | Red Hawk Fire & Security Ca Llc | to obtain final inspection for work approved under appl#200311251116. all work has been completedDetails
to obtain final inspection for work approved under appl#200311251116. all work has been completed | |
| Dec 15, 2008 | Completed final sign-off Feb 2009 | 555 North Point St | Aquamatic Fire Protection | add 3 new sprinklers due to interior remodel- remove class ii standpipe hose rack in closet---Details
add 3 new sprinklers due to interior remodel- remove class ii standpipe hose rack in closet--- | $2,500 |
| Dec 3, 2008 | Never finaled issued Dec 2008, no final | 555 North Point St | street spaceDetails
street space | ||
| Nov 20, 2008 | Completed final sign-off Jan 2009 | 555 North Point St | Northern Sun Associates | interior renovation of (e) restaurant. new kitchen equipment and minor lighting upgrades. new tile floor, furnishings wainscots, new tile on kitchen, bar diewalls, new kitchen & bar counters.Details
interior renovation of (e) restaurant. new kitchen equipment and minor lighting upgrades. new tile floor, furnishings wainscots, new tile on kitchen, bar diewalls, new kitchen & bar counters. | $300,000 |
| Jul 18, 2008 | Completed final sign-off Sep 2008 | 555 North Point St | Rainbow Waterproofing & Restor | install cfrp (carbon fiber reinforcing polymer) to underside of garage concrete ceiling. replace fixtures in garage. work performed in anticipation of later floor leveling work noy part of this application.insulate fumes to area of wk ventilate area per req of manufacture of epoxy.Details
install cfrp (carbon fiber reinforcing polymer) to underside of garage concrete ceiling. replace fixtures in garage. work performed in anticipation of later floor leveling work noy part of this application.insulate fumes to area of wk ventilate area per req of manufacture of epoxy. | $154,000 |
| May 4, 2007 | Never finaled issued May 2007, no final | 555 North Point St | street space permitDetails
street space permit | ||
| Dec 13, 2006 | Completed final sign-off Mar 2008 | 555 North Point St | remodel main lobby area of hotel at ground floor. no structural work.Details
remodel main lobby area of hotel at ground floor. no structural work. | $315,000 | |
| Oct 23, 2006 | Completed final sign-off Mar 2007 | 555 North Point St | t.i in existing excercise woom to accommodate upgrade equipment work includes new light fixtures. relocated outlets, removal of sauna & enlargement of bathroom for ada. no exterior or other construction work.Details
t.i in existing excercise woom to accommodate upgrade equipment work includes new light fixtures. relocated outlets, removal of sauna & enlargement of bathroom for ada. no exterior or other construction work. | $76,000 | |
| May 11, 2006 | Completed final sign-off Jul 2006 | 555 North Point St | remodel in 36 bathrooms within extg guest rooms on 5th floor. work includes new tile in showers, new shower head, new vanity, new faucet, new toilet, new fixturing. no exterior workDetails
remodel in 36 bathrooms within extg guest rooms on 5th floor. work includes new tile in showers, new shower head, new vanity, new faucet, new toilet, new fixturing. no exterior work | $208,000 | |
| Apr 12, 2006 | Completed final sign-off Jul 2006 | 555 North Point St | t.i. in 37 bathrooms of guest rooms on 3/f only. work includes install (n) showers, vanity sinks, faucet fixtures, toilets. no exterior or other construction work. fire protection under seperate permit. demo work previously under approved appl#200602225175Details
t.i. in 37 bathrooms of guest rooms on 3/f only. work includes install (n) showers, vanity sinks, faucet fixtures, toilets. no exterior or other construction work. fire protection under seperate permit. demo work previously under approved appl#200602225175 | $750,000 | |
| Apr 12, 2006 | Completed final sign-off Jul 2006 | 555 North Point St | revision to appl#200603247503 work is to renovate 2 ada bathrooms on 2/floor only. no other work.Details
revision to appl#200603247503 work is to renovate 2 ada bathrooms on 2/floor only. no other work. | $40,000 | |
| Mar 24, 2006 | Completed final sign-off Jul 2006 | 555 North Point St | t.i. in 9 bathrooms/guest rooms on 2nd floor only work includes installtion of new showers, vanity sinks, faucet6 fixtures and toilets/no exterior ro other construction work/fire protection under separate permit/demo permit privious approved under app #200602215061Details
t.i. in 9 bathrooms/guest rooms on 2nd floor only work includes installtion of new showers, vanity sinks, faucet6 fixtures and toilets/no exterior ro other construction work/fire protection under separate permit/demo permit privious approved under app #200602215061 | $200,000 | |
