Block 1206, lot 003
333 Baker St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 6
- Units
- 158
- Rooms
- 160 bathrooms
- Building
- 148,044 sq ft
- Lot
- 75,168 sq ft
- Zoning
- RM1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
36 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 7, 2026 | In progress filed Oct 2026, not yet issued | 333 Baker St | ground floor: renovation of lobby & 3 offices and add 1 storage room, work to occur within existing footprint. all work on ground floor.Details
ground floor: renovation of lobby & 3 offices and add 1 storage room, work to occur within existing footprint. all work on ground floor. | $123,000 | |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 333 Baker St | verizon: install 7 (n) antennas, remove 6 (e) rrvs, install 3 (n) rrvs, no (n) batteries required.Details
verizon: install 7 (n) antennas, remove 6 (e) rrvs, install 3 (n) rrvs, no (n) batteries required. | $115,000 | |
| Nov 3, 2025 | In progress issued Nov 2025 | 333 Baker St | Carbon Zero Buildings Inc | revision to permit 202506068146 to clarify new disconnect switch.Details
revision to permit 202506068146 to clarify new disconnect switch. | |
| Sep 12, 2025 | Completed final sign-off Dec 2025 | 333 Baker St | United Systems Fire And Security Llc | to verify existing sound levels in sleeping areas complying with sffc section 1103, 7.6.1Details
to verify existing sound levels in sleeping areas complying with sffc section 1103, 7.6.1 | |
| Jun 6, 2025 | In progress issued Jul 2025 | 333 Baker St | Carbon Zero Buildings Inc | remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical workDetails
remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical work | $175,000 |
| Dec 12, 2024 | In progress issued Apr 2025 | 333 Baker St | Tristrux Llc Dba Tristrux Construction | verizon project: install (4) new antennas and (4) new wall mounts on an (e) verizon facilityDetails
verizon project: install (4) new antennas and (4) new wall mounts on an (e) verizon facility | $45,000 |
| Sep 6, 2023 | Completed final sign-off Dec 2023 | 333 Baker St | All Seasons North Roofing And Waterproof | reroofingDetails
reroofing | $9,800 |
| Jul 28, 2022 | Completed final sign-off May 2023 | 333 Baker St | Metropolitan Electrical Construction | att modification unmanned telecom facility rr 6 panel antennas behind e frp screen, remove 4 rrus, new 2 rrus,2 dc 9 box, 2 awg power trunks, 1 1/4"fiber trunk, rf safety sign, barricades, striping roof, r/r 20 batteries in e racks,1 dc 12 rm, 1 6648 and 1 6630 in e racksDetails
att modification unmanned telecom facility rr 6 panel antennas behind e frp screen, remove 4 rrus, new 2 rrus,2 dc 9 box, 2 awg power trunks, 1 1/4"fiber trunk, rf safety sign, barricades, striping roof, r/r 20 batteries in e racks,1 dc 12 rm, 1 6648 and 1 6630 in e racks | $65,000 |
| Nov 3, 2021 | Completed final sign-off Jun 2022 | 333 Baker St | Yupana Inc | verizon wireless modification. replace 6 antennas, replace 6 rrus, rerplace 3 ovps, remove 3 diplexters, install 3 combiners. at equip: remove 12 rrus, replace 3 ovpsDetails
verizon wireless modification. replace 6 antennas, replace 6 rrus, rerplace 3 ovps, remove 3 diplexters, install 3 combiners. at equip: remove 12 rrus, replace 3 ovps | $69,500 |
| Apr 14, 2021 | Never finaled issued Jul 2021, no final | 333 Baker St | Casillas Clark Perez (Ccp) Painting Inc | concrete brick repairs at basement level. no change in existing lateral system. 100% affordable housing. (structural only)Details
concrete brick repairs at basement level. no change in existing lateral system. 100% affordable housing. (structural only) | $150,000 |
| Dec 9, 2020 | Never finaled issued Jan 2021, no final | 333 Baker St | Siemens Industry, Inc. | fire alarm addition of 1 module to monitor generator status on floor 1; ref permit app # 2017 0518 6955Details
fire alarm addition of 1 module to monitor generator status on floor 1; ref permit app # 2017 0518 6955 | $550 |
| Jul 21, 2020 | Never finaled issued Jul 2020, no final | 333 Baker St | street space | ||
| Oct 30, 2018 | Completed final sign-off Jul 2019 | 333 Baker St | Metropolitan Electrical Construction | att modification. remove and replace 7 (e) antennas w/ 7 (n). remove and replace 3 (e) rru's w/ 3, install 4 (n) rru's, install other small equip, remove unused equip, install (n) batteriesDetails
