Adam Amortnont

License
81495
State contractor license record
Listed as
engineer
On San Francisco permits
Sep 2025 to Feb 2026

24 permits since 2000 (engineer on 24 permits): 16 completed, 8 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 18, 2026In progress
filed Feb 2026, not yet issued
833 Mission Statt mods of (e) wireless facility consist of r/r (1) antenna, rotate antennas 10degree azimuth; remove 3 rrus, install 1 rrus, r/r 1 power plant, r/r rectifiers; install converters; (1) 15 & 6 50 amp dc breakers; 1 bbu. relocate 12 190 ah batteries to new power plant. install rf safety sign per eme
Details
Permit
202602186107
Status
filed
Filed
Feb 18, 2026
Declared cost
$80,322
Address
833 Mission St

att mods of (e) wireless facility consist of r/r (1) antenna, rotate antennas 10degree azimuth; remove 3 rrus, install 1 rrus, r/r 1 power plant, r/r rectifiers; install converters; (1) 15 & 6 50 amp dc breakers; 1 bbu. relocate 12 190 ah batteries to new power plant. install rf safety sign per eme

Open the permit page

$80,322
Dec 17, 2025In progress
filed Dec 2025, not yet issued
1799 19th Avat&t modifcation of an (e) wireless facility consisting of: r/r 3 antennas from 2 sectors 6 total. remove 6 rru's & add 3 new rrus & 6 diplexers ; remove 1 dcpp & 9 rectifiers. install 1 omnion cab w/ 8 new rectifiers & 7 converters; n 50a & 15 a breakers; 200 amp breaker kit & upgrade battery
Details
Permit
202512171969
Status
filed
Filed
Dec 17, 2025
Declared cost
$80,322
Address
1799 19th Av

at&t modifcation of an (e) wireless facility consisting of: r/r 3 antennas from 2 sectors 6 total. remove 6 rru's & add 3 new rrus & 6 diplexers ; remove 1 dcpp & 9 rectifiers. install 1 omnion cab w/ 8 new rectifiers & 7 converters; n 50a & 15 a breakers; 200 amp breaker kit & upgrade battery

Open the permit page

$80,322
Dec 17, 2025Completed
final sign-off Oct 2026
900 Palou AvHigh Band Construction Incat&t modifciation of (e) wireless facility consisting of: lower 3 and add 3 new antennas w/mounts; power/fiber trunks. r/r 1 power plant; remove 1 in active cab; r/r rectifiers & converters w/new 10 rectifiers & 8 convertrs; 1 vertiv esure: r/r 20 batteries; install 1 15a & (3) 50 amp dc breakers,
Details
Permit
202512171978
Status
complete
Filed
Dec 17, 2025
Permit issued
Jun 11, 2026
Final sign-off
Oct 1, 2026
Declared cost
$127,100
Address
900 Palou Av

at&t modifciation of (e) wireless facility consisting of: lower 3 and add 3 new antennas w/mounts; power/fiber trunks. r/r 1 power plant; remove 1 in active cab; r/r rectifiers & converters w/new 10 rectifiers & 8 convertrs; 1 vertiv esure: r/r 20 batteries; install 1 15a & (3) 50 amp dc breakers,

Open the permit page

$127,100
Dec 17, 2025Completed
final sign-off May 2026
234 09th StDiablo Telecom & Construction Incat&t modification of an existing wireless facility consisting of install 3 antennas within (e) frp cannisters; r/r 3 rrv's; remove 20 190a batteries & install 20 210a batteries; install 1 expansion shelf kit; 4 rectifiers; 12 converters; 1 15amp, 6 50amp dc breakers; 1 bbu & retrofit; kit, install
Details
Permit
202512171974
Status
complete
Filed
Dec 17, 2025
Permit issued
Mar 27, 2026
Final sign-off
May 20, 2026
Declared cost
$80,300
Address
234 09th St

at&t modification of an existing wireless facility consisting of install 3 antennas within (e) frp cannisters; r/r 3 rrv's; remove 20 190a batteries & install 20 210a batteries; install 1 expansion shelf kit; 4 rectifiers; 12 converters; 1 15amp, 6 50amp dc breakers; 1 bbu & retrofit; kit, install

