Shawn Alexander
- Listed as
- architect, engineer
- Firm
- Axis Architecture & Design
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Dec 2021
38 permits since 2000 (architect on 37 permits, engineer on 1 permit): 18 completed, 15 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 22, 2021 | Completed final sign-off Aug 2024 | 55 Cyril Magnin St | Hathaway Dinwiddie Co. | barrier removal related to the accessible business entrance program, cat ii. inclusive of work at the accessible van parking (porte-cochere), regrading at cyril magnin sidewalk & (e) accessible platform lift.Details
barrier removal related to the accessible business entrance program, cat ii. inclusive of work at the accessible van parking (porte-cochere), regrading at cyril magnin sidewalk & (e) accessible platform lift. | $600,000 |
| Dec 21, 2021 | Completed final sign-off Oct 2023 | 515 Mason St | Hathaway Dinwiddie Co. | scope constists entirely of barrier removal related to the accessible business entrance program category 2.Details
scope constists entirely of barrier removal related to the accessible business entrance program category 2. | $250,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 140 Ellis St | Terra Nova Industries | revision to app#201901241189. removed all nw mechanical equipment from low roof. route nw exhaust & makeup air ducts to nw equipment at high roof. new 2 hour rated shaft from basement kitchen to 2nd flr light well. minor revision to below slab ductwork routing. no changes to mech equipment.n/a mahDetails
revision to app#201901241189. removed all nw mechanical equipment from low roof. route nw exhaust & makeup air ducts to nw equipment at high roof. new 2 hour rated shaft from basement kitchen to 2nd flr light well. minor revision to below slab ductwork routing. no changes to mech equipment.n/a mah | |
| Mar 1, 2019 | Completed final sign-off Jul 2019 | 530 Bush St | Commercial Interior Builders Inc | 6th fl; barrier removal at 6th fl. restroomsDetails
6th fl; barrier removal at 6th fl. restrooms | $20,000 |
| Jan 24, 2019 | Never finaled issued Jul 2019, no final | 140 Ellis St | Terra Nova Industries | (n) mechanical equipment at basement and ground floor onlyDetails
(n) mechanical equipment at basement and ground floor only | $200,000 |
| Jan 10, 2019 | Never finaled filed Jan 2019, never issued | 140 Ellis St | modify restaurant door and new roof top equipment. maher n/aDetails
modify restaurant door and new roof top equipment. maher n/a | $200,000 | |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 530 Bush St | Commercial Interior Builders Inc | 9th flr. t.i, light demo of select walls ( non-structural ) doors and finishes, electrical for lighting and power. installing (n) non-fire rated wall doors, lighting and finishesDetails
9th flr. t.i, light demo of select walls ( non-structural ) doors and finishes, electrical for lighting and power. installing (n) non-fire rated wall doors, lighting and finishes | $350,000 |
| Aug 27, 2018 | Completed final sign-off Nov 2018 | 530 Bush St | Commercial Interior Builders Inc | 5th & 6th fl - demo of non-structural walls & door assembblies & finishes. construction of non-structural tenant improvementsDetails
5th & 6th fl - demo of non-structural walls & door assembblies & finishes. construction of non-structural tenant improvements | $40,000 |
| Sep 26, 2017 | Never finaled filed Sep 2017, never issued | 270 Turk St | adu per ord 162-16 at basement level only. add 4 (n) residential units to basement level, including (4) kitchens and (4) bathrooms. no reduction of guestrooms (16 guestrooms).Details
adu per ord 162-16 at basement level only. add 4 (n) residential units to basement level, including (4) kitchens and (4) bathrooms. no reduction of guestrooms (16 guestrooms). | $270,000 | |
| Jul 21, 2016 | Completed final sign-off Jan 2017 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | adding double door w/panic device at atrium level (3rd floor), adding two operable walls at atrium level.Details
adding double door w/panic device at atrium level (3rd floor), adding two operable walls at atrium level. | $20,000 |
| Jul 20, 2015 | Never finaled issued Jul 2015, no final | 55 04th St | Source Planning And Construction Inc | renovation of exterior entry to new retail tenant. work includes removal of (e) non-accessible topping slab & construction of new steps & sloped walkway as well as new door actuator to allow for accessibility into retail space. n/a maher ordinanceDetails
renovation of exterior entry to new retail tenant. work includes removal of (e) non-accessible topping slab & construction of new steps & sloped walkway as well as new door actuator to allow for accessibility into retail space. n/a maher ordinance | $100,000 |
