Block 0297, lot 028
515 Mason St
- City’s use
- Commercial Hotel
- Built
- 1987
- Stories
- 21
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 297,170 sq ft
- Lot
- 18,906 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
139 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 515 Mason St | R L H Fire Protection Inc | fire sprinkler permit. demo all sprinklers and piping from the elevator machine room, top of hoistways and elevator pits. 14 sprinklers total.Details
fire sprinkler permit. demo all sprinklers and piping from the elevator machine room, top of hoistways and elevator pits. 14 sprinklers total. | $3,500 |
| May 23, 2025 | In progress filed May 2025, not yet issued | 515 Mason St | barrier removal of the existing employee locker rooms. scope includes new plumbing fixtures, lighting, finishes and toilet partitions.Details
barrier removal of the existing employee locker rooms. scope includes new plumbing fixtures, lighting, finishes and toilet partitions. | $200,000 | |
| Mar 12, 2025 | In progress issued Jul 2026 | 515 Mason St | Tank Specialists Of California | installation of (4) above ground 1000gal fuel oil storage tanks in basementDetails
installation of (4) above ground 1000gal fuel oil storage tanks in basement | $658,000 |
| Nov 9, 2023 | Completed final sign-off Aug 2024 | 515 Mason St | Hathaway Dinwiddie Co. | employee dining and cafeteria remodel at (e) hotel. scope includes new floor and wall finish. new act tiles. new lighting and ff & e. relocate e) hand wash sinkDetails
employee dining and cafeteria remodel at (e) hotel. scope includes new floor and wall finish. new act tiles. new lighting and ff & e. relocate e) hand wash sink | $100,000 |
| Dec 21, 2021 | Completed final sign-off Oct 2023 | 515 Mason St | Hathaway Dinwiddie Co. | scope constists entirely of barrier removal related to the accessible business entrance program category 2.Details
scope constists entirely of barrier removal related to the accessible business entrance program category 2. | $250,000 |
| Sep 26, 2020 | Completed final sign-off Jul 2021 | 515 Mason St | Emcor Services/Mesa Energy Systems Inc | like for like replacement of 2 bac cooling towersDetails
like for like replacement of 2 bac cooling towers | $275,000 |
| May 30, 2019 | Completed final sign-off Nov 2019 | 515 Mason St | Bms Cat | repairs to dishwasher room due to water damage. removing sheetrock and replacing with frp damaged area in dishwash room, 30x30 sq ftDetails
repairs to dishwasher room due to water damage. removing sheetrock and replacing with frp damaged area in dishwash room, 30x30 sq ft | $20,000 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 515 Mason St | street spaceDetails
street space | ||
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 515 Mason St | street spaceDetails
street space | ||
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | remove and plug 18 (e) fire sprinklers and relocate 2 (e) sprinkler heads ref pa 201709229379; n/a maherDetails
remove and plug 18 (e) fire sprinklers and relocate 2 (e) sprinkler heads ref pa 201709229379; n/a maher | $800 |
| Nov 21, 2017 | Completed final sign-off Dec 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | remove and plug 21 (e) fire sprinklers ref pa 201709148096; n/a maherDetails
remove and plug 21 (e) fire sprinklers ref pa 201709148096; n/a maher | $800 |
| Oct 26, 2017 | Completed final sign-off Feb 2022 | 515 Mason St | Red Hawk Fire & Security Ca Llc | fire alarm tenat improvement-5th thru 20th floor. unit upgrades- add 1 new est-3 node to expand sytem capacity, add 345 smoke detector w/sounder bases, 32 monitor modules for sounder base w/interpose relay,16 biister supplies, 32 synchronization modules, 40 strokes, and 1 speaker.Details
fire alarm tenat improvement-5th thru 20th floor. unit upgrades- add 1 new est-3 node to expand sytem capacity, add 345 smoke detector w/sounder bases, 32 monitor modules for sounder base w/interpose relay,16 biister supplies, 32 synchronization modules, 40 strokes, and 1 speaker. | $300,000 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | Continental Contractors Inc | 20th fl - interior ti to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes & replacing tubs with showersDetails
20th fl - interior ti to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes & replacing tubs with showers | $205,000 |
| Sep 22, 2017 | Completed final sign-off Nov 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | f/s 6th fl: remove & plug 21 (e) sprinkler heads in closet. ref #201708316606. n/a maherDetails
f/s 6th fl: remove & plug 21 (e) sprinkler heads in closet. ref #201708316606. n/a maher | $800 |
| Sep 22, 2017 | Completed final sign-off Oct 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | f/s 14th fl. room #1420: relocate 4 (e) pendent fire sprinklers.Details
f/s 14th fl. room #1420: relocate 4 (e) pendent fire sprinklers. | $400 |
| Sep 22, 2017 | Completed final sign-off Nov 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | f/s 7th fl: remove & plug 21 (e) sprinkler heads in closet. ref #201708316602. n/a maherDetails
f/s 7th fl: remove & plug 21 (e) sprinkler heads in closet. ref #201708316602. n/a maher | $800 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | f/s 10th fl: remove & plug 21 (e) sprinkler heads in closet rooms. ref #201708104429. n/a maherDetails
f/s 10th fl: remove & plug 21 (e) sprinkler heads in closet rooms. ref #201708104429. n/a maher | $800 |
| Sep 22, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | f/s 9th fl: remove& plug 21 (e) sprinkler heads in closet. ref #201708245728. n/a maherDetails
