Continental Contractors Inc
- Based in
- Annapolis
- On San Francisco permits
- Jul 2013 to Oct 2025
- Last 24 months
- 3 permits filed
44 permits since 2000: 14 completed, 29 never finaled, 1 expired or cancelled.
Of the 29 never-finaled permits, 2 are 3 to 5 years old, 25 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2025 | Completed final sign-off Jun 2026 | 555 North Point St | 2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing).Details
2 and 3/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). | $650,000 |
| Oct 2, 2025 | Completed final sign-off May 2026 | 555 North Point St | 4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes.Details
4 and 5/fl- remodel guestrooms to include (n) finishes and fixtures (plumbing). remove barrier at (e) public bathroom at ground floor to include (n) fixtures and finishes. | $930,000 |
| Sep 19, 2025 | Completed final sign-off Jun 2026 | 555 North Point St | to obtain final inspection for work approved under pa 201504093287. all work is complete.Details
to obtain final inspection for work approved under pa 201504093287. all work is complete. | |
| Dec 16, 2022 | Never finaled issued Apr 2023, no final | 333 Battery St | 5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lightingDetails
5-14/flrs: renovation of guestrooms including n finishes, plumbing fixtures and lighting | $900,000 |
| Dec 16, 2022 | Never finaled issued Apr 2023, no final | 333 Battery St | 15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting.Details
15-24/flrs: renovations of guestrooms including new finishes, plumbing fixtures and lighting. | $900,000 |
| Jun 14, 2022 | Completed final sign-off Feb 2023 | 1800 Sutter St | renovation of (e) guest bathrooms including (n) floor and wall finishes, and (n) plumbing fixtures. conversion of (e) tubs to (n) showers.Details
renovation of (e) guest bathrooms including (n) floor and wall finishes, and (n) plumbing fixtures. conversion of (e) tubs to (n) showers. | $750,000 |
| Mar 2, 2022 | Completed final sign-off Aug 2022 | 550 Geary St | interior remodel of hotel public spaces on level 1 and 2. specific work includes new flooring, removal and addition of select doors and new built in cabinets. level 2 work is in (e) fitness center. level 1 work in (e) lounge, breakfast room and meeting room.Details
interior remodel of hotel public spaces on level 1 and 2. specific work includes new flooring, removal and addition of select doors and new built in cabinets. level 2 work is in (e) fitness center. level 1 work in (e) lounge, breakfast room and meeting room. | $120,000 |
| Jan 14, 2022 | Completed final sign-off Jun 2022 | 550 Geary St | select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work.Details
select work in 129 guestroom bathrooms. rooms in scope will feature a tub to shower conversion, including new tile & fixtures. fire life safety under separate permit. no exterior work. | $150,000 |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 550 Geary St | barrier removal permit: addiion of eight communication feature in (e) rooms. no exterior work. fire life safety under separated permit.Details
barrier removal permit: addiion of eight communication feature in (e) rooms. no exterior work. fire life safety under separated permit. | $30,000 |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 333 Battery St | 5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry.Details
5/f: renovation of two guestrooms and partial corridor, including new finishes, plumbing fixtures, light fixtures, and flooring. new tactile exist signs at hotel entry. | $10,000 |
| Oct 22, 2020 | Completed final sign-off Dec 2021 | 222 Mason St | renovation of guest bathrooms on l6-l12 and 14-21. slective demo and installation of finishes, doors, bathroom accessories, light fixtures and plumbing fixtures.Details
renovation of guest bathrooms on l6-l12 and 14-21. slective demo and installation of finishes, doors, bathroom accessories, light fixtures and plumbing fixtures. | $896,000 |
| Oct 29, 2019 | Completed final sign-off Feb 2020 | 125 03rd St | unit 1102. barrier removal at guestroom including new finishes, plumbing fixtures, and flooringDetails
unit 1102. barrier removal at guestroom including new finishes, plumbing fixtures, and flooring | $20,776 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 480 Sutter St | to obtain final inspection for work approved under pa #201807265588. all work is complete.Details
to obtain final inspection for work approved under pa #201807265588. all work is complete. | |
| Nov 1, 2018 | Completed final sign-off Dec 2018 | 2620 Jones St | to obtain final inspection for work approved under pa # 201307162004. all work is complete.Details
to obtain final inspection for work approved under pa # 201307162004. all work is complete. | |
