Block 0028, lot 015
1250 Columbus Av
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
69 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | In progress filed May 2026, not yet issued | 1250 Columbus Av | Rhino Power Inc | remove and replace 1 (e) rooftop generator. connect to (e) ats.Details
remove and replace 1 (e) rooftop generator. connect to (e) ats. | $45,000 |
| Nov 14, 2025 | In progress issued Jan 2026 | 1250 Columbus Av | Fuel Oil System | extend the vent on the (e) deisel fuel tank to 3ft above the parapet. replace the (e) fuel suction and discharge. r/r (e) fuel piping between day tank and generator.Details
extend the vent on the (e) deisel fuel tank to 3ft above the parapet. replace the (e) fuel suction and discharge. r/r (e) fuel piping between day tank and generator. | $25,000 |
| Sep 30, 2025 | Completed final sign-off Apr 2026 | 1250 Columbus Av | High Band Construction Inc | at&t modification of (e) wireless facility consisting: r/r 3 antennas; r/r (3) rrus; remove (1) infinity power plant; 1 battery rack 2 converters 7 rectifiers (1) 225 cabinet; (20) 190 ah batteries. install (1) vertiv 7100 power plant; 1 battery rack; 11 converters; 1 esure converters.Details
at&t modification of (e) wireless facility consisting: r/r 3 antennas; r/r (3) rrus; remove (1) infinity power plant; 1 battery rack 2 converters 7 rectifiers (1) 225 cabinet; (20) 190 ah batteries. install (1) vertiv 7100 power plant; 1 battery rack; 11 converters; 1 esure converters. | $44,300 |
| Oct 2, 2023 | Completed final sign-off Dec 2024 | 1250 Columbus Av | Endeavor Wireless Construction Inc | t-moble: remove (9) (e) antennas, install (6) (n) antennas, remove (3) (e) rrus install (3) (n) rrus remove (2) (e) cabinets, install (4) (n)cabinets, install batteriesDetails
t-moble: remove (9) (e) antennas, install (6) (n) antennas, remove (3) (e) rrus install (3) (n) rrus remove (2) (e) cabinets, install (4) (n)cabinets, install batteries | $60,000 |
| Jul 7, 2022 | Completed final sign-off Mar 2023 | 1250 Columbus Av | Electric Tech Construction Inc | at&t modification of an unmanned telecom facility consisting of r + r (6) antennas; antenna mounts sector a; remove (9) rrus; install new rf safety signs barricades strapping @ rooftop; remove (20) 155 ah batteries; (4) 160ah batteries; install (20) 190ah lead acid batteries in existing battery cabiDetails
at&t modification of an unmanned telecom facility consisting of r + r (6) antennas; antenna mounts sector a; remove (9) rrus; install new rf safety signs barricades strapping @ rooftop; remove (20) 155 ah batteries; (4) 160ah batteries; install (20) 190ah lead acid batteries in existing battery cabi | $85,000 |
| Sep 10, 2021 | Completed final sign-off Oct 2021 | 1250 Columbus Av | Cosco Fire Protection Inc. | replace and relocate (e) automatic fire sprinkler service back flow deviceDetails
replace and relocate (e) automatic fire sprinkler service back flow device | $17,000 |
| Dec 18, 2020 | Expired or cancelled cancelled Jan 2026 | 1250 Columbus Av | t-mobile modification to an (e) wireless facility. remove 6 antennas, 3 rru's, 1 cabinet. install 6 antennas, 6 rru's, 4 equipment cabinets. all antennas will be concealed by existing frp screening.Details
t-mobile modification to an (e) wireless facility. remove 6 antennas, 3 rru's, 1 cabinet. install 6 antennas, 6 rru's, 4 equipment cabinets. all antennas will be concealed by existing frp screening. | $40,000 | |
| Jul 27, 2020 | Completed final sign-off Mar 2021 | 1250 Columbus Av | Metropolitan Electrical Construction | remove (1) existing & install new (1) at&t panel antenna per sector, (3) total-remove (1) existing & install new (1) at&t rrus per sector, (3) total-install (1) new at&t dc-9 surge suppressor per sector, (3) total-install (2) new at&t dc power trunks per sector, (6) totalDetails