f/s 9th fl: remove& plug 21 (e) sprinkler heads in closet. ref #201708245728. n/a maher | $800 |
| Sep 22, 2017 | Completed final sign-off Nov 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | f/s 8th fl: remove & plug 21 (e) sprinkler heads in closet. ref #201708245730. n/a ordinance #155-13Details
f/s 8th fl: remove & plug 21 (e) sprinkler heads in closet. ref #201708245730. n/a ordinance #155-13 | $800 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | Continental Contractors Inc | 5th fl: interior ti to include finishes, like for like fixtures, in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
5th fl: interior ti to include finishes, like for like fixtures, in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 31, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | Continental Contractors Inc | 6th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers.Details
6th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers. | $205,000 |
| Aug 31, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | Continental Contractors Inc | 7th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers.Details
7th floor: interior t.i. to include finishes, like for like fixtures in restrooms, limitted hardwall construction or layout changes and replacing tubs with showers. | $205,000 |
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 13th floor - remove & plug 21 sprinkler heads (e) closet rooms. ref #201705045701.Details
13th floor - remove & plug 21 sprinkler heads (e) closet rooms. ref #201705045701. | $800 |
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 12th floor - remove & plug 21 sprinkler heads (e) closet rooms. ref #201708104436.Details
12th floor - remove & plug 21 sprinkler heads (e) closet rooms. ref #201708104436. | $800 |
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 11th floor - remove & plug 21 sprinkler heads (e) closet rooms. ref #201708104435.Details
11th floor - remove & plug 21 sprinkler heads (e) closet rooms. ref #201708104435. | $800 |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | Continental Contractors Inc | 9th fl - interior ti to include finishes, like for like fixtures in rest rooms. limited hardwall construction or layout changes & replacing tubs with showers.Details
9th fl - interior ti to include finishes, like for like fixtures in rest rooms. limited hardwall construction or layout changes & replacing tubs with showers. | $205,000 |
| Aug 24, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | Continental Contractors Inc | 8th fl - interior ti to include finishes, like for like fixtures in restrooms. limited hardwall construction or layout changes, replacing tubs with showers.Details
8th fl - interior ti to include finishes, like for like fixtures in restrooms. limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 24, 2017 | Never finaled issued Sep 2017, no final | 515 Mason St | Continental Contractors Inc | 14th fl - ref pa 2017-0504-5702 (1401 converted to 2 guestrooms)Details
14th fl - ref pa 2017-0504-5702 (1401 converted to 2 guestrooms) | |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | Continental Contractors Inc | 12/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
12/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | Continental Contractors Inc | 11/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
11/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | Continental Contractors Inc | 10/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers.Details
10/f- interior t.i. to include finishes, like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers. | $205,000 |
| Aug 3, 2017 | Completed final sign-off Aug 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 14th floor - remove & plug 21 (e) pendent sprinkler heads in closet rooms. ref #201705045702.Details
14th floor - remove & plug 21 (e) pendent sprinkler heads in closet rooms. ref #201705045702. | $800 |
| Aug 3, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 15th floor - remove & plug 21 (e) pendent sprinkler heads in closet rooms. ref #201705045703.Details
15th floor - remove & plug 21 (e) pendent sprinkler heads in closet rooms. ref #201705045703. | $800 |
| Jun 30, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | Continental Contractors Inc | 16th floor: revise light fixtures. ref app#201704194347Details
16th floor: revise light fixtures. ref app#201704194347 | |
| Jun 30, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | Continental Contractors Inc | 17th floor: revise light fixtures. ref app#201704194347Details
17th floor: revise light fixtures. ref app#201704194347 | |
| Jun 27, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | Continental Contractors Inc | 19/f: revise light fixtures. ref 201703312946Details
19/f: revise light fixtures. ref 201703312946 | |
| Jun 27, 2017 | Never finaled issued Jun 2017, no final | 515 Mason St | Continental Contractors Inc | 18th floor: revise light fixtures. ref 201704184253Details
18th floor: revise light fixtures. ref 201704184253 | |
| May 11, 2017 | Completed final sign-off May 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 19th floor: remove and plug 20 extg pendent fire sprinklers.Details
19th floor: remove and plug 20 extg pendent fire sprinklers. | $1,000 |
| May 11, 2017 | Completed final sign-off Jul 2017 | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 18th floor: remove and plug 20 extg pendent fire sprinklers.Details
18th floor: remove and plug 20 extg pendent fire sprinklers. | $1,000 |
| May 11, 2017 | Never finaled issued May 2017, no final | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 17th floor: remove and plug 20 extg pendent fire sprinklers. ref app#201704194351Details