| Mar 7, 2006 | Completed final sign-off Jun 2006 | 555 North Point St | t.i. in 37 bathrooms/guestrooms on 4th floor only. work includes installation of (n) showers, vanity sinks, faucet fixtures & toilets. no exterior or other construction work.Details
t.i. in 37 bathrooms/guestrooms on 4th floor only. work includes installation of (n) showers, vanity sinks, faucet fixtures & toilets. no exterior or other construction work. | $200,000 | |
| Feb 22, 2006 | Completed final sign-off Jun 2006 | 555 North Point St | demo work only in 41 bathrooms on 4th floor. removal of tub, shower-head & mixing device surrounding tiles & apporx 10 sq. ft of sheet rock around tub to extend plumbing. also remove under-counter mounted sink & faucet sets. no construction or other work. remodel under separate permit.Details
demo work only in 41 bathrooms on 4th floor. removal of tub, shower-head & mixing device surrounding tiles & apporx 10 sq. ft of sheet rock around tub to extend plumbing. also remove under-counter mounted sink & faucet sets. no construction or other work. remodel under separate permit. | $30,000 | |
| Feb 22, 2006 | Completed final sign-off Jul 2006 | 555 North Point St | demo work only in 38 bathrooms on 3rd floor. removal of tub, shower-head & mixing device surrounding tiles & apporx 10 sq. ft of sheet rock around tub to extend plumbing. also remove under-counter mounted sink & faucet sets. no construction or other work. remodel under separate permit.Details
demo work only in 38 bathrooms on 3rd floor. removal of tub, shower-head & mixing device surrounding tiles & apporx 10 sq. ft of sheet rock around tub to extend plumbing. also remove under-counter mounted sink & faucet sets. no construction or other work. remodel under separate permit. | $25,000 | |
| Feb 21, 2006 | Completed final sign-off Jul 2006 | 555 North Point St | 2nd floor-demo work only in 11 bathrooms on 2nd floor. removal of tub,shower head & mixing device surrounding tiles & approx 10 sq ft of sheetrock around tub to extend plumbing. also remove under counter mounted sink & faucet jets. no construction or other work. remodel under separate permit.Details
2nd floor-demo work only in 11 bathrooms on 2nd floor. removal of tub,shower head & mixing device surrounding tiles & approx 10 sq ft of sheetrock around tub to extend plumbing. also remove under counter mounted sink & faucet jets. no construction or other work. remodel under separate permit. | $7,500 | |
| Nov 2, 2005 | Never finaled issued Nov 2005, no final | 555 North Point St | streetspaceDetails
streetspace | ||
| Oct 12, 2005 | Never finaled issued Oct 2005, no final | 555 North Point St | street spaceDetails
street space | ||
| Jul 6, 2005 | Never finaled issued Jul 2005, no final | 555 North Point St | street spaceDetails
street space | ||
| Dec 19, 2003 | Never finaled issued Dec 2003, no final | 555 North Point St | Six Counties Fire Protect | install 2 fire sprinkler heads on 4th and 5th floor. to protect corridor window with central ws headDetails
install 2 fire sprinkler heads on 4th and 5th floor. to protect corridor window with central ws head | $1,000 |
| Nov 25, 2003 | Expired or cancelled expired Jan 2009 | 555 North Point St | Red Hawk Fire & Security Ca Llc | replace new fire alarm system, upgrade to add and local codes requirmentsDetails
replace new fire alarm system, upgrade to add and local codes requirments | $120,000 |
| Feb 26, 2003 | Never finaled issued Feb 2003, no final | 555 North Point St | street spaceDetails
street space | ||
| Dec 23, 2002 | Expired or cancelled expired Dec 2007 | 555 North Point St | A Better Image/G.W. Laine | to erect double faced electric signDetails
to erect double faced electric sign | |
| May 3, 2002 | Completed final sign-off May 2002 | 555 North Point St | Dpw Inc. | install 4 sprinkler head under new mezzanine in garageDetails
install 4 sprinkler head under new mezzanine in garage | $1,800 |
| Mar 8, 2002 | Expired or cancelled expired Sep 2002 | 555 North Point St | Arrow Sign Company | to install double faced projecting sign revsn 200110039848Details
to install double faced projecting sign revsn 200110039848 | $10,000 |
| Nov 30, 2001 | Completed final sign-off May 2002 | 555 North Point St | inst allation of prefabricated equipment storage (chairs) platform free standing above int. load doDetails
inst allation of prefabricated equipment storage (chairs) platform free standing above int. load do | $18,000 | |
| Oct 3, 2001 | Completed final sign-off Aug 2002 | 555 North Point St | Arrow Sign Company | erect a projecting, double faced, electric signDetails
erect a projecting, double faced, electric sign | $10,000 |
| Jan 12, 2000 | Expired or cancelled expired Jan 2001 | 555 North Point St | Blakeslee Electric, Inc | renew expired appl #9913826Details
renew expired appl #9913826 |