Open the permit page

$80,300
Dec 17, 2025In progress
filed Dec 2025, not yet issued
1111 California Stat&t modification of an (e)wireless facility consisting of install (2)antennas; relocate (2)antennas; install mount modification. install (1) conversion kit w/ (9)converters, (1) 15amp, (2)50 amp dc breakers; remove (12) (e) batteries + install (2) 50 amp dc breakers; remove (12) existing batteries
Details
Permit
202512171979
Status
filed
Filed
Dec 17, 2025
Declared cost
$50,200
Address
1111 California St

at&t modification of an (e)wireless facility consisting of install (2)antennas; relocate (2)antennas; install mount modification. install (1) conversion kit w/ (9)converters, (1) 15amp, (2)50 amp dc breakers; remove (12) (e) batteries + install (2) 50 amp dc breakers; remove (12) existing batteries

Open the permit page

$50,200
Dec 17, 2025In progress
issued Sep 2026
930 Montgomery StMetropolitan Electrical Constructionat&t modifcation of an (e) wireless facility consisting of: r/r rru's. install 3 antennas, platform reinforcements,4 190a batteries, 1 expansion shelf,1 retrofit kit, 1 conversion kit, 1 converters, 1 15 amp, 6 50 amp dc breakers, 1 bru, rf safety signs, stripping & barricades per rf eme report
Details
Permit
202512171961
Status
issued
Filed
Dec 17, 2025
Permit issued
Sep 1, 2026
Declared cost
$80,322
Address
930 Montgomery St

at&t modifcation of an (e) wireless facility consisting of: r/r rru's. install 3 antennas, platform reinforcements,4 190a batteries, 1 expansion shelf,1 retrofit kit, 1 conversion kit, 1 converters, 1 15 amp, 6 50 amp dc breakers, 1 bru, rf safety signs, stripping & barricades per rf eme report

Open the permit page

$80,322
Dec 11, 2025Completed
final sign-off Jun 2026
678 Portola DrDiablo Telecom & Construction Incat&t modification of (e) wireless facility consisting r/r 3 antennas; remove 6 rrs & install 3; relocate lower 3 antennas; remove 1 macro cabinet; 1 infinity cabinet & rectifiers; install 1 netsure power plant; 12 rectifiers; 11 converters;(1) 15 amp & 6 (50) dc breakers; install (4) 190 a batteries
Details
Permit
202512111485
Status
complete
Filed
Dec 11, 2025
Permit issued
Feb 27, 2026
Final sign-off
Jun 10, 2026
Declared cost
$49,100
Address
678 Portola Dr

at&t modification of (e) wireless facility consisting r/r 3 antennas; remove 6 rrs & install 3; relocate lower 3 antennas; remove 1 macro cabinet; 1 infinity cabinet & rectifiers; install 1 netsure power plant; 12 rectifiers; 11 converters;(1) 15 amp & 6 (50) dc breakers; install (4) 190 a batteries

Open the permit page

$49,100
Dec 11, 2025In progress
filed Dec 2025, not yet issued
244 Jackson Stat&t modification of an (e) wireless facility consisting of r&r 3 rru's; add 3 air antennas w/pipe masts; remove 3 rrus-32 b2; install 1 retrofit kit w/converters (10); (6) 50 amps (1) 15 amp dc breakers; (1) g4 bbu; (2) conversion shelf & remove (4) converters. install rf safety rf safety signs,
Details
Permit
202512111482
Status
filed
Filed
Dec 11, 2025
Declared cost
$80,322
Address
244 Jackson St

at&t modification of an (e) wireless facility consisting of r&r 3 rru's; add 3 air antennas w/pipe masts; remove 3 rrus-32 b2; install 1 retrofit kit w/converters (10); (6) 50 amps (1) 15 amp dc breakers; (1) g4 bbu; (2) conversion shelf & remove (4) converters. install rf safety rf safety signs,