17th floor: remove and plug 20 extg pendent fire sprinklers. ref app#201704194351 | $1,000 |
| May 11, 2017 | Never finaled issued May 2017, no final | 515 Mason St | Sew Inc. Dba Frontier Fire Protection | 16th floor: remove and plug 20 extg pendent fire sprinklers. ref app#201704194347Details
16th floor: remove and plug 20 extg pendent fire sprinklers. ref app#201704194347 | $1,000 |
| May 4, 2017 | Never finaled issued Aug 2017, no final | 515 Mason St | Continental Contractors Inc | 13th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
13th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| May 4, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | Continental Contractors Inc | 14th flr a/mep: interior improvement to include finishes, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers. convert room 1401 into two guest rooms. fire (sprinkler and alarm) under separate permits.Details
14th flr a/mep: interior improvement to include finishes, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers. convert room 1401 into two guest rooms. fire (sprinkler and alarm) under separate permits. | $205,000 |
| May 4, 2017 | Never finaled issued Jul 2017, no final | 515 Mason St | Continental Contractors Inc | 15th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
15th flr: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| Apr 21, 2017 | Never finaled issued Apr 2017, no final | 515 Mason St | street spaceDetails
street space | ||
| Apr 19, 2017 | Never finaled issued May 2017, no final | 515 Mason St | Continental Contractors Inc | 17th fl: interior improvment to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers & finishesDetails
17th fl: interior improvment to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers & finishes | $205,000 |
| Apr 19, 2017 | Never finaled issued May 2017, no final | 515 Mason St | Continental Contractors Inc | 16th fl: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
16th fl: interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| Apr 18, 2017 | Never finaled issued May 2017, no final | 515 Mason St | Continental Contractors Inc | interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showersDetails
interior improvment to include finishes, like for like, fixtures in restrooms, limited hardwall construction or layout changes, replace tubs with showers | $205,000 |
| Mar 31, 2017 | Never finaled issued Apr 2017, no final | 515 Mason St | Continental Contractors Inc | interior improvements to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers, and finishes.Details
interior improvements to include like for like fixtures in restrooms, limited hardwall construction or layout changes, replacing tubs with showers, and finishes. | $205,000 |
| May 16, 2016 | Completed final sign-off Nov 2016 | 500 Post St | Metropolitan Electrical Construction | verizon wireless - modify i-das site for verizon wireless, adding batteries and replacing existing rrusDetails
verizon wireless - modify i-das site for verizon wireless, adding batteries and replacing existing rrus | $30,000 |
| Dec 18, 2014 | Expired or cancelled cancelled Jan 2026 | 500 Post St | install for co-location of verizon wireless equipment onto an (e) indoor distributed ant. syst. consisting dc power equipment to occupy 1 (e) equip. rack, idas radio equip. to occupy 2 (e) equip. racks, remote radio units at (e) telco backboards in(e) idf closet, 1 gps antenna, 1 donor ant. & 1 pipeDetails
install for co-location of verizon wireless equipment onto an (e) indoor distributed ant. syst. consisting dc power equipment to occupy 1 (e) equip. rack, idas radio equip. to occupy 2 (e) equip. racks, remote radio units at (e) telco backboards in(e) idf closet, 1 gps antenna, 1 donor ant. & 1 pipe | $30,000 | |
| Sep 16, 2013 | Never finaled issued Sep 2013, no final | 515 Mason St | add address to jw marriott hotel at block 0297, lot 028 as; 515 mason street.Details
add address to jw marriott hotel at block 0297, lot 028 as; 515 mason street. | ||
| Feb 24, 2012 | Completed final sign-off Oct 2012 | 500 Post St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | installation of an indoor distributed antenna system (das) at jw mariott. the das includes a head end room to be built on level #e in the underground parking garage & includes 7 indoor cabinets (1 battery cabinet included in this count 42.56 electroytes total)Details
installation of an indoor distributed antenna system (das) at jw mariott. the das includes a head end room to be built on level #e in the underground parking garage & includes 7 indoor cabinets (1 battery cabinet included in this count 42.56 electroytes total) | $100,000 |
| Jan 11, 2012 | Never finaled issued Jan 2012, no final | 500 Post St | Red Hawk Fire & Security Ca Llc | addition of elevator interface devices for elevator upgrade project.Details
addition of elevator interface devices for elevator upgrade project. | $3,600 |
| Dec 15, 2011 | Completed final sign-off Jan 2012 | 500 Post St | Howard S. Wright Constructors Lp | basement level-refer to arch pa# 2011-0804-1755-structural support for installation of new sliding doors systemDetails
basement level-refer to arch pa# 2011-0804-1755-structural support for installation of new sliding doors system | $7,500 |
| Oct 27, 2011 | Never finaled issued Oct 2011, no final | 500 Post St | Westates Mechanical Corporation Inc | relocate 14, add 1 pendent. replace 71 extg standard response to quick response pendent sprinkler. work at basement level only.Details
relocate 14, add 1 pendent. replace 71 extg standard response to quick response pendent sprinkler. work at basement level only. | $16,800 |