att modification. remove and replace 7 (e) antennas w/ 7 (n). remove and replace 3 (e) rru's w/ 3, install 4 (n) rru's, install other small equip, remove unused equip, install (n) batteries | $36,000 |
| Dec 6, 2017 | Expired or cancelled withdrawn Oct 2021 | 333 Baker St | swap (3) rrvs, install (3) rrus, install (1) idl cable & install (2) xmu units & (2) dus-41 inside existing 19" rackDetails
swap (3) rrvs, install (3) rrus, install (1) idl cable & install (2) xmu units & (2) dus-41 inside existing 19" rack | $15,000 | |
| May 18, 2017 | Completed final sign-off May 2021 | 333 Baker St | Got Power Inc Dba C D & Power | generator & concrete pad replacement. no new electrical loads.Details
generator & concrete pad replacement. no new electrical loads. | $60,000 |
| Nov 30, 2016 | Completed final sign-off Dec 2016 | 333 Baker St | Interstate Restoration California Lp | unit 406 - repair approx 320 ft. drywall using type x 5/8. install insulation, toilet, vanity. unit 405 - repair approx. 160 sq. ft. drywall using tuype x 5/8. install insulation, toilet, vanity. unit 306 - repair approx 160 sq. ft. drywall using type x 5/8.Details
unit 406 - repair approx 320 ft. drywall using type x 5/8. install insulation, toilet, vanity. unit 405 - repair approx. 160 sq. ft. drywall using tuype x 5/8. install insulation, toilet, vanity. unit 306 - repair approx 160 sq. ft. drywall using type x 5/8. | $25,000 |
| Oct 13, 2015 | Never finaled issued Oct 2015, no final | 333 Baker St | Golden Bay Roofing Inc | re-roofing | $28,000 |
| Sep 30, 2015 | Completed final sign-off Mar 2017 | 333 Baker St | Metropolitan Electrical Construction | at&t modification to (e) telecom facility: install (3) (n) rrus-11 with a2, install (3)rrus-32, (n) dus-41 & xmu inside 19" rack, install blinders between sector b antennas and reducing standoff on all antenna mounts, r/r (9) (e) antennas with (9)(n) antennas, remove all unused coax.Details
at&t modification to (e) telecom facility: install (3) (n) rrus-11 with a2, install (3)rrus-32, (n) dus-41 & xmu inside 19" rack, install blinders between sector b antennas and reducing standoff on all antenna mounts, r/r (9) (e) antennas with (9)(n) antennas, remove all unused coax. | $25,000 |
| Jun 8, 2015 | Completed final sign-off Feb 2016 | 333 Baker St | Ridge Communications Inc | verizon wireless replace 6 antennas (panel), 3 remote radio units, replace 3 remote radio units, add 2 surge protectors, 2 hybrid cables, 3 diplexers at equip area, remove ret cable, remove unused coax cableDetails
verizon wireless replace 6 antennas (panel), 3 remote radio units, replace 3 remote radio units, add 2 surge protectors, 2 hybrid cables, 3 diplexers at equip area, remove ret cable, remove unused coax cable | $10,000 |
| Nov 25, 2014 | Never finaled issued Dec 2014, no final | 333 Baker St | Siemens Industry, Inc. | fire alarm work for the upgrade to the elevator machine rooms on the basement and roof levels. additions are 2 smoke detectors, 6 heat detectors, 8 modules. referenced f/a panel replacement 2014.1007.8235Details
fire alarm work for the upgrade to the elevator machine rooms on the basement and roof levels. additions are 2 smoke detectors, 6 heat detectors, 8 modules. referenced f/a panel replacement 2014.1007.8235 | $8,000 |
| Oct 7, 2014 | Never finaled issued Dec 2014, no final | 333 Baker St | Siemens Industry, Inc. | fire alarm voluntary panel replacement for mercy housing apartment building, additions are new fire alarm panel, 1 horn strobe power supply, 28 smoke detectors, 12 input modules and 3 relay modules.Details
fire alarm voluntary panel replacement for mercy housing apartment building, additions are new fire alarm panel, 1 horn strobe power supply, 28 smoke detectors, 12 input modules and 3 relay modules. | $14,000 |
| May 9, 2014 | Expired or cancelled cancelled Jul 2015 | 333 Baker St | install unmanned t-mobile wireless telecommunications facility consisting of 6 antennas concealed inside faux vents, gps antenna, 4 equipment cabinets, 1-bbu.Details
install unmanned t-mobile wireless telecommunications facility consisting of 6 antennas concealed inside faux vents, gps antenna, 4 equipment cabinets, 1-bbu. | $90,000 | |
| Nov 5, 2013 | Expired or cancelled withdrawn Jun 2015 | 333 Baker St | a modification to an existing at&t telecommunication facility consisting of adding three new prus-11'sDetails