| Oct 5, 2018 | Never finaled issued Oct 2018, no final | 480 Sutter St | lobby: title 24 compliance. electrical. replace (e) decorative lighting with new decorative lightin. replace a portion of 9e) decotrat lighting with new led can lights. add al imited amount of convience power. maher n/a.Details
lobby: title 24 compliance. electrical. replace (e) decorative lighting with new decorative lightin. replace a portion of 9e) decotrat lighting with new led can lights. add al imited amount of convience power. maher n/a. | $25,000 |
| Oct 3, 2018 | Completed final sign-off Oct 2019 | 480 Sutter St | renovate existing lobby level - renovation to include demo and construction of new walls, new interior glass pivot doors and new finishes throughout.nw stone top at extg buffet & extg bar hvac is existing to remain. nw lighting & electrical under separate permit. modification to extg ada bar.Details
renovate existing lobby level - renovation to include demo and construction of new walls, new interior glass pivot doors and new finishes throughout.nw stone top at extg buffet & extg bar hvac is existing to remain. nw lighting & electrical under separate permit. modification to extg ada bar. | $147,000 |
| Jul 26, 2018 | Never finaled issued Aug 2018, no final | 480 Sutter St | 7/f -renovate existing fitness center, renovate to include replacement of finishes & equipment. reconfigure entry to fitness center. hvac is existing to remain. existing 2x2 fluorescent lighting isto be replaced with led. new can lights are to be led. maher n/a.Details
7/f -renovate existing fitness center, renovate to include replacement of finishes & equipment. reconfigure entry to fitness center. hvac is existing to remain. existing 2x2 fluorescent lighting isto be replaced with led. new can lights are to be led. maher n/a. | $23,000 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | 20th fl - interior ti to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes & replacing tubs with showersDetails
20th fl - interior ti to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes & replacing tubs with showers | $205,000 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | 5th fl: interior ti to include finishes, like for like fixtures, in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
5th fl: interior ti to include finishes, like for like fixtures, in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 31, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | 6th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers.Details
6th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers. | $205,000 |
| Aug 31, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | 7th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers.Details
7th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers. | $205,000 |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | 9th fl - interior ti to include finishes, like for like fixtures in rest rooms. limited hardwall construction or layout changes & replacing tubs with showers.Details
9th fl - interior ti to include finishes, like for like fixtures in rest rooms. limited hardwall construction or layout changes & replacing tubs with showers. | $205,000 |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | 8th fl - interior ti to include finishes, like for like fixtures in restrooms. limited hardwall construction or layout changes, replacing tubs with showers.Details
8th fl - interior ti to include finishes, like for like fixtures in restrooms. limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 24, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | 14th fl - ref pa 2017-0504-5702 (1401 converted to 2 guestrooms)Details
14th fl - ref pa 2017-0504-5702 (1401 converted to 2 guestrooms) | |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | 12/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
12/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | 11/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
11/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | 10/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
10/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Jun 30, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | 16th floor: revise light fixtures. ref app#201704194347Details
16th floor: revise light fixtures. ref app#201704194347 | |
| Jun 30, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | 17th floor: revise light fixtures. ref app#201704194347Details
17th floor: revise light fixtures. ref app#201704194347 | |
| Jun 27, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | 19/f: revise light fixtures. ref 201703312946Details
19/f: revise light fixtures. ref 201703312946 | |
| Jun 27, 2017 | Never finaled issued Jun 2017, no final | 515 Mason St | 18th floor: revise light fixtures. ref 201704184253Details