| Sep 1, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa# 200908255502. all work is complete.Details
to obtain final inspection for work approved under pa# 200908255502. all work is complete. | ||
| Sep 1, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa# 200807307985. all work is complete.Details
to obtain final inspection for work approved under pa# 200807307985. all work is complete. | ||
| Sep 1, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa# 200908255504. all work is complete.Details
to obtain final inspection for work approved under pa# 200908255504. all work is complete. | ||
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 500 Post St | 2nd, 3rd & 4th floor: to obtain final inspection for work approved under pa # 200806053751. all work is completeDetails
2nd, 3rd & 4th floor: to obtain final inspection for work approved under pa # 200806053751. all work is complete | ||
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 500 Post St | 3rd floor: to obtain final inspection for work approved under pa # 200807146645. all work is completeDetails
3rd floor: to obtain final inspection for work approved under pa # 200807146645. all work is complete | ||
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 500 Post St | 21st floor: to obtain final inspection for work approved under pa # 200907213106. all work is completeDetails
21st floor: to obtain final inspection for work approved under pa # 200907213106. all work is complete | ||
| Aug 30, 2011 | Completed final sign-off Sep 2011 | 500 Post St | renew for final 200712261305. all work completeDetails
renew for final 200712261305. all work complete | ||
| Aug 30, 2011 | Completed final sign-off Nov 2011 | 500 Post St | to obtain final inspection for work approved under pa 200812188794; all work is completeDetails
to obtain final inspection for work approved under pa 200812188794; all work is complete | ||
| Aug 30, 2011 | Completed final sign-off Nov 2011 | 500 Post St | renew for final 200911252113Details
renew for final 200911252113 | ||
| Aug 30, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa 200706224905; all work is completeDetails
to obtain final inspection for work approved under pa 200706224905; all work is complete | ||
| Aug 30, 2011 | Completed final sign-off Nov 2011 | 500 Post St | to obtain final inspection for work approved under pa200709132538; all work is completeDetails
to obtain final inspection for work approved under pa200709132538; all work is complete | ||
| Aug 30, 2011 | Completed final sign-off Nov 2011 | 500 Post St | renew for final 2009-11-23-1870Details
renew for final 2009-11-23-1870 | ||
| Aug 25, 2011 | Completed final sign-off Nov 2011 | 500 Post St | to obtain final inspection for work approved under pa# 200710044593. all work is complete.Details
to obtain final inspection for work approved under pa# 200710044593. all work is complete. | ||
| Aug 25, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa# 200706204539. all work is complete.Details
to obtain final inspection for work approved under pa# 200706204539. all work is complete. | ||
| Aug 24, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved uner pa#200706194312 all work is completeDetails
to obtain final inspection for work approved uner pa#200706194312 all work is complete | ||
| Aug 24, 2011 | Completed final sign-off Nov 2011 | 500 Post St | units #1401 & 1409: to obtain final inspection for work approved under pa 200710094863; all work completeDetails
units #1401 & 1409: to obtain final inspection for work approved under pa 200710094863; all work complete | ||
| Aug 24, 2011 | Never finaled issued Aug 2011, no final | 500 Post St | to obtain final inspection for work approved uner pa#200708089156 all work is completeDetails
to obtain final inspection for work approved uner pa#200708089156 all work is complete | ||
| Aug 24, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa 200707116509; all work is completeDetails
to obtain final inspection for work approved under pa 200707116509; all work is complete | ||
| Aug 24, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved uner pa#200710155400 all work is completeDetails
to obtain final inspection for work approved uner pa#200710155400 all work is complete | ||
| Aug 23, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa#200708028596 all work is complete.Details
to obtain final inspection for work approved under pa#200708028596 all work is complete. | ||
| Aug 23, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa#200706265199 all work is complete.Details
to obtain final inspection for work approved under pa#200706265199 all work is complete. | ||
| Aug 23, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa#200706224888 all work is complete.Details
to obtain final inspection for work approved under pa#200706224888 all work is complete. | ||
| Aug 23, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa#200711158256 all work is complete.Details
to obtain final inspection for work approved under pa#200711158256 all work is complete. | ||
| Aug 22, 2011 | Completed final sign-off Mar 2012 | 500 Post St | 19th floor to obtain final inspection for work approved under pa # 200706133827. all work is complete.Details
19th floor to obtain final inspection for work approved under pa # 200706133827. all work is complete. | ||
| Aug 22, 2011 | Completed final sign-off Mar 2012 | 500 Post St | 21st floor: to obtain final inspection for work approved under pa # 200706204547. all workis complete.Details
21st floor: to obtain final inspection for work approved under pa # 200706204547. all workis complete. | ||