a modification to an existing at&t telecommunication facility consisting of adding three new prus-11's | $6,000 | |
| Sep 25, 2013 | Completed final sign-off Aug 2015 | 333 Baker St | Stc Netcom Inc. | replace 3 verizon panel antenna with new panel antennas. add 3 rrh units, 1 dypleyer &1 cable.Details
replace 3 verizon panel antenna with new panel antennas. add 3 rrh units, 1 dypleyer &1 cable. | $10,000 |
| Mar 26, 2013 | Never finaled issued Mar 2013, no final | 333 Baker St | Golden Bay Roofing Inc | reroofing | $64,000 |
| Feb 11, 2013 | Completed final sign-off Nov 2013 | 333 Baker St | Sun Light & Power | install roof mounted solar hot water systemDetails
install roof mounted solar hot water system | $78,000 |
| Aug 8, 2012 | Expired or cancelled withdrawn Feb 2016 | 333 Baker St | adding a new 6601 rbs main unit to an existing 19" rack & three new remote radio units. no other scope of work.Details
adding a new 6601 rbs main unit to an existing 19" rack & three new remote radio units. no other scope of work. | $15,000 | |
| Mar 21, 2012 | Never finaled issued Mar 2012, no final | 333 Baker St | street space & sidewalk | ||
| Oct 24, 2011 | Never finaled issued Oct 2011, no final | 333 Baker St | street space | ||
| Aug 26, 2011 | Completed final sign-off Sep 2012 | 333 Baker St | project consists of verizon wireless outdoor equipment cabinets mounted on raised platform on concrete slab at basement level within chain link fance enclosure. install 6 panel antennas on penthouse behind screens. install stand-by generator mounted on concrete slab @ grade within. cmu enclosure.Details
project consists of verizon wireless outdoor equipment cabinets mounted on raised platform on concrete slab at basement level within chain link fance enclosure. install 6 panel antennas on penthouse behind screens. install stand-by generator mounted on concrete slab @ grade within. cmu enclosure. | $180,000 | |
| Jul 18, 2011 | Never finaled issued Jul 2011, no final | 333 Baker St | street space & sidewalk | ||
| Mar 15, 2010 | Expired or cancelled cancelled Jul 2011 | 333 Baker St | Pinnacle Wireless Usa Inc. | modification of (e) unnamed telecomunication facility consisting of add new 3418 rbs cabinet in (e) equipment rack. remove & replace 3 (e) antenna with 3 new antenna's. paint to match (e) building. add 3 new rrv's (remote radio units). paint to match (e) building & new runs of fiber inside new 1 1/4Details
modification of (e) unnamed telecomunication facility consisting of add new 3418 rbs cabinet in (e) equipment rack. remove & replace 3 (e) antenna with 3 new antenna's. paint to match (e) building. add 3 new rrv's (remote radio units). paint to match (e) building & new runs of fiber inside new 1 1/4 | $35,000 |
| Nov 17, 2009 | Never finaled issued Nov 2009, no final | 333 Baker St | street space and sidewalk repair | ||
| Apr 20, 2009 | Expired or cancelled expired Jan 2011 | 333 Baker St | Cba Site Services Inc. | modification to (e) unmanned telecom facility consisting of adding 6 new tma's (tower mounted amplifiers), new rets (remote electronic tilts) & 2 new runs of coax to sector c & remove (e) tdma cabinetDetails
modification to (e) unmanned telecom facility consisting of adding 6 new tma's (tower mounted amplifiers), new rets (remote electronic tilts) & 2 new runs of coax to sector c & remove (e) tdma cabinet | $5,000 |
| Oct 1, 2003 | Never finaled issued Oct 2003, no final | 333 Baker St | street space | ||
| Jun 20, 2003 | Never finaled issued Jun 2003, no final | 333 Baker St | street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Metropolitan Electrical Construction (3), Siemens Industry, Inc. (3), Carbon Zero Buildings Inc (2), Golden Bay Roofing Inc (2), All Seasons North Roofing And Waterproof, Casillas Clark Perez (Ccp) Painting Inc, Cba Site Services Inc., Got Power Inc Dba C D & Power, Interstate Restoration California Lp, Pinnacle Wireless Usa Inc., Ridge Communications Inc, Stc Netcom Inc., Sun Light & Power, Tristrux Llc Dba Tristrux Construction, United Systems Fire And Security Llc, Yupana Inc
- Architects
- Beverly Choe, Gerald Wilhelm, Glen Hunt, Glen Hunt, Jeffrey Rome, Michale Shewbridge
- Engineers
- James Spore (3), Gregory Michael Dillett, Ii (2), Alam Syed, Ben Au, John Anderson Jr., Lisa Gurney, Narsumha Tanikella, Steven Terry, Streamline Engineering, Zahra Gerami