remove (1) existing & install new (1) at&t panel antenna per sector, (3) total-remove (1) existing & install new (1) at&t rrus per sector, (3) total-install (1) new at&t dc-9 surge suppressor per sector, (3) total-install (2) new at&t dc power trunks per sector, (6) total | $29,600 |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 1250 Columbus Av | H C I Systems Inc | 1/f: installation of 1 (n) smoke detector for electromag door holders at golden gate room. (n) device to be rited into nearst (e) initiating device.ref sheet fa-3d.installationg of (n) high power control relay module. (e) facp is edwards est3 system. ref t.i. 201808308750. maher n/a.Details
1/f: installation of 1 (n) smoke detector for electromag door holders at golden gate room. (n) device to be rited into nearst (e) initiating device.ref sheet fa-3d.installationg of (n) high power control relay module. (e) facp is edwards est3 system. ref t.i. 201808308750. maher n/a. | $300 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 1250 Columbus Av | street spaceDetails
street space | ||
| Aug 30, 2018 | Completed final sign-off Feb 2019 | 1250 Columbus Av | Hathaway Dinwiddie Co. | first floor-renovate interiors of existing lobby (revise tv location & ada ramp correction). lighting revisions to existing golden gate meeting room. no structural work, mechanical work, or plumbing work. no exterior work. n/a for maher.Details
first floor-renovate interiors of existing lobby (revise tv location & ada ramp correction). lighting revisions to existing golden gate meeting room. no structural work, mechanical work, or plumbing work. no exterior work. n/a for maher. | $55,000 |
| Mar 30, 2018 | Completed final sign-off Mar 2019 | 1250 Columbus Av | Shah & Associates Inc Dba P D C Corporat | at&t wireless r&r 6 antennas, install 3 fiber tricks, install 1 dc-12 in equipm area, install 3 dc6, 3 rrus-32 bgg, 3 rrus-32-b30, 3 rrus-4478, 3 rrus-12 b2, 1 gps antenna, swap 1 dos-41 with 1 5216 and 1 vmu in u2 cjassis. install 1 v2 & 1 19" rackDetails
at&t wireless r&r 6 antennas, install 3 fiber tricks, install 1 dc-12 in equipm area, install 3 dc6, 3 rrus-32 bgg, 3 rrus-32-b30, 3 rrus-4478, 3 rrus-12 b2, 1 gps antenna, swap 1 dos-41 with 1 5216 and 1 vmu in u2 cjassis. install 1 v2 & 1 19" rack | $15,000 |
| Jan 5, 2018 | Expired or cancelled cancelled Jun 2018 | 1250 Columbus Av | swap (3) panels antennas, swap (3) rrus, install (3) rrus, install (1) xmu unit inside existing cabinet/rack & install aisg cable.Details
swap (3) panels antennas, swap (3) rrus, install (3) rrus, install (1) xmu unit inside existing cabinet/rack & install aisg cable. | $15,000 | |
| Nov 17, 2017 | Completed final sign-off Jan 2019 | 1250 Columbus Av | H C I Systems Inc | f/a: installation of 6 new monitor modules for monitoring of the fan run status and 6 nw control relay modules for the shut down of csfm in each rooftop mechanical unit. new modules are to be tied into the mearest addressable device. ref app#201708164988. n/a for maherDetails
f/a: installation of 6 new monitor modules for monitoring of the fan run status and 6 nw control relay modules for the shut down of csfm in each rooftop mechanical unit. new modules are to be tied into the mearest addressable device. ref app#201708164988. n/a for maher | $14,979 |
| Aug 16, 2017 | Never finaled issued Oct 2017, no final | 1250 Columbus Av | Emcor Services/Mesa Energy Systems Inc | 6 rooftop heating and ventilation unit replacement. 1 exhaust fan unit replacement (roof top unit). all units are like for like replacements. n/a ordinance #155-13Details
6 rooftop heating and ventilation unit replacement. 1 exhaust fan unit replacement (roof top unit). all units are like for like replacements. n/a ordinance #155-13 | $140,000 |
| Jul 12, 2017 | Completed final sign-off Sep 2017 | 1250 Columbus Av | H C I Systems Inc | as-built resubmittal. ref pa #2016-1214-4980.Details
as-built resubmittal. ref pa #2016-1214-4980. | |