Open the permit page

$80,322
Dec 3, 2025Completed
final sign-off Jun 2026
1555 Irving StMetropolitan Electrical Constructionat&t modification of an unmanned wireless facility consisting of: r/r (3) antennas within existing frp structure; r/r 1 power plant; r/r 1 battery rack; relocate 20 batteries; remove 4 rectifiers; install 10 rectifiers, 9 converters +(3) 50 amp dc breakers in new power plant.
Details
Permit
202512030809
Status
complete
Filed
Dec 3, 2025
Permit issued
Mar 25, 2026
Final sign-off
Jun 4, 2026
Declared cost
$36,000
Address
1555 Irving St

at&t modification of an unmanned wireless facility consisting of: r/r (3) antennas within existing frp structure; r/r 1 power plant; r/r 1 battery rack; relocate 20 batteries; remove 4 rectifiers; install 10 rectifiers, 9 converters +(3) 50 amp dc breakers in new power plant.

Open the permit page

$36,000
Dec 3, 2025In progress
issued Mar 2026
400 Post StMetropolitan Electrical Constructionat&t modification wireless facility consisting of: remove 9 antennas within existing frp structure; install 7 antennas; r/r rru's; remove 6 tma; remove 3 cabinets; install 2 omnion cabinets with rectifiers + converters; & (1) 15amp, 6 (50) amp + (3) 25 amp dc breakers.
Details
Permit
202512030814
Status
issued
Filed
Dec 3, 2025
Permit issued
Mar 4, 2026
Declared cost
$80,300
Address
400 Post St

at&t modification wireless facility consisting of: remove 9 antennas within existing frp structure; install 7 antennas; r/r rru's; remove 6 tma; remove 3 cabinets; install 2 omnion cabinets with rectifiers + converters; & (1) 15amp, 6 (50) amp + (3) 25 amp dc breakers.

Open the permit page

$80,300
Nov 25, 2025Completed
final sign-off Aug 2026
260 Golden Gate AvMetropolitan Electrical Constructionmodification of an existing unmanned at&t wireless facility consisting of: r/r 3 antennas & 3 rrus. remove one infinity power plant, 5 convertors, 8 rectifiers & 1 rbs cabinets. install one netsure pp with 11 new rectifiers, 10 converters, 6 dc amp breakers. install rf safety signage, stripping &
Details
Permit
202511250387
Status
complete
Filed
Nov 25, 2025
Permit issued
Apr 23, 2026
Final sign-off
Aug 14, 2026
Declared cost
$52,000
Address
260 Golden Gate Av

modification of an existing unmanned at&t wireless facility consisting of: r/r 3 antennas & 3 rrus. remove one infinity power plant, 5 convertors, 8 rectifiers & 1 rbs cabinets. install one netsure pp with 11 new rectifiers, 10 converters, 6 dc amp breakers. install rf safety signage, stripping &

Open the permit page

$52,000
Nov 25, 2025Completed
final sign-off Aug 2026
776 Bush StDiablo Telecom & Construction Incat&t modification of an (e) unmanned wireless facility consisting of r/r 3 antennas; r/r 1 power plant with netsure 7100 pp; install 1 battery rack; relocate 12 existing 190 amp (8) 180a batteries to new battery rack; 9 converters; 11 rectifiers (3)50dc breakers in new netsure pp. install rf safety
Details
Permit
202511250372
Status
complete
Filed
Nov 25, 2025
Permit issued
May 15, 2026
Final sign-off
Aug 17, 2026
Declared cost
$50,200
Address
776 Bush St

at&t modification of an (e) unmanned wireless facility consisting of r/r 3 antennas; r/r 1 power plant with netsure 7100 pp; install 1 battery rack; relocate 12 existing 190 amp (8) 180a batteries to new battery rack; 9 converters; 11 rectifiers (3)50dc breakers in new netsure pp. install rf safety