| Jul 16, 2015 | Never finaled issued Jul 2015, no final | 128 King St | Nibbi Bros Assoc Inc. | revision/amendment to pa #2014.0825.4577 (permit # 1336386) - to revise existing wall to non-rated. revision incorporates the removal of a previouly incorrect designation of a rated partition. n/a maher 155-13Details
revision/amendment to pa #2014.0825.4577 (permit # 1336386) - to revise existing wall to non-rated. revision incorporates the removal of a previouly incorrect designation of a rated partition. n/a maher 155-13 | |
| Aug 14, 2014 | Never finaled issued Aug 2014, no final | 33 Powell St | Angotti & Reilly Inc. | remodel of two existing hotel guest rooms at the 2nd floor room #220 & #221. n/a maher ordinanceDetails
remodel of two existing hotel guest rooms at the 2nd floor room #220 & #221. n/a maher ordinance | $95,000 |
| Jun 10, 2014 | Completed final sign-off Jan 2015 | 530 Bush St | Peacock Construction | permit revision to 201108293450, technically infeasable.Details
permit revision to 201108293450, technically infeasable. | |
| Dec 20, 2013 | Never finaled issued Apr 2014, no final | 250 04th St | to demolish 2 stories, office building.Details
to demolish 2 stories, office building. | $26,500 | |
| Nov 22, 2013 | Completed final sign-off Jan 2016 | 2072 Chestnut St | Gene Peterson General Contractor | revision to appl #2013.09.30.8094: due to inspectors request for a framing detail by the architect.replace/repair extg ceiling and mezzanine.Details
revision to appl #2013.09.30.8094: due to inspectors request for a framing detail by the architect.replace/repair extg ceiling and mezzanine. | $6,000 |
| Sep 30, 2013 | Completed final sign-off Jan 2016 | 2072 Chestnut St | Gene Peterson General Contractor | barrier removal improvement for accessible unisex restroom, refurbish all existing surfaces, counters, floors, paint lighting relocate existing washer & dryer.Details
barrier removal improvement for accessible unisex restroom, refurbish all existing surfaces, counters, floors, paint lighting relocate existing washer & dryer. | $32,000 |
| Aug 8, 2013 | Never finaled issued Aug 2013, no final | 530 Bush St | Tutor Perini Corporation | 3rd/4th floors-revision to pa# 2013-0708-1340-construction of new non bearing walls, ceiling to remain exposed (e). new dropped ceiling where indicated on plans. 1 hour rated wall at 4th floor it roomDetails
3rd/4th floors-revision to pa# 2013-0708-1340-construction of new non bearing walls, ceiling to remain exposed (e). new dropped ceiling where indicated on plans. 1 hour rated wall at 4th floor it room | |
| Jul 10, 2013 | Completed final sign-off Feb 2014 | 530 Bush St | Tutor Perini Corporation | 1st/3rd & 4th floors-barrier removal improvement at restrooms; (both men & women's room)Details
1st/3rd & 4th floors-barrier removal improvement at restrooms; (both men & women's room) | $50,000 |
| Jul 8, 2013 | Completed final sign-off Feb 2014 | 530 Bush St | Tutor Perini Corporation | 1st/3rd/4th floors-cosntruction of new non bearing partition walls, new dropped ceiling, doors, casework, finishes. mep separate permitDetails
1st/3rd/4th floors-cosntruction of new non bearing partition walls, new dropped ceiling, doors, casework, finishes. mep separate permit | $480,000 |
| Jun 28, 2013 | Completed final sign-off Jun 2014 | 530 Bush St | Angotti & Reilly Inc. | 3rd & 4th floors-demolition of (e) non bearing walls, ceilings, light fixtures, casework & flooring, per ab-017Details
3rd & 4th floors-demolition of (e) non bearing walls, ceilings, light fixtures, casework & flooring, per ab-017 | $25,000 |
| Jun 28, 2013 | Never finaled issued Sep 2014, no final | 250 04th St | The Whiting-Turner Contracting Company, Sabah International Incorporated, Fuel Oil System, Austin Building & Design, Inc. | to erect 12 stories, 1 basement, 208 units hotel, commercial & restaurant building.Details
to erect 12 stories, 1 basement, 208 units hotel, commercial & restaurant building. | $17,500,000 |
| Jun 5, 2013 | Completed final sign-off Jan 2014 | 1250 Columbus Av | Comren Inc. | basement -hotel meeting rooms, prefunction & public restrooms remodel involving wall & floor finishes, new restroom partitions, new vanities, new inteiror finishes, minor lighting, & new act & suspended gyp board ceiling.Details
basement -hotel meeting rooms, prefunction & public restrooms remodel involving wall & floor finishes, new restroom partitions, new vanities, new inteiror finishes, minor lighting, & new act & suspended gyp board ceiling. | $124,291 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 2770 Taylor St | revision to pa# 201302271093. correcting bldg type to 3a. for documentation purpose only.Details