| Jan 5, 2017 | Completed final sign-off Jul 2017 | 1250 Columbus Av | Cw Horton General Contractor | barrier removal to provide ada access to lower level of extg fitness center for hotel guests use only. scope includes removing a bathroom.Details
barrier removal to provide ada access to lower level of extg fitness center for hotel guests use only. scope includes removing a bathroom. | $150,000 |
| Dec 16, 2016 | Completed final sign-off Jul 2017 | 1250 Columbus Av | Nu Rev Communications Inc. | revision to app#201601126924 upgrade conduit and wire size 2" conduit emt, wire size 3awg, new 100 a fuse trasformer. more detail on plan increase generation receptical from 100a to 200 a. transfer switch between cabinet 2 and pbc. new plan details from motor control center.Details
revision to app#201601126924 upgrade conduit and wire size 2" conduit emt, wire size 3awg, new 100 a fuse trasformer. more detail on plan increase generation receptical from 100a to 200 a. transfer switch between cabinet 2 and pbc. new plan details from motor control center. | |
| Dec 14, 2016 | Completed final sign-off Sep 2017 | 1250 Columbus Av | H C I Systems Inc | replacement of existing facp to new edwards est 3 system. replacement of all (e) initiating devices to be compatible with new est 3 & install new fa devices to meet current code & sffd requirements. as built plan are required before finliazing this permit.Details
replacement of existing facp to new edwards est 3 system. replacement of all (e) initiating devices to be compatible with new est 3 & install new fa devices to meet current code & sffd requirements. as built plan are required before finliazing this permit. | $537,070 |
| Dec 2, 2016 | Completed final sign-off May 2017 | 1250 Columbus Av | R L H Fire Protection Inc | floors 2-5: fire sprinkler permit. relocate all sprinklers with new sprinklers in all guest rooms. 944 total 412 pendents, 316 ec sidewalls 216 sidewalk. t.i. 2016-0714-2384.Details
floors 2-5: fire sprinkler permit. relocate all sprinklers with new sprinklers in all guest rooms. 944 total 412 pendents, 316 ec sidewalls 216 sidewalk. t.i. 2016-0714-2384. | $191,840 |
| Jul 14, 2016 | Completed final sign-off Oct 2017 | 1250 Columbus Av | Cw Horton General Contractor | renovate 285 (e) guestrooms include tub to shower pluming conversion. new fl & wall finishes & new ff & e. upgrade 10 (e) guestrm for accessiblity req. conversion of 17 (e) guestrm to communication rm. renovate (e) cordidors include replace decorative light fixture in kind. new led light in elevatoDetails
renovate 285 (e) guestrooms include tub to shower pluming conversion. new fl & wall finishes & new ff & e. upgrade 10 (e) guestrm for accessiblity req. conversion of 17 (e) guestrm to communication rm. renovate (e) cordidors include replace decorative light fixture in kind. new led light in elevato | $900,000 |
| Feb 18, 2016 | Completed final sign-off Sep 2016 | 1250 Columbus Av | University Of California Fire Prevention | add fire sprinklers to the walk in cooler on 1st floor inside kitchen areaDetails
add fire sprinklers to the walk in cooler on 1st floor inside kitchen area | $3,000 |
| Jan 12, 2016 | Completed final sign-off Jul 2017 | 1250 Columbus Av | Nu Rev Communications Inc. | t-mobile proposes to modify an extg telecommunication facility by 1) install 3 new antennas. 2)install 3 new rru's. 3)upgrade the electrical system from 100a to 200a.Details
t-mobile proposes to modify an extg telecommunication facility by 1) install 3 new antennas. 2)install 3 new rru's. 3)upgrade the electrical system from 100a to 200a. | $25,000 |
| Oct 23, 2013 | Completed final sign-off Jan 2014 | 1250 Columbus Av | Red Hawk Fire & Security Ca Llc | basement: adding 3 smoke detectors, one interposing relay, one horn/strobe and 2 strobes to replace extg. ref app#201306058719Details
basement: adding 3 smoke detectors, one interposing relay, one horn/strobe and 2 strobes to replace extg. ref app#201306058719 | $5,000 |