| Aug 22, 2011 | Completed final sign-off Mar 2012 | 500 Post St | 5th floor: to obtain final inspection for work approved under pa # 200711158262. all work is complete.Details
5th floor: to obtain final inspection for work approved under pa # 200711158262. all work is complete. | ||
| Aug 22, 2011 | Completed final sign-off Mar 2012 | 500 Post St | 20th floor: to obtain final inspection for work approved under pa # 200706133761 all work is complete.Details
20th floor: to obtain final inspection for work approved under pa # 200706133761 all work is complete. | ||
| Aug 22, 2011 | Expired or cancelled expired Jun 2013 | 500 Post St | Howard S. Wright Constructors Lp | expand and remodel existing fitness center on the 5th floorDetails
expand and remodel existing fitness center on the 5th floor | $50,000 |
| Aug 18, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa#200711158260 all work is complete.Details
to obtain final inspection for work approved under pa#200711158260 all work is complete. | ||
| Aug 18, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa#200710024295 all work is complete.Details
to obtain final inspection for work approved under pa#200710024295 all work is complete. | ||
| Aug 18, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa#200709102208. all work is complete.Details
to obtain final inspection for work approved under pa#200709102208. all work is complete. | ||
| Aug 18, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa #200710155399. all work is complete.Details
to obtain final inspection for work approved under pa #200710155399. all work is complete. | ||
| Aug 17, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa#200709102203 all work is complete.Details
to obtain final inspection for work approved under pa#200709102203 all work is complete. | ||
| Aug 17, 2011 | Completed final sign-off Mar 2012 | 500 Post St | to obtain final inspection for work approved under pa#200706265206 all work is complete.Details
to obtain final inspection for work approved under pa#200706265206 all work is complete. | ||
| Aug 17, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa#200708028595 all work is complete.Details
to obtain final inspection for work approved under pa#200708028595 all work is complete. | ||
| Aug 17, 2011 | Completed final sign-off Sep 2011 | 500 Post St | to obtain final inspection for work approved under pa#200707025750 all work is complete.Details
to obtain final inspection for work approved under pa#200707025750 all work is complete. | ||
| Aug 4, 2011 | Completed final sign-off Jan 2012 | 500 Post St | Howard S. Wright Constructors Lp | basement level-existing meeting space on lower level remodel. addition of accessible unisex bathroom. no new lightingDetails
basement level-existing meeting space on lower level remodel. addition of accessible unisex bathroom. no new lighting | $128,000 |
| Nov 25, 2009 | Expired or cancelled expired Nov 2011 | 500 Post St | tenant improvment of a conference room. minor wall demo and ceiling demo. new wall framing, electrical, mechanical, fire sprinkler, relocation. new ceiling tile and gridDetails
tenant improvment of a conference room. minor wall demo and ceiling demo. new wall framing, electrical, mechanical, fire sprinkler, relocation. new ceiling tile and grid | $8,500 | |
| Nov 23, 2009 | Expired or cancelled expired Nov 2011 | 500 Post St | Westates Mechanical Corporation Inc | basement - install 4 fire sprinkler heads.Details
basement - install 4 fire sprinkler heads. | $800 |
| Aug 25, 2009 | Expired or cancelled expired Sep 2011 | 500 Post St | Bay Area Signs | install a wall illuminated sign.Details
install a wall illuminated sign. | $1,500 |
| Aug 25, 2009 | Expired or cancelled expired Sep 2011 | 500 Post St | Bay Area Signs | install new wall hanging sign, illuminated, double facedDetails
install new wall hanging sign, illuminated, double faced | $750 |
| Jul 21, 2009 | Completed final sign-off Dec 2009 | 500 Post St | Eide Industries Inc | framed in fabric shade system installed at 21st floor open patio. horizontal operation with pleated fabric attached to pulleys . pulleys to travel along horizontal steel cables. cables to anchor to perimeter frame.Details
framed in fabric shade system installed at 21st floor open patio. horizontal operation with pleated fabric attached to pulleys . pulleys to travel along horizontal steel cables. cables to anchor to perimeter frame. | $20,000 |
| Jul 1, 2009 | Never finaled issued Jul 2009, no final | 500 Post St | street space & mtaDetails
street space & mta | ||
| Dec 18, 2008 | Expired or cancelled expired Nov 2011 | 500 Post St | Simplex Grinnell | add 4 each fire sprinkler and relocate 4 each fire sprinklers on 3rd floor due to extg curtain divider in bar areaDetails
add 4 each fire sprinkler and relocate 4 each fire sprinklers on 3rd floor due to extg curtain divider in bar area | $2,100 |
| Jul 30, 2008 | Expired or cancelled expired Sep 2011 | 500 Post St | Sign & Sign Again | to erect a single-faced electric wall sign.Details
to erect a single-faced electric wall sign. | $8,000 |
| Jul 14, 2008 | Expired or cancelled expired Nov 2011 | 500 Post St | Diversified Fire Products | fire alarm ti on the 3rd floor retail. one control relay, 2 mounting p[lates and 2 smoke detectors.Details
fire alarm ti on the 3rd floor retail. one control relay, 2 mounting p[lates and 2 smoke detectors. | $6,964 |
| Jun 5, 2008 | Expired or cancelled expired Nov 2011 | 500 Post St | International Fire Equip | install 3 ansul piranha systems into existing kitchen hood. one basement kitchen at 2nd fl. one main kitchen at 3rd fl and one employee kitchen at 4th floor.Details
