15 permits since 2000 (engineer on 13 permits, architect on 2 permits): 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2023 | Expired or cancelled cancelled Jan 2026 | 2350 Turk Bl | at&t mod of an unmanned telcom facility consisting of: rr 7 antennas,remove 9 rrus, install 3ruus,relocated sector c half domes,mounts to n location, r&r dc box,squid, install n power trunks & fiber trunks, n 12"cable tray & 1 n h-frame, install n rf safety signs, barricades & stripping on roof.Details
at&t mod of an unmanned telcom facility consisting of: rr 7 antennas,remove 9 rrus, install 3ruus,relocated sector c half domes,mounts to n location, r&r dc box,squid, install n power trunks & fiber trunks, n 12"cable tray & 1 n h-frame, install n rf safety signs, barricades & stripping on roof. | $65,000 | |
| Jan 26, 2023 | Completed final sign-off Dec 2023 | 800 Powell St | Metropolitan Electrical Construction | at&t modifications of an unmanned telecom facility consisting of remove & replace (4)(e) antennas; remove & replace (6)(e) frp vents/chimneys; remove (2)(e) rru's; remove (2) existing duw from existing racks; install (1) rectifier + (1) 6648 baseband in existinf dcpp + racks, new rf stripping + signDetails
at&t modifications of an unmanned telecom facility consisting of remove & replace (4)(e) antennas; remove & replace (6)(e) frp vents/chimneys; remove (2)(e) rru's; remove (2) existing duw from existing racks; install (1) rectifier + (1) 6648 baseband in existinf dcpp + racks, new rf stripping + sign | $65,000 |
| Dec 7, 2022 | Completed final sign-off Sep 2023 | 3682 18th St | Metropolitan Electrical Construction | at&t modifcation of an unmanned telecom facility, consisiting of remove & replace 6-antenas, 6-radomes, remove 8-rru's and add 2-rru's, rf safety signs, stripping on roof, new 2x6 wood beam sistered to e 2x6 at antena location, install 1-6648 in existing rackDetails
at&t modifcation of an unmanned telecom facility, consisiting of remove & replace 6-antenas, 6-radomes, remove 8-rru's and add 2-rru's, rf safety signs, stripping on roof, new 2x6 wood beam sistered to e 2x6 at antena location, install 1-6648 in existing rack | $45,000 |
| Sep 29, 2022 | Completed final sign-off Mar 2023 | 2440 16th St | Metropolitan Electrical Construction | at&t modif of unmanned telecom, remove/replace (6) antennas, remove (6) tma's, install new rf safety signage, r/r (12) batteries (leudacid) w/in(e) cabinet, r/r cabling w/in sector a cable tray, install (1) rectifier w/in(e) dccp, install (1) new 6648 baseband in (1) new f/x 21 cabinetDetails
at&t modif of unmanned telecom, remove/replace (6) antennas, remove (6) tma's, install new rf safety signage, r/r (12) batteries (leudacid) w/in(e) cabinet, r/r cabling w/in sector a cable tray, install (1) rectifier w/in(e) dccp, install (1) new 6648 baseband in (1) new f/x 21 cabinet | $55,000 |
| Aug 18, 2022 | Completed final sign-off Mar 2023 | 2001 Sacramento St | Electric Tech Construction Inc | a t and t modfications of unmanned telecom facility consisting of remove 5 antennas, 6 new antenna behind frp screen and extension, remove 3 and install 6 new rrus,6 diplexers, 2 dc9 box, rf safety signs, barricades, stripping on rooftop. remove 12 batteries and install 12 new 190 ah acid basedDetails
a t and t modfications of unmanned telecom facility consisting of remove 5 antennas, 6 new antenna behind frp screen and extension, remove 3 and install 6 new rrus,6 diplexers, 2 dc9 box, rf safety signs, barricades, stripping on rooftop. remove 12 batteries and install 12 new 190 ah acid based | $65,000 |
| Jul 28, 2022 | Completed final sign-off Dec 2022 | 1701 Jerrold Av | Electric Tech Construction Inc | att modification unmanned telecom facility: replace 6 antennas, remove 9 rrus, 6 new rrus, 6 diplexers, new rf safety signs striping rooftop. 1 6648 baseband unit max in e rackDetails
att modification unmanned telecom facility: replace 6 antennas, remove 9 rrus, 6 new rrus, 6 diplexers, new rf safety signs striping rooftop. 1 6648 baseband unit max in e rack | $45,000 |
| Jul 28, 2022 | Completed final sign-off May 2023 | 333 Baker St | Metropolitan Electrical Construction | att modification unmanned telecom facility rr 6 panel antennas behind e frp screen, remove 4 rrus, new 2 rrus,2 dc 9 box, 2 awg power trunks, 1 1/4"fiber trunk, rf safety sign, barricades, striping roof, r/r 20 batteries in e racks,1 dc 12 rm, 1 6648 and 1 6630 in e racksDetails
att modification unmanned telecom facility rr 6 panel antennas behind e frp screen, remove 4 rrus, new 2 rrus,2 dc 9 box, 2 awg power trunks, 1 1/4"fiber trunk, rf safety sign, barricades, striping roof, r/r 20 batteries in e racks,1 dc 12 rm, 1 6648 and 1 6630 in e racks | $65,000 |
| Jul 28, 2022 | Completed final sign-off Apr 2023 | 2242 Polk St | Electric Tech Construction Inc | a t and t modification of unmanned telecom facility consisting of rr 3 antennas relocate 2 antennas, rr 4 radomes add 3 new. remove 6 rrus and add rf safety signss, barricades, striping on rooftop. instal 4 rectifiers e e dcpp,1 6648 baseband unit i e purcell cabinet, remove existing duwDetails