revision to pa# 201302271093. correcting bldg type to 3a. for documentation purpose only. | ||
| Apr 4, 2013 | Never finaled issued Dec 2013, no final | 50 08th St | Angotti & Reilly Inc. | new awning & lobby entry doors, new glass screen wall at 8th street elevation.Details
new awning & lobby entry doors, new glass screen wall at 8th street elevation. | $125,000 |
| Feb 27, 2013 | Expired or cancelled expired May 2017 | 2770 Taylor St | 3rd floor remodel of e assembly space into new restaurant inlcuding new dining room, bar, and kitchen. new partitions, finishes, casework. exterior work seperate permit & change use to restaurant.Details
3rd floor remodel of e assembly space into new restaurant inlcuding new dining room, bar, and kitchen. new partitions, finishes, casework. exterior work seperate permit & change use to restaurant. | $500,000 | |
| Feb 11, 2013 | Completed final sign-off May 2017 | 2770 Taylor St | demolition of extg non-bearing walls, ceilings. light fixtures, casework, flooring and wall finishes.Details
demolition of extg non-bearing walls, ceilings. light fixtures, casework, flooring and wall finishes. | $35,000 | |
| Jun 20, 2012 | Expired or cancelled cancelled Jan 2026 | 530 Bush St | revision to pa# 2011-0829-3450-hardship request for accessible parkingDetails
revision to pa# 2011-0829-3450-hardship request for accessible parking | ||
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 530 Bush St | Peacock Construction Inc | 8th floor remodeling of office tenant improvements, demo non-structural partitons, new partitions, mep under separate permit.Details
8th floor remodeling of office tenant improvements, demo non-structural partitons, new partitions, mep under separate permit. | $12,000 |
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 530 Bush St | Peacock Construction Inc | barrier removal for 8th floor restrooms; men & women.Details
barrier removal for 8th floor restrooms; men & women. | $15,000 |
| Jan 27, 2012 | Completed final sign-off Feb 2013 | 167 Highland Av | Anvil Builders Inc | windows replacement throughtout complex of 10 building on all sides, approx 600 + windows.Details
windows replacement throughtout complex of 10 building on all sides, approx 600 + windows. | $714,075 |
| Aug 29, 2011 | Completed final sign-off Oct 2011 | 530 Bush St | Peacock Construction Inc | barrier removal at 2nd floor restroomsDetails
barrier removal at 2nd floor restrooms | $15,000 |
| Aug 29, 2011 | Completed final sign-off Jan 2015 | 530 Bush St | Ward Alan Emery Construction Inc. | barrier removal for path of travel to building entry. disabled access complianceDetails
barrier removal for path of travel to building entry. disabled access compliance | $25,000 |
| Oct 1, 2008 | Never finaled issued Oct 2008, no final | 1375 Fillmore St | revise pa 2008.0605.3696: 1st floor-modify (e) storefront entry to conform to ada requirements. new storefront sliding windows at (e) window openings. deferred submittals: future t.i. awning, mechanical, electrical, plumbing, life safety and fire sprinklersDetails
revise pa 2008.0605.3696: 1st floor-modify (e) storefront entry to conform to ada requirements. new storefront sliding windows at (e) window openings. deferred submittals: future t.i. awning, mechanical, electrical, plumbing, life safety and fire sprinklers | $30,000 | |
| Jul 28, 2008 | Expired or cancelled expired Jan 2010 | 1740 Ofarrell St | new accessible toilet room to unoccupied tenant space. applicant requests 834 sqft "m" occ. = 5 occupaned loaded table 29a foot note: 2 = sfbc.Details
new accessible toilet room to unoccupied tenant space. applicant requests 834 sqft "m" occ. = 5 occupaned loaded table 29a foot note: 2 = sfbc. | $15,000 | |
| Jun 5, 2008 | Expired or cancelled expired Jan 2010 | 1375 Fillmore St | ground floor: add new demising wall to existing lease retail space. sprinklers, mechanical, electrical, plumbing and life safety- separate permitsDetails
ground floor: add new demising wall to existing lease retail space. sprinklers, mechanical, electrical, plumbing and life safety- separate permits | $15,000 | |
| Dec 20, 2005 | Completed final sign-off Jun 2006 | 101 California St | Hathaway Dinwiddie Co. | oti-1 27th floor el me ls spDetails
oti-1 27th floor el me ls sp | $13,659 |
| Jul 15, 2005 | Expired or cancelled expired Feb 2021 | 1419 Fillmore St | change of occupancy o existing permit 200409103838 - 1039740. install panic hardwawre on one exit drDetails
change of occupancy o existing permit 200409103838 - 1039740. install panic hardwawre on one exit dr |