install 3 ansul piranha systems into existing kitchen hood. one basement kitchen at 2nd fl. one main kitchen at 3rd fl and one employee kitchen at 4th floor. | $18,000 |
| Dec 26, 2007 | Expired or cancelled expired May 2010 | 500 Post St | interior nonstructural demo on 1st. & 2nd. floors prior to t.i.Details
interior nonstructural demo on 1st. & 2nd. floors prior to t.i. | $8,800 | |
| Nov 15, 2007 | Expired or cancelled expired May 2010 | 500 Post St | 5th floor-replace bthrm,vanities, sinks in all guestrms on 5th flr. work includes (n) carpet, fixtures, furniture & painting in all guestrms. on the 5th. flr. also (n) carpet wallpaper & paint in 5th. flr. hallways. minor lighting changes. no structural work, fire protection under separate permitDetails
5th floor-replace bthrm,vanities, sinks in all guestrms on 5th flr. work includes (n) carpet, fixtures, furniture & painting in all guestrms. on the 5th. flr. also (n) carpet wallpaper & paint in 5th. flr. hallways. minor lighting changes. no structural work, fire protection under separate permit | $175,000 | |
| Nov 15, 2007 | Expired or cancelled expired May 2010 | 500 Post St | 6th floor-replace bathrm vanities,sinks in all guestrms on 6th flr. work includes (n) carpet, fixtures, (n) furniture & painting in all guestrms. on 6th. flr. also (n) carpet, wallpaper & paint in 6th. flr. hallways. minor lighting changes. no structural work, fire protection under separate permit.Details
6th floor-replace bathrm vanities,sinks in all guestrms on 6th flr. work includes (n) carpet, fixtures, (n) furniture & painting in all guestrms. on 6th. flr. also (n) carpet, wallpaper & paint in 6th. flr. hallways. minor lighting changes. no structural work, fire protection under separate permit. | $175,000 | |
| Nov 15, 2007 | Completed final sign-off Mar 2012 | 500 Post St | 7th floor-replace bathrm vanities, sinks in all guestrms on 7th flr. work includes (n) carpet, fixtures (n) furniture & painting in all guest rms. on 7th. flr. also (n) carpet, wallpaper & paint in 7th. floor hallways. minor lighting changes. no structural work. fire protection under separate permitDetails
7th floor-replace bathrm vanities, sinks in all guestrms on 7th flr. work includes (n) carpet, fixtures (n) furniture & painting in all guest rms. on 7th. flr. also (n) carpet, wallpaper & paint in 7th. floor hallways. minor lighting changes. no structural work. fire protection under separate permit | $175,000 | |
| Oct 15, 2007 | Completed final sign-off Mar 2012 | 500 Post St | work on 9th/fl. replace bathroom vanities & sink in all guest rooms . work includes (n) carpet (n) fixtures (n) furniture & painting in all guestrooms. also (n) carpet, lighting wallpaper & paint, hallways. no structural work. lighting & fire protection under separate permit.Details
work on 9th/fl. replace bathroom vanities & sink in all guest rooms . work includes (n) carpet (n) fixtures (n) furniture & painting in all guestrooms. also (n) carpet, lighting wallpaper & paint, hallways. no structural work. lighting & fire protection under separate permit. | $175,000 | |
| Oct 15, 2007 | Expired or cancelled expired May 2010 | 500 Post St | work on 8th/fl. replace bathroom vanities & sinks in all guest rooms. work includes (n) carpet, (n) fixtures, (n) furniture & painting in all guestrooms on 8th floor. also (n) carpet, wallpaper & paint in hallways, and (n) lighting. no structural work. fire protection under separate permits.Details
work on 8th/fl. replace bathroom vanities & sinks in all guest rooms. work includes (n) carpet, (n) fixtures, (n) furniture & painting in all guestrooms on 8th floor. also (n) carpet, wallpaper & paint in hallways, and (n) lighting. no structural work. fire protection under separate permits. | $175,000 | |
| Oct 9, 2007 | Expired or cancelled expired Nov 2011 | 500 Post St | 14th floor - revision to approved appl.# 2007.08.02.8596. work is to revise bathroom/closet configurations in (2) ada suites (#1401 & #1409). no changes to lighting or mechanical. no other work.Details
14th floor - revision to approved appl.# 2007.08.02.8596. work is to revise bathroom/closet configurations in (2) ada suites (#1401 & #1409). no changes to lighting or mechanical. no other work. | $20,000 | |
| Oct 4, 2007 | Expired or cancelled expired Nov 2011 | 500 Post St | 21st floor - revision to pa# 2007/06/20/4547. work is to correct doors for 2nd exit from the conciere louge, increase wall partition in lounge to 16" to conceal plumbing and wires. no other construction work.Details
21st floor - revision to pa# 2007/06/20/4547. work is to correct doors for 2nd exit from the conciere louge, increase wall partition in lounge to 16" to conceal plumbing and wires. no other construction work. | $5,000 | |
| Oct 2, 2007 | Expired or cancelled expired May 2010 | 500 Post St | 10th floor t/i/ replace bathroom vanities, new carpet,fixtures, paintlighting, hallway lighting.fire alarm ,sprinklers under sep.applicationDetails
10th floor t/i/ replace bathroom vanities, new carpet,fixtures, paintlighting, hallway lighting.fire alarm ,sprinklers under sep.application | $175,000 | |
| Sep 13, 2007 | Expired or cancelled expired Sep 2009 | 500 Post St | Simplex Grinnell | sprinkler modification on 2nd and 21st floors. 2nd floor relocate 21 existing pendant sprinklers. 21st floor relocate 1 existing pendant sprinkler.Details
sprinkler modification on 2nd and 21st floors. 2nd floor relocate 21 existing pendant sprinklers. 21st floor relocate 1 existing pendant sprinkler. | $8,586 |