Open the permit page

$50,200
Nov 25, 2025Completed
final sign-off Jun 2026
726 Polk StDiablo Telecom & Construction Incmodification of an att&t unmanned (e) wireless facility:r/r 3 antennas & 3 rrus. install 2 conversion upgrade kit; converter/rectafier expansion shelf: 10 converters & 3 50 amps dc breakers in (e) netsure 7100 power plant. install rf safety signage, strippings & burricades per rf report.
Details
Permit
202511250386
Status
complete
Filed
Nov 25, 2025
Permit issued
Jan 21, 2026
Final sign-off
Jun 9, 2026
Declared cost
$45,000
Address
726 Polk St

modification of an att&t unmanned (e) wireless facility:r/r 3 antennas & 3 rrus. install 2 conversion upgrade kit; converter/rectafier expansion shelf: 10 converters & 3 50 amps dc breakers in (e) netsure 7100 power plant. install rf safety signage, strippings & burricades per rf report.

Open the permit page

$45,000
Nov 14, 2025Completed
final sign-off Jun 2026
250 Clay StDiablo Telecom & Construction Incat&t modifications of existing wireless facility consisting of remove & replace 2 antennas; install rf safety signs, stripipings or barricades on rooftop; remove 1 infinity power plant & 8 rectifiers; install 1 vertiv netsure power plant; 9 rectifiers and 7 converters
Details
Permit
202511149638
Status
complete
Filed
Nov 14, 2025
Permit issued
Feb 11, 2026
Final sign-off
Jun 1, 2026
Declared cost
$35,000
Address
250 Clay St

at&t modifications of existing wireless facility consisting of remove & replace 2 antennas; install rf safety signs, stripipings or barricades on rooftop; remove 1 infinity power plant & 8 rectifiers; install 1 vertiv netsure power plant; 9 rectifiers and 7 converters

Open the permit page

$35,000
Nov 12, 2025Completed
final sign-off May 2026
899 Hyde StDiablo Telecom & Construction Incat7t modification of an unmanned wireless facility consising of: r&r 3 antennas; 3 antenna masts; install 1 vertiv upgrade conversion kit; 9 converters & 1 rectiver; install (4) 210 ah batteries; rf safety signage, stripping & barricades
Details
Permit
202511129377
Status
complete
Filed
Nov 12, 2025
Permit issued
Apr 9, 2026
Final sign-off
May 20, 2026
Declared cost
$27,000
Address
899 Hyde St

at7t modification of an unmanned wireless facility consising of: r&r 3 antennas; 3 antenna masts; install 1 vertiv upgrade conversion kit; 9 converters & 1 rectiver; install (4) 210 ah batteries; rf safety signage, stripping & barricades

Open the permit page

$27,000
Nov 12, 2025Completed
final sign-off Aug 2026
2001 Union StDiablo Telecom & Construction Incmodification of an (e) wireless facililty consisting of: remove and replace (3) antennas, remove (1) power plant (1) battery cabinet, (1) rsb 3205 cabinet (9) rectifiers and (5) converters. install (1) netsure power plant(1) butter rack (11) rectifiers, (10) converters, relocate dc breakers to
Details
Permit
202511129422
Status
complete
Filed
Nov 12, 2025
Permit issued
Apr 9, 2026
Final sign-off
Aug 6, 2026
Declared cost
$34,000
Address
2001 Union St

modification of an (e) wireless facililty consisting of: remove and replace (3) antennas, remove (1) power plant (1) battery cabinet, (1) rsb 3205 cabinet (9) rectifiers and (5) converters. install (1) netsure power plant(1) butter rack (11) rectifiers, (10) converters, relocate dc breakers to

