Alam Syed
- License
- M27087
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M27087 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jan 2025 to Dec 2025
3 permits since 2000 (engineer on 3 permits): 1 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Carbon Zero Buildings Inc (3)
- Engineers
- Gregory Michael Dillett, Ii, Narsumha Tanikella
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2025 | Completed final sign-off Feb 2026 | 871 Turk St | Carbon Zero Buildings Inc | revision to pa #202410183281: revised mechanical t24 page & elimnate uneccsary special inspection. to remove the nrca-mch-08, nrca-mch-09, and nrca-mch-10 itemsDetails
revision to pa #202410183281: revised mechanical t24 page & elimnate uneccsary special inspection. to remove the nrca-mch-08, nrca-mch-09, and nrca-mch-10 items | |
| Jun 6, 2025 | In progress issued Jul 2025 | 333 Baker St | Carbon Zero Buildings Inc | remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical workDetails
remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical work | $175,000 |
| Jan 10, 2025 | In progress issued Jan 2025 | 54 Mcallister St | Carbon Zero Buildings Inc | upgrade to plumbing system (heat pumps & buffer tanks) and associated electrical work at roof topDetails
upgrade to plumbing system (heat pumps & buffer tanks) and associated electrical work at roof top | $125,000 |