| Sep 10, 2007 | Expired or cancelled expired May 2010 | 500 Post St | 11th floor - replace bathroom vanities & sinks in all guest rooms. work includes (n) carper, (n) fixtures, (n) furnitures & painting in all guestrooms on 11th floor. also, (n) carper, wallpaper, lights & painting in 11th floor hallways. no structural work. fire protection under separate permit.Details
11th floor - replace bathroom vanities & sinks in all guest rooms. work includes (n) carper, (n) fixtures, (n) furnitures & painting in all guestrooms on 11th floor. also, (n) carper, wallpaper, lights & painting in 11th floor hallways. no structural work. fire protection under separate permit. | $175,000 | |
| Sep 10, 2007 | Expired or cancelled expired Sep 2011 | 500 Post St | 12th floor-replace bathroom vanities and sinks in allguest rooms on the 12th fl. work includes (n)carpet,(n) fixtures, (n)furnitures and painting in all guestrooms. (n) carpet, wallpaper,lighting and paint in hallways, no structural work, fire protection under separate permit. no exterior work.Details
12th floor-replace bathroom vanities and sinks in allguest rooms on the 12th fl. work includes (n)carpet,(n) fixtures, (n)furnitures and painting in all guestrooms. (n) carpet, wallpaper,lighting and paint in hallways, no structural work, fire protection under separate permit. no exterior work. | $175,000 | |
| Aug 8, 2007 | Never finaled issued Mar 2008, no final | 500 Post St | t.i. for 1st & 3rd floor public areas of hotel work includes (n) bar cafe (n) partitions fixtures finishes furniture (n) lighting plumbing & mechanical no exterior work fire protection under separate permitDetails
t.i. for 1st & 3rd floor public areas of hotel work includes (n) bar cafe (n) partitions fixtures finishes furniture (n) lighting plumbing & mechanical no exterior work fire protection under separate permit | $1,800,000 | |
| Aug 2, 2007 | Expired or cancelled expired Sep 2011 | 500 Post St | replace bathroom vanities, sinks in all guest room on 14th flr. work includes: new carpet, fixtures, furniture, painting in all guestrooms on 14th flr. also new carpet wallpaper, paint in 14th flr hallways, lighting, mech upgrades included. no structural work. fire protection under seperate permitDetails
replace bathroom vanities, sinks in all guest room on 14th flr. work includes: new carpet, fixtures, furniture, painting in all guestrooms on 14th flr. also new carpet wallpaper, paint in 14th flr hallways, lighting, mech upgrades included. no structural work. fire protection under seperate permit | $115,000 | |
| Aug 2, 2007 | Expired or cancelled expired Sep 2011 | 500 Post St | 13th floor-replace bathroom vanities, sinks in all guestrms on 13th flr, work includes: new carpet, fixtures, furniture, painting in all guestrms on 13th flr. also new carpet, wallpaper, paint in 13th flr hallways. lighting, mech upgrdes included. no structural work, fire proetection under seperateDetails
13th floor-replace bathroom vanities, sinks in all guestrms on 13th flr, work includes: new carpet, fixtures, furniture, painting in all guestrms on 13th flr. also new carpet, wallpaper, paint in 13th flr hallways. lighting, mech upgrdes included. no structural work, fire proetection under seperate | $175,000 | |
| Jul 11, 2007 | Expired or cancelled expired Jul 2009 | 500 Post St | Diversified Fire Products | fire alarm changes to ada rooms - added 1422 (14th floor), moved room from 12th to 10th floor (orig. drawing error). added devices: 1 monitor module, 2 strobes, 1 res. sd, rev. to pa#2007/06/19/4312Details
fire alarm changes to ada rooms - added 1422 (14th floor), moved room from 12th to 10th floor (orig. drawing error). added devices: 1 monitor module, 2 strobes, 1 res. sd, rev. to pa#2007/06/19/4312 | $100 |
| Jul 2, 2007 | Expired or cancelled expired May 2010 | 500 Post St | replace vanities and lavs in guest rooms on the 15th floor of a tourist hotel.Details
replace vanities and lavs in guest rooms on the 15th floor of a tourist hotel. | $187,000 | |
| Jun 26, 2007 | Expired or cancelled expired May 2010 | 500 Post St | replace bathroom vanities in all 16th floor questrooms. work also includes (n) carpet, paint, wallpaper & furnishings in 16th floor guestrooms and hallway. add (n) lighting in 16th floor hallway. fire protection under seperate permit.Details
replace bathroom vanities in all 16th floor questrooms. work also includes (n) carpet, paint, wallpaper & furnishings in 16th floor guestrooms and hallway. add (n) lighting in 16th floor hallway. fire protection under seperate permit. | $187,000 | |
| Jun 26, 2007 | Expired or cancelled expired Apr 2010 | 500 Post St | replace bathroom vanities in all 17th floor guestrooms. work also includes (n) carpet and paint, & wallpaper on 17th floor as well as (n) lighting in 17th floor hallway. fire protection under seperate permitDetails
replace bathroom vanities in all 17th floor guestrooms. work also includes (n) carpet and paint, & wallpaper on 17th floor as well as (n) lighting in 17th floor hallway. fire protection under seperate permit | $187,000 | |
| Jun 22, 2007 | Expired or cancelled expired Jul 2009 | 500 Post St | renovate (e) ballroom and meeting rooms(e) on 2nd and 21st fls, work includes soft demo, (n) partition,(n) finishes, carpet & paint. (n) lighting. fire protection and upgrades to the mechanical system, if necessary are under seperate permit.Details
renovate (e) ballroom and meeting rooms(e) on 2nd and 21st fls, work includes soft demo, (n) partition,(n) finishes, carpet & paint. (n) lighting. fire protection and upgrades to the mechanical system, if necessary are under seperate permit. | $125,000 | |