| Oct 22, 2013 | Completed final sign-off Mar 2015 | 1250 Columbus Av | Electric Tech Construction Inc | modification to an (e) at&t facility including installation of 3 (n) rrv's near (e) antennas and 3 (n) 2-inch inner ducts for fiber & dc power.Details
modification to an (e) at&t facility including installation of 3 (n) rrv's near (e) antennas and 3 (n) 2-inch inner ducts for fiber & dc power. | $20,000 |
| Jun 5, 2013 | Completed final sign-off Jan 2014 | 1250 Columbus Av | Comren Inc. | basement -hotel meeting rooms, prefunction & public restrooms remodel involving wall & floor finishes, new restroom partitions, new vanities, new inteiror finishes, minor lighting, & new act & suspended gyp board ceiling.Details
basement -hotel meeting rooms, prefunction & public restrooms remodel involving wall & floor finishes, new restroom partitions, new vanities, new inteiror finishes, minor lighting, & new act & suspended gyp board ceiling. | $124,291 |
| Jan 29, 2013 | Never finaled issued Jan 2013, no final | 1250 Columbus Av | street space for 2623 jones (not in the system)Details
street space for 2623 jones (not in the system) | ||
| Oct 23, 2012 | Completed final sign-off Sep 2013 | 1250 Columbus Av | Jfc Construction Inc. | replace 2 equipment cabinets & 3 antennas & add 3 (n) antennas at (e) t-mobile wireless site.Details
replace 2 equipment cabinets & 3 antennas & add 3 (n) antennas at (e) t-mobile wireless site. | $57,000 |
| Jul 23, 2012 | Expired or cancelled cancelled Mar 2020 | 1250 Columbus Av | remove & relocate 3 (e) antenna with similar. add 3 new prus at antennas. install (n) 6601 umt in (e) 19" rack.Details
remove & relocate 3 (e) antenna with similar. add 3 new prus at antennas. install (n) 6601 umt in (e) 19" rack. | $12,000 | |
| May 16, 2011 | Never finaled issued May 2011, no final | 1250 Columbus Av | University Of California Fire Prevention | removal of class ii hose cabinets per fire marshal approval letter dated 04/06/11. building is sprinklered to nfpa 13. jh (removal of fire hoses and cap valves)Details
removal of class ii hose cabinets per fire marshal approval letter dated 04/06/11. building is sprinklered to nfpa 13. jh (removal of fire hoses and cap valves) | $500 |
| Feb 18, 2011 | Expired or cancelled cancelled Apr 2012 | 1250 Columbus Av | remove 2 (e) t-mobile cabinets and replace with 2 (n) t-mobile cabinets.Details
remove 2 (e) t-mobile cabinets and replace with 2 (n) t-mobile cabinets. | $10,000 | |
| Feb 1, 2011 | Never finaled issued Feb 2011, no final | 1250 Columbus Av | street space & meter parkingDetails
street space & meter parking | ||
| Jan 20, 2011 | Completed final sign-off May 2011 | 1250 Columbus Av | Diversified Fire Products | fire alarm t.i.,7 door bolders,8 control relays, 7 duct detectors,8 smoke detectors, 7 horn stroobes,5 strobesDetails
fire alarm t.i.,7 door bolders,8 control relays, 7 duct detectors,8 smoke detectors, 7 horn stroobes,5 strobes | $7,135 |
| Dec 29, 2010 | Completed final sign-off Jul 2011 | 1250 Columbus Av | Pribuss Engineering Inc | relocate 82 heads,add 13 heads,change out 4/99 heads/7440 sq ft x 550=40920Details
relocate 82 heads,add 13 heads,change out 4/99 heads/7440 sq ft x 550=40920 | $40,920 |
| Dec 20, 2010 | Completed final sign-off Jul 2011 | 1250 Columbus Av | to obtain final inspection for work approved under pa#200509223565 all work complete.Details
to obtain final inspection for work approved under pa#200509223565 all work complete. | ||
| Dec 20, 2010 | Completed final sign-off Apr 2011 | 1250 Columbus Av | to obtain final inspection for work approved under pa#200812229018 all work complete.Details
to obtain final inspection for work approved under pa#200812229018 all work complete. | ||
| Nov 16, 2010 | Completed final sign-off Jan 2012 | 1250 Columbus Av | Broken Arrow Communications Inc | swap 6 antennas, add 3418 cabinet in e equip room, add 3 rru's, add n frp screen to sector aDetails
swap 6 antennas, add 3418 cabinet in e equip room, add 3 rru's, add n frp screen to sector a | $85,000 |