a t and t modification of unmanned telecom facility consisting of rr 3 antennas relocate 2 antennas, rr 4 radomes add 3 new. remove 6 rrus and add rf safety signss, barricades, striping on rooftop. instal 4 rectifiers e e dcpp,1 6648 baseband unit i e purcell cabinet, remove existing duw | $75,000 |
| Jun 9, 2022 | Completed final sign-off Jan 2023 | 899 Hyde St | High Band Construction Inc | att modification of an (e) unmanned telecom facility, remove + replace (6) panel antennas mounted behind (e) frp extension + 3'7" extension. remove + replace (3) pipe masts. install new rf safety signs, barricades + stripping at rooftop.Details
att modification of an (e) unmanned telecom facility, remove + replace (6) panel antennas mounted behind (e) frp extension + 3'7" extension. remove + replace (3) pipe masts. install new rf safety signs, barricades + stripping at rooftop. | $35,000 |
| May 23, 2022 | Completed final sign-off Nov 2022 | 1799 19th Av | Electric Tech Construction Inc | at&t modification of unmanned telecom facility consisting remove & replace 3 panel antennas behind stealth cupola; install 3 rrus'1 dc6 surge suppressor box; (2) 36 awg dc power trunks; rf safety signs; remove (12) 155 ah batteries; (8) 155 batteries from (e) dcpp cb; install 20 (n) 190 ah batteriesDetails
at&t modification of unmanned telecom facility consisting remove & replace 3 panel antennas behind stealth cupola; install 3 rrus'1 dc6 surge suppressor box; (2) 36 awg dc power trunks; rf safety signs; remove (12) 155 ah batteries; (8) 155 batteries from (e) dcpp cb; install 20 (n) 190 ah batteries | $55,000 |
| May 12, 2022 | Completed final sign-off Feb 2023 | 1300 26th Av | Lemcon | remove panel antennas 6 total, remove rrus 3 total, remove rruw 3 tottal, relocate 2 panel antennas, install 6 new panel antennas, install 3 new rrus, install 3 tma, install 6 new diplex, install new safety signs and barrcader, install 4 new rect, fiers, install 1 new baseboard.Details
remove panel antennas 6 total, remove rrus 3 total, remove rruw 3 tottal, relocate 2 panel antennas, install 6 new panel antennas, install 3 new rrus, install 3 tma, install 6 new diplex, install new safety signs and barrcader, install 4 new rect, fiers, install 1 new baseboard. | $45,000 |
| May 4, 2022 | Completed final sign-off Jul 2024 | 795 Folsom St | Metropolitan Electrical Construction | r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinetsDetails
r/r (12)antennas, remove (12)rru, replace w/(8)new rru, install (8)13' pipemast @sector a/c; (4)10" pipe-clampset, new support steel kickers to (e)mount @sector c; r/r antenna mount frame see "c" only, rf safety signs, barricade/stripping on roof, remove (2)(e) 3206 cabinets | $55,000 |
| Apr 28, 2022 | Completed final sign-off Nov 2022 | 255 12th St | Metropolitan Electrical Construction | at&t mobility: r/r 4 panel antennas + radomes, 8 facade mounted. r/r 3 rrus. install 2 8" stand-offs at b+c, 3 (n) twinduplexers. 3 (n) dc9 boxes, & 3 #6awg power trunks. rf safety signs/ stripping at rooftop. 1 (n) dc 12 box on (e) frame + 1 (n) 6648 baseband in (e) purcell cabinet. paint.Details
at&t mobility: r/r 4 panel antennas + radomes, 8 facade mounted. r/r 3 rrus. install 2 8" stand-offs at b+c, 3 (n) twinduplexers. 3 (n) dc9 boxes, & 3 #6awg power trunks. rf safety signs/ stripping at rooftop. 1 (n) dc 12 box on (e) frame + 1 (n) 6648 baseband in (e) purcell cabinet. paint. | $75,000 |
| Apr 18, 2022 | Completed final sign-off Nov 2022 | 200 California St | Ericsson Inc Dba E U S Inc | at&t: modification to an (e) unmanned telecom facility: remove 4 antennas, add 5 (n) antennas. install 3 dc9 box, 3 (n) dc power trunk. remove & replace 16 batteries. install 1 (n) rectifier in (e) dc power plant. 1 (n) 6698 bbu in (e) purcell cabinet. (n) rf safety signs, barricades, stripping.Details
at&t: modification to an (e) unmanned telecom facility: remove 4 antennas, add 5 (n) antennas. install 3 dc9 box, 3 (n) dc power trunk. remove & replace 16 batteries. install 1 (n) rectifier in (e) dc power plant. 1 (n) 6698 bbu in (e) purcell cabinet. (n) rf safety signs, barricades, stripping. | $45,000 |
| Mar 24, 2022 | Completed final sign-off Apr 2024 | 1881 Post St | Invertice Inc | at&t: modification of unmanned telecom facility consisting: remove & replace 6 antennas. (n) rf safety signs on roof. remove (e) 2v battery system. install 1 (n) 6648 baseband unit in (e) rack. 1 (n) converter & 1 (n) rectifier in (e) power plant. install 20 (n) batteries in 1 (n) battery rack.Details
at&t: modification of unmanned telecom facility consisting: remove & replace 6 antennas. (n) rf safety signs on roof. remove (e) 2v battery system. install 1 (n) 6648 baseband unit in (e) rack. 1 (n) converter & 1 (n) rectifier in (e) power plant. install 20 (n) batteries in 1 (n) battery rack. | $65,000 |