Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 1799 19th Av | at&t modifcation of an (e) wireless facility consisting of: r/r 3 antennas from 2 sectors 6 total. remove 6 rru's & add 3 new rrus & 6 diplexers ; remove 1 dcpp & 9 rectifiers. install 1 omnion cab w/ 8 new rectifiers & 7 converters; n 50a & 15 a breakers; 200 amp breaker kit & upgrade batteryDetails
at&t modifcation of an (e) wireless facility consisting of: r/r 3 antennas from 2 sectors 6 total. remove 6 rru's & add 3 new rrus & 6 diplexers ; remove 1 dcpp & 9 rectifiers. install 1 omnion cab w/ 8 new rectifiers & 7 converters; n 50a & 15 a breakers; 200 amp breaker kit & upgrade battery | $80,322 | |
| May 23, 2022 | Completed final sign-off Nov 2022 | 1799 19th Av | Electric Tech Construction Inc | at&t modification of unmanned telecom facility consisting remove & replace 3 panel antennas behind stealth cupola; install 3 rrus'1 dc6 surge suppressor box; (2) 36 awg dc power trunks; rf safety signs; remove (12) 155 ah batteries; (8) 155 batteries from (e) dcpp cb; install 20 (n) 190 ah batteriesDetails
at&t modification of unmanned telecom facility consisting remove & replace 3 panel antennas behind stealth cupola; install 3 rrus'1 dc6 surge suppressor box; (2) 36 awg dc power trunks; rf safety signs; remove (12) 155 ah batteries; (8) 155 batteries from (e) dcpp cb; install 20 (n) 190 ah batteries | $55,000 |
| Sep 14, 2020 | Completed final sign-off Nov 2021 | 1799 19th Av | Ericsson Inc Dba E U S Inc | att modif:remove 12 e antennas,install 6 new antennas behind frp remove 3 3 rrus inbstall 3 n rrus, install other small equipment ,relocate e eqipoment for spacing within frp. remove 1 cabinet install 2 n cabinet, install 2 new cabinets,new batteriesDetails
att modif:remove 12 e antennas,install 6 new antennas behind frp remove 3 3 rrus inbstall 3 n rrus, install other small equipment ,relocate e eqipoment for spacing within frp. remove 1 cabinet install 2 n cabinet, install 2 new cabinets,new batteries | $18,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 1799 19th Av | Dynamite Sign Group Inc Dba Tnt Electric | add "oil change" directional signDetails
add "oil change" directional sign | $500 |
| Aug 23, 2019 | Never finaled issued Sep 2019, no final | 1799 19th Av | Dynamite Sign Group Inc Dba Tnt Electric | replace 2 identical wall signsDetails
replace 2 identical wall signs | $2,500 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 1799 19th Av | Dynamite Sign Group Inc Dba Tnt Electric | replace 1 directional ground sign "exit"Details
replace 1 directional ground sign "exit" | $200 |
| Aug 1, 2019 | Completed final sign-off Dec 2019 | 1799 19th Av | Market Contractors Ltd | revision to 201810153222, structurally reinforce the new opening for the 4th service bay.Details
revision to 201810153222, structurally reinforce the new opening for the 4th service bay. | $35,000 |
| Jul 24, 2019 | Completed final sign-off Dec 2019 | 1799 19th Av | Market Contractors Ltd | revision to pa 201810153222. change to restroom layoutDetails
revision to pa 201810153222. change to restroom layout | $14,000 |
| Jun 20, 2019 | Expired or cancelled cancelled Jan 2026 | 1799 19th Av | install new above ground storage tanks (11 new ast) for vehicle lubricants, install lubricant piping and air-operated pumps. existing buidling and exterior to remain as isDetails
install new above ground storage tanks (11 new ast) for vehicle lubricants, install lubricant piping and air-operated pumps. existing buidling and exterior to remain as is | $12,400 | |
| Oct 15, 2018 | Completed final sign-off Dec 2019 | 1799 19th Av | Market Contractors Ltd | remodel lobby creating office, storage, changing room & making restrooms code compliant & updating accessible parking. minor exterior alteration by opening 4th service bay that was pre-designed on the original permitDetails
remodel lobby creating office, storage, changing room & making restrooms code compliant & updating accessible parking. minor exterior alteration by opening 4th service bay that was pre-designed on the original permit | $65,000 |
| May 18, 2018 | Completed final sign-off Apr 2019 | 1799 19th Av | Electric Tech Construction Inc | at&t wireless - swap 9 antennas, install 12 rrus to stall battery cabinet & 1 string batteries, install purcell cabinet. remove 2 gsm cabinets. remove 6 7/8" coaxDetails
at&t wireless - swap 9 antennas, install 12 rrus to stall battery cabinet & 1 string batteries, install purcell cabinet. remove 2 gsm cabinets. remove 6 7/8" coax | $15,000 |
| Oct 28, 2013 | Completed final sign-off Jul 2014 | 1799 19th Av | Nu Rev Communications Inc. | modifications to (e) at & t unmanned telecommunication facility consisting of installing 3 new rrus-11's, new fiber & dc power cables. no new batteries are proposedDetails
modifications to (e) at & t unmanned telecommunication facility consisting of installing 3 new rrus-11's, new fiber & dc power cables. no new batteries are proposed | $7,000 |
| May 4, 2011 | Completed final sign-off Mar 2012 | 1799 19th Av | Triton Tower Inc | modification of an at-t wireless telecommunication facility consisting of removing existing microfacility and installation of 12 panel antennas and associated equipment cabinets.Details
modification of an at-t wireless telecommunication facility consisting of removing existing microfacility and installation of 12 panel antennas and associated equipment cabinets. | $125,000 |
| Mar 30, 2009 | Completed final sign-off Nov 2009 | 1799 19th Av | Capital Tower & Communications | remove and replace (e) ericsson 3303 cabinet with a (n) ericsson 3303 cabinet with a (n) ericsson 3518 cabinet and 2-remote radio units (rru's)Details
remove and replace (e) ericsson 3303 cabinet with a (n) ericsson 3303 cabinet with a (n) ericsson 3518 cabinet and 2-remote radio units (rru's) | $5,000 |
| Jan 25, 2002 | Completed final sign-off Mar 2002 | 1799 19th Av | provide 1-hr roof on cmu wall over trash encloser.Details
provide 1-hr roof on cmu wall over trash encloser. | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dynamite Sign Group Inc Dba Tnt Electric (3), Market Contractors Ltd (3), Electric Tech Construction Inc (2), Capital Tower & Communications, Ericsson Inc Dba E U S Inc, Nu Rev Communications Inc., Triton Tower Inc
- Architects
- Janice Bier (2)
- Engineers
- Adam Amortnont, James Spore, John Anderson, Mark Quakenbush, Zahra Gerami