18th floor: revise light fixtures. ref 201704184253 | |
| May 4, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | 13th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
13th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| May 4, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | 14th flr a/mep: interior improvement to include finishes, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers. convert room 1401 into two guest rooms. fire (sprinkler and alarm) under separate permits.Details
14th flr a/mep: interior improvement to include finishes, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers. convert room 1401 into two guest rooms. fire (sprinkler and alarm) under separate permits. | $205,000 |
| May 4, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | 15th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
15th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| Apr 20, 2017 | Never finaled issued Jun 2017, no final | 480 Sutter St | renovate existing 28th fl concierge lounge. convert existing presidential suite into (1) ada guestroom & (1) non-ada guestroom.n/a maher ordinance (presidential suite conversion to occur under this permit add,in liew of pa #201612296229.no presidential conversion to occur under pa #201612296229.)Details
renovate existing 28th fl concierge lounge. convert existing presidential suite into (1) ada guestroom & (1) non-ada guestroom.n/a maher ordinance (presidential suite conversion to occur under this permit add,in liew of pa #201612296229.no presidential conversion to occur under pa #201612296229.) | $140,000 |
| Apr 19, 2017 | Never finaled issued May 2017, no final | 515 Mason St | 17th fl: interior improvment to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers & finishesDetails
17th fl: interior improvment to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers & finishes | $205,000 |
| Apr 19, 2017 | Never finaled issued May 2017, no final | 515 Mason St | 16th fl: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
16th fl: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| Apr 18, 2017 | Never finaled issued May 2017, no final | 515 Mason St | interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| Mar 31, 2017 | Never finaled issued Apr 2017, no final | 515 Mason St | interior improvements to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers, and finishes.Details
interior improvements to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers, and finishes. | $205,000 |
| Dec 29, 2016 | Completed final sign-off Oct 2019 | 480 Sutter St | renovate (e) guestrooms and corridors. misc upgrades for accessibility (maher na)Details
renovate (e) guestrooms and corridors. misc upgrades for accessibility (maher na) | $2,000,000 |
| Feb 18, 2016 | Completed final sign-off Oct 2016 | 480 Sutter St | 2/f & 30/f - replacing finishes, replacing wall sconces, replacing decorative light fixtures & relocae electrical devices. n/a ordinance #155-13Details
2/f & 30/f - replacing finishes, replacing wall sconces, replacing decorative light fixtures & relocae electrical devices. n/a ordinance #155-13 | $62,560 |
| Jan 21, 2015 | Never finaled issued Feb 2015, no final | 250 Beach St | revision to appl #2014.0617.8592: removal of (e) shear walls located in room 3105 & related guest bathroom modification. mep & fire protection shall be part of separate permit. n/a maher ordinanceDetails
revision to appl #2014.0617.8592: removal of (e) shear walls located in room 3105 & related guest bathroom modification. mep & fire protection shall be part of separate permit. n/a maher ordinance | $1,200 |
| Jun 17, 2014 | Never finaled issued Nov 2014, no final | 250 Beach St | 2,3,4 fls. demo(e)elevator&stairs&partial removal(e)concrete beam.add(6)guest rooms incl non-structural partitions,mep finishes&windows.add stair&wheelchair lift.upgrade(e)room to ada,also replacement(e)vanity&sinks at all(e)guest rooms.selected reglaze(e)windows.fire alarm&sprinklers sep permit.Details
2,3,4 fls. demo(e)elevator&stairs&partial removal(e)concrete beam.add(6)guest rooms incl non-structural partitions,mep finishes&windows.add stair&wheelchair lift.upgrade(e)room to ada,also replacement(e)vanity&sinks at all(e)guest rooms.selected reglaze(e)windows.fire alarm&sprinklers sep permit. | $900,000 |
| Jul 16, 2013 | Expired or cancelled expired Dec 2018 | 2620 Jones St | ground floor public area, interior renovations & finish. improvement/renovate partial bathroom, renovate bar area. occupant load calc's sep permit- sffd assembly permit required.Details
ground floor public area, interior renovations & finish. improvement/renovate partial bathroom, renovate bar area. occupant load calc's sep permit- sffd assembly permit required. | $200,000 |