Open the permit page

$34,000
Sep 30, 2025Completed
final sign-off May 2026
2110 Ingalls StMetropolitan Electrical Constructionat&t modification of an existing wireless facility consisting remove and replace 3 antennas; install rf safety signs, stripping & barricades; remove two 3106 cabinets; one infinity power plant; 10 rectifiers; install one netsure power plant; 9 rectifiers; 9 converters; relocate (12) 180 ah
Details
Permit
202509306375
Status
complete
Filed
Sep 30, 2025
Permit issued
Dec 31, 2025
Final sign-off
May 14, 2026
Declared cost
$34,000
Address
2110 Ingalls St

at&t modification of an existing wireless facility consisting remove and replace 3 antennas; install rf safety signs, stripping & barricades; remove two 3106 cabinets; one infinity power plant; 10 rectifiers; install one netsure power plant; 9 rectifiers; 9 converters; relocate (12) 180 ah

Open the permit page

$34,000
Sep 30, 2025Completed
final sign-off Apr 2026
1250 Columbus AvHigh Band Construction Incat&t modification of (e) wireless facility consisting: r/r 3 antennas; r/r (3) rrus; remove (1) infinity power plant; 1 battery rack 2 converters 7 rectifiers (1) 225 cabinet; (20) 190 ah batteries. install (1) vertiv 7100 power plant; 1 battery rack; 11 converters; 1 esure converters.
Details
Permit
202509306400
Status
complete
Filed
Sep 30, 2025
Permit issued
Feb 9, 2026
Final sign-off
Apr 8, 2026
Declared cost
$44,300
Address
1250 Columbus Av

at&t modification of (e) wireless facility consisting: r/r 3 antennas; r/r (3) rrus; remove (1) infinity power plant; 1 battery rack 2 converters 7 rectifiers (1) 225 cabinet; (20) 190 ah batteries. install (1) vertiv 7100 power plant; 1 battery rack; 11 converters; 1 esure converters.

Open the permit page

$44,300
Sep 30, 2025In progress
filed Sep 2025, not yet issued
1 Richardson Avat&t modifications of (e) wireless facility consisting: install (3) air antennas; adjust azimuths; remove (1) infinity cab (pp); 1 rack; relocate (4) 190 f battereis to 1 netsure battery rack; remove 916) 155 batteries; install 916) new 190 a batteries; install (1) netsure 7100 power plant;
Details
Permit
202509306356
Status
filed
Filed
Sep 30, 2025
Declared cost
$50,200
Address
1 Richardson Av

at&t modifications of (e) wireless facility consisting: install (3) air antennas; adjust azimuths; remove (1) infinity cab (pp); 1 rack; relocate (4) 190 f battereis to 1 netsure battery rack; remove 916) 155 batteries; install 916) new 190 a batteries; install (1) netsure 7100 power plant;

Open the permit page

$50,200
Sep 17, 2025Completed
final sign-off Jun 2026
901 Cole StMetropolitan Electrical Constructionat&t modification of (e) wireless facility consisting of r/r 3 antennas; remove 6 rrus; install 3 (n) rrus; remove 1 infinity power plant; 9 rectifiers; 4 converters & 4 batteries from (e) power plant; install 1(n) netsure power plant; 12 rectifiers; 11 converters; 91) 15 amp; (6) 30 amp breakers
Details
Permit
202509175457
Status
complete
Filed
Sep 17, 2025
Permit issued
Dec 31, 2025
Final sign-off
Jun 16, 2026
Declared cost
$50,200
Address
901 Cole St

at&t modification of (e) wireless facility consisting of r/r 3 antennas; remove 6 rrus; install 3 (n) rrus; remove 1 infinity power plant; 9 rectifiers; 4 converters & 4 batteries from (e) power plant; install 1(n) netsure power plant; 12 rectifiers; 11 converters; 91) 15 amp; (6) 30 amp breakers