| Jun 22, 2007 | Expired or cancelled expired Apr 2010 | 500 Post St | replace bathroom vanities in all guestrooms on the 18th floor. work also includes new carpet, paintwall paper & furniture in all 18th floor guestrooms. also new carpet, wall paper in 18th floor hallways. fire protection under seperate permitDetails
replace bathroom vanities in all guestrooms on the 18th floor. work also includes new carpet, paintwall paper & furniture in all 18th floor guestrooms. also new carpet, wall paper in 18th floor hallways. fire protection under seperate permit | $187,000 | |
| Jun 20, 2007 | Expired or cancelled expired Sep 2011 | 500 Post St | install (n) lighting in haallway on 19th floor. guestroom renovation on 19th floor approved under pa#2007/06/13/3761Details
install (n) lighting in haallway on 19th floor. guestroom renovation on 19th floor approved under pa#2007/06/13/3761 | $15,000 | |
| Jun 20, 2007 | Expired or cancelled expired Apr 2010 | 500 Post St | renovate (e) guestroom lounge on 21st floor. construct (n) prtitions, install casework and (n) finishes & (n) furnishings. fire protection under separate permit. no mechanical system upgrades under this permit.Details
renovate (e) guestroom lounge on 21st floor. construct (n) prtitions, install casework and (n) finishes & (n) furnishings. fire protection under separate permit. no mechanical system upgrades under this permit. | $75,000 | |
| Jun 19, 2007 | Expired or cancelled expired Jul 2009 | 500 Post St | Diversified Fire Products | fire alarm notification upgraade of ada rooms on floors 5,9,12,13,14, & 20: 9 signal modules, 11 input modules, 2 power boosters, 18 ceiling strobes, 9 smoke detectorsDetails
fire alarm notification upgraade of ada rooms on floors 5,9,12,13,14, & 20: 9 signal modules, 11 input modules, 2 power boosters, 18 ceiling strobes, 9 smoke detectors | $26,681 |
| Jun 13, 2007 | Expired or cancelled expired Apr 2010 | 500 Post St | work is in 20/f guestrooms & hallway, replace bathroom vanities and sinks in all guestrooms. install (n) carpet, (n) furniture, (n) fixtures and paint all guestrooms. install (n) carpet & wall paper in corridor, repaint hallway, install (n) lighting in hallway & guestrooms under seperate permitDetails
work is in 20/f guestrooms & hallway, replace bathroom vanities and sinks in all guestrooms. install (n) carpet, (n) furniture, (n) fixtures and paint all guestrooms. install (n) carpet & wall paper in corridor, repaint hallway, install (n) lighting in hallway & guestrooms under seperate permit | $187,000 | |
| Jun 13, 2007 | Expired or cancelled expired Apr 2010 | 500 Post St | replace bathroom vantities & sinks in all guestrooms on 19/f.work includes (n) carpet,(n)fixtures,(n)furniture & painting in all guestrooms on 19/f.also (n)carpet,wallpaper & paint in 19/f hallways. lighting & fire protection under seperate permit. no structural work.Details
replace bathroom vantities & sinks in all guestrooms on 19/f.work includes (n) carpet,(n)fixtures,(n)furniture & painting in all guestrooms on 19/f.also (n)carpet,wallpaper & paint in 19/f hallways. lighting & fire protection under seperate permit. no structural work. | $140,000 | |
| Sep 8, 2005 | Completed final sign-off Sep 2005 | 500 Post St | Fine Line Group Inc | renew app #200406116246/200405274972/200412080977Details
renew app #200406116246/200405274972/200412080977 | |
| Dec 8, 2004 | Expired or cancelled expired Sep 2005 | 500 Post St | this permit is to rectify the dwelling unit count from 352 unit sto 350 unitsDetails
this permit is to rectify the dwelling unit count from 352 unit sto 350 units | ||
| Jun 11, 2004 | Expired or cancelled expired Sep 2005 | 500 Post St | E. J. Weber Elect.Co Inc | 3/f, 5/f, 21/f - modify (e)fire alarm circuitry & add additional fire notification devicesDetails
3/f, 5/f, 21/f - modify (e)fire alarm circuitry & add additional fire notification devices | $9,740 |
| Jun 8, 2004 | Completed final sign-off Sep 2004 | 500 Post St | R L H Fire Protection Inc | fire sprinkler tenant improvements to 3rd & 5th fllorsDetails
fire sprinkler tenant improvements to 3rd & 5th fllors | $2,400 |
| May 27, 2004 | Expired or cancelled expired Sep 2005 | 500 Post St | revision 200404070654 including 1. relocation of fitness center from 5th flr northeast corner to theDetails
revision 200404070654 including 1. relocation of fitness center from 5th flr northeast corner to the | $5,000 | |
| Apr 29, 2004 | Completed final sign-off Sep 2004 | 500 Post St | R L H Fire Protection Inc | fire sprinkler t/1 of 21st floor conference rooms, 28 relocatesDetails
fire sprinkler t/1 of 21st floor conference rooms, 28 relocates | $8,500 |
| Apr 8, 2004 | Completed final sign-off Sep 2004 | 500 Post St | 3/f, 5/f, 21/f- provide mechanical & electricalDetails
3/f, 5/f, 21/f- provide mechanical & electrical | $50,000 | |
| Apr 7, 2004 | Completed final sign-off Sep 2005 | 500 Post St | reconfigure two existing suits to2 meeting rms renovate existing fitness center renovate existingDetails
reconfigure two existing suits to2 meeting rms renovate existing fitness center renovate existing | $380,000 | |
| Apr 5, 2004 | Completed final sign-off Sep 2004 | 500 Post St | provide structural support for partition @ 3/f, 5/f & 21/fDetails
provide structural support for partition @ 3/f, 5/f & 21/f | $15,000 | |
| Mar 15, 2002 | Expired or cancelled cancelled Dec 2009 | 500 Post St | Dynalectric Company | replace head end equipment and upgrade inition and signal devices of fire life safety system on allDetails
replace head end equipment and upgrade inition and signal devices of fire life safety system on all | $122,750 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.