| Nov 12, 2010 | Never finaled issued Nov 2010, no final | 1250 Columbus Av | street space and mta parkingDetails
street space and mta parking | ||
| Nov 4, 2010 | Never finaled issued Nov 2010, no final | 1250 Columbus Av | street spaceDetails
street space | ||
| Sep 13, 2010 | Never finaled issued Sep 2010, no final | 1250 Columbus Av | street space and mtaDetails
street space and mta | ||
| Jul 19, 2010 | Completed final sign-off Jul 2011 | 1250 Columbus Av | 1st floor lobby, restaurant & meeting rooms. verify occupant loads for new assembly areas. no exterior work.Details
1st floor lobby, restaurant & meeting rooms. verify occupant loads for new assembly areas. no exterior work. | $550,000 | |
| Apr 19, 2010 | Completed final sign-off Jul 2010 | 1250 Columbus Av | Golden Gate Sign Company Inc. | replace 8 electric wall signsDetails
replace 8 electric wall signs | $40,000 |
| Mar 25, 2010 | Expired or cancelled expired Apr 2011 | 1250 Columbus Av | Diversified Fire Products | fire alarm t.i. - elevator upgrade, 4 control relays.Details
fire alarm t.i. - elevator upgrade, 4 control relays. | $9,245 |
| Mar 12, 2010 | Expired or cancelled withdrawn Jun 2022 | 1250 Columbus Av | at&t. a modification to an (e) umanned telecomunication facility consisting of adding a (n) 3418 in an (e) equipemnt room. removing and replacing six (e) antennas and adding three (n) rru's and fiber to each sectorDetails
at&t. a modification to an (e) umanned telecomunication facility consisting of adding a (n) 3418 in an (e) equipemnt room. removing and replacing six (e) antennas and adding three (n) rru's and fiber to each sector | $26,000 | |
| Sep 24, 2009 | Expired or cancelled expired Apr 2011 | 1250 Columbus Av | Diversified Fire Products | fire alarm ti, upgrade current facp mon est-2 to est-3 panel replacementDetails
fire alarm ti, upgrade current facp mon est-2 to est-3 panel replacement | $35,000 |
| Sep 23, 2009 | Never finaled issued Sep 2009, no final | 1250 Columbus Av | street space only.Details
street space only. | ||
| Aug 13, 2009 | Never finaled issued Aug 2009, no final | 1250 Columbus Av | street spaceDetails
street space | ||
| Jun 24, 2009 | Never finaled issued Jun 2009, no final | 1250 Columbus Av | street space permitDetails
street space permit | ||
| Mar 17, 2009 | Expired or cancelled cancelled Feb 2012 | 1250 Columbus Av | add 1 equipment cabinet on roof and replace 3 antennas at extg wireless telecommunications faucility(t-mobile)Details
add 1 equipment cabinet on roof and replace 3 antennas at extg wireless telecommunications faucility(t-mobile) | $20,000 | |
| Feb 26, 2009 | Completed final sign-off Mar 2009 | 1250 Columbus Av | Cosco Fire Protection Inc. | renew pa# 2006/08/10/9120 obtain final inspection. all work has been completed.Details
renew pa# 2006/08/10/9120 obtain final inspection. all work has been completed. | |
| Feb 18, 2009 | Completed final sign-off Sep 2010 | 1250 Columbus Av | Diversified Fire Products | fire alarm t. o. for ada upgrade on floors 2-5. 4 power supplies. 36 strobes. 22 input modulesDetails
fire alarm t. o. for ada upgrade on floors 2-5. 4 power supplies. 36 strobes. 22 input modules | $21,500 |
| Dec 23, 2008 | Expired or cancelled expired Nov 2010 | 1250 Columbus Av | Metropolitan Electrical Construction | remove existing cabinet and replace with smaller cabinet and add (ret) remote tilt unit under antennas along with rru cable box to existing coax route. no visual change.Details
remove existing cabinet and replace with smaller cabinet and add (ret) remote tilt unit under antennas along with rru cable box to existing coax route. no visual change. | $5,000 |
| Dec 22, 2008 | Expired or cancelled expired Nov 2010 | 1250 Columbus Av | Bellanti Plumbing Inc | revise sprinkler head locations for new t i remodelingDetails
revise sprinkler head locations for new t i remodeling | $2,500 |