Open the permit page

$50,200
Sep 17, 2025Completed
final sign-off Jul 2026
375 Laguna Honda BlMetropolitan Electrical Constructionat&t modificiation of an (e) wireless facility consisting of: lower 3 & add 3 antennas; r/r 3 rrus; remove 1 power plant; 13 rectifiers; install (1) netsure power plant; (9) 58v converters, (12) 48v rectifiers; (1)g4 bbu, (a) 15a, (3) 30a dc breakers; rf safety signage stripping & barricades
Details
Permit
202509175461
Status
complete
Filed
Sep 17, 2025
Permit issued
Mar 4, 2026
Final sign-off
Jul 2, 2026
Declared cost
$83,700
Address
375 Laguna Honda Bl

at&t modificiation of an (e) wireless facility consisting of: lower 3 & add 3 antennas; r/r 3 rrus; remove 1 power plant; 13 rectifiers; install (1) netsure power plant; (9) 58v converters, (12) 48v rectifiers; (1)g4 bbu, (a) 15a, (3) 30a dc breakers; rf safety signage stripping & barricades

Open the permit page

$83,700
Sep 11, 2025Completed
final sign-off Mar 2026
2 Henry Adams StMetropolitan Electrical Constructionat&t modification of (e) wireless facility consisting of r/r 3 antennas, 3 rrus; remove infinity pp & rbs2206 cabinets; 9 rectifiers & 4 converters; install 1 netsure 7100 w/58v convertion pp; 11 rectifiers; 10 converters; 1 vdc bullet converter; (1) 15amp + (6) 50amp dc breakers
Details
Permit
202509115069
Status
complete
Filed
Sep 11, 2025
Permit issued
Jan 29, 2026
Final sign-off
Mar 16, 2026
Declared cost
$80,300
Address
2 Henry Adams St

at&t modification of (e) wireless facility consisting of r/r 3 antennas, 3 rrus; remove infinity pp & rbs2206 cabinets; 9 rectifiers & 4 converters; install 1 netsure 7100 w/58v convertion pp; 11 rectifiers; 10 converters; 1 vdc bullet converter; (1) 15amp + (6) 50amp dc breakers

Open the permit page

$80,300
Sep 11, 2025In progress
issued Mar 2026
251 Barneveld AvHigh Band Construction Incat&t modification of (e) wireless facility consisting of: r/r (3) antennas & (3) rrus; remove infantry power plant; rectifiers remove 3106 cabinet; relocate (12) batteries in new pp; add (1) vertiv pp w/(12) 50v converters; (1) rectifier convertor shelf; (13) 48v rectifiers; (6) 50amp dc breakers;
Details
Permit
202509115123
Status
issued
Filed
Sep 11, 2025
Permit issued
Mar 3, 2026
Declared cost
$80,300
Address
251 Barneveld Av

at&t modification of (e) wireless facility consisting of: r/r (3) antennas & (3) rrus; remove infantry power plant; rectifiers remove 3106 cabinet; relocate (12) batteries in new pp; add (1) vertiv pp w/(12) 50v converters; (1) rectifier convertor shelf; (13) 48v rectifiers; (6) 50amp dc breakers;

Open the permit page

$80,300
Sep 10, 2025Completed
final sign-off Dec 2025
800 Powell StMetropolitan Electrical Constructionat&t modification of an existing wireless facility consisting: relocate 2 antennas and add 2 air antennas within existing faux chimneys; remove 4 and install rrs (2); r/r 1 power plant; remove 7 rectificers, 6 50 am dc breakers; 4 25-30 amp, 3 15/20 amp dc breakers, 1 battery pack, 1 rack, install 1
Details
Permit
202509104959
Status
complete
Filed
Sep 10, 2025
Permit issued
Nov 18, 2025
Final sign-off
Dec 22, 2025
Declared cost
$72,000
Address
800 Powell St

at&t modification of an existing wireless facility consisting: relocate 2 antennas and add 2 air antennas within existing faux chimneys; remove 4 and install rrs (2); r/r 1 power plant; remove 7 rectificers, 6 50 am dc breakers; 4 25-30 amp, 3 15/20 amp dc breakers, 1 battery pack, 1 rack, install 1

Open the permit page

$72,000