| Oct 30, 2008 | Never finaled issued Oct 2008, no final | 1250 Columbus Av | street space permit only.Details
street space permit only. | ||
| Oct 8, 2008 | Never finaled issued Oct 2008, no final | 1250 Columbus Av | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Aug 18, 2008 | Completed final sign-off Sep 2010 | 1250 Columbus Av | Howard S. Wright Constructors Lp | 1st thru 5th floors - guest room & guest corridor finish replacements, ada upgrades to guest room & guest corridor, mechanical, electrical & plumbing.Details
1st thru 5th floors - guest room & guest corridor finish replacements, ada upgrades to guest room & guest corridor, mechanical, electrical & plumbing. | $4,500,000 |
| Aug 10, 2006 | Expired or cancelled expired Jan 2009 | 1250 Columbus Av | Cosco Fire Protection Inc. | fire sprinkler tenant improvment at hotel ballroom. approx 39 sprinkler heads, no additional square footage, no change in occupanyDetails
fire sprinkler tenant improvment at hotel ballroom. approx 39 sprinkler heads, no additional square footage, no change in occupany | $14,398 |
| Aug 4, 2006 | Expired or cancelled expired Jan 2009 | 1250 Columbus Av | Turner Construction Co | provide (n) devices for the golden gate. ballroom remodel includes: (n) audible/visual notification appliances, 2 (n) dual synchronization modules, control relays & duct smoke detectors for fan shutdown.Details
provide (n) devices for the golden gate. ballroom remodel includes: (n) audible/visual notification appliances, 2 (n) dual synchronization modules, control relays & duct smoke detectors for fan shutdown. | $15,500 |
| Jun 14, 2006 | Never finaled issued Jun 2006, no final | 1250 Columbus Av | street space permitDetails
street space permit | ||
| May 3, 2006 | Never finaled issued May 2006, no final | 1250 Columbus Av | street space & sidewalkDetails
street space & sidewalk | ||
| Sep 22, 2005 | Expired or cancelled expired Jan 2009 | 1250 Columbus Av | remodel (e) ballroom and staff break room reconfigure ballroom entries and service coridor newDetails
remodel (e) ballroom and staff break room reconfigure ballroom entries and service coridor new | $460,000 | |
| Aug 26, 2005 | Expired or cancelled expired Jan 2009 | 1250 Columbus Av | Beacon Fire & Safety Lp/Nickell Fire Equ | furnish/install pcl-460/460/360 (ul-300)automatic fire suppression system in kitchenDetails
furnish/install pcl-460/460/360 (ul-300)automatic fire suppression system in kitchen | $6,000 |
| Oct 28, 2003 | Completed final sign-off Nov 2003 | 1250 Columbus Av | omit one pull station from approved fire alarm plans permit #200309043793 pull station not requiredDetails
omit one pull station from approved fire alarm plans permit #200309043793 pull station not required | ||
| Sep 4, 2003 | Completed final sign-off Nov 2003 | 1250 Columbus Av | Morton Smith Electrical Inc | relocate existing devices add 1 strobeDetails
relocate existing devices add 1 strobe | $400 |
| Aug 26, 2003 | Completed final sign-off Nov 2003 | 1250 Columbus Av | R L H Fire Protection Inc | fire sprinkler tenant improvement to lower level mtg. room: relocate 19 heads, delete 5 heads, add 2Details
fire sprinkler tenant improvement to lower level mtg. room: relocate 19 heads, delete 5 heads, add 2 | $2,300 |
| Jun 2, 2003 | Completed final sign-off Nov 2003 | 1250 Columbus Av | Details
| $50,000 | |
| Feb 12, 2003 | Completed final sign-off Nov 2003 | 1250 Columbus Av | remodel meetingrm,add skylight, small meetingrm, update restrms for accessibility, lighting and doorDetails
remodel meetingrm,add skylight, small meetingrm, update restrms for accessibility, lighting and door | $210,000 | |
| Jun 27, 2001 | Expired or cancelled expired Oct 2001 | 1250 Columbus Av | sidewalk & street space repairDetails
sidewalk & street space repair | ||
| Sep 5, 2000 | Expired or cancelled expired Sep 2001 | 1250 Columbus Av | Hornstein Roofing | reroofingDetails
reroofing | $59,000 |
Find contractors for work like this