Block 0349, lot 014
54 Mcallister St
- City’s use
- Multi-Family Residential
- Built
- 1986
- Stories
- 13
- Units
- 100
- Rooms
- 75 bedrooms, 100 bathrooms
- Building
- 74,693 sq ft
- Lot
- 21,015 sq ft
- Zoning
- RC4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2025 | In progress issued Apr 2025 | 54 Mcallister St | Carbon Zero Buildings Inc | revision to pa # 2025-0110-8130 revision to remove the step up/ step down transformer, add new conductor, new exterior cable and remove upgraded panelDetails
revision to pa # 2025-0110-8130 revision to remove the step up/ step down transformer, add new conductor, new exterior cable and remove upgraded panel | |
| Jan 10, 2025 | In progress issued Jan 2025 | 54 Mcallister St | Carbon Zero Buildings Inc | upgrade to plumbing system (heat pumps & buffer tanks) and associated electrical work at roof topDetails
upgrade to plumbing system (heat pumps & buffer tanks) and associated electrical work at roof top | $125,000 |
| Mar 1, 2024 | Completed final sign-off Nov 2025 | 54 Mcallister St | United Systems Fire And Security Llc | decibels testing onlyDetails
decibels testing only | $795 |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 54 Mcallister St | Bbi - Con Inc, Emkjer Enterprises Inc Dba Sign Co Usa | evacuation maps (17 + 9 typical = 26)Details
evacuation maps (17 + 9 typical = 26) | $3,000 |
| Apr 22, 2019 | Never finaled issued Apr 2019, no final | 54 Mcallister St | street spaceDetails
street space | ||
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 54 Mcallister St | street spaceDetails
street space | ||
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 54 Mcallister St | Battalion One Fire Protection | installation of fire alarm system w/new control panel, radio comm, smoke detector & pull stations at every exit, low freq horn in all units, monitor modules to monitor flow & tamper, relay modules for elev. recall & fsd close down. ref #201710110912, pm20180809847Details
installation of fire alarm system w/new control panel, radio comm, smoke detector & pull stations at every exit, low freq horn in all units, monitor modules to monitor flow & tamper, relay modules for elev. recall & fsd close down. ref #201710110912, pm20180809847 | $85,000 |
| Dec 19, 2018 | Completed final sign-off Jan 2019 | 54 Mcallister St | test bldg for emergency responder radio coverage. the bldg passed testing. no physical work done under this permit.Details
test bldg for emergency responder radio coverage. the bldg passed testing. no physical work done under this permit. | ||
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 54 Mcallister St | street space w/mtaDetails
street space w/mta | ||
| Aug 1, 2018 | Never finaled issued Aug 2018, no final | 54 Mcallister St | street spaceDetails
street space | ||
| Nov 20, 2017 | Never finaled issued Nov 2017, no final | 54 Mcallister St | Advanced Roof Design Inc | reroofing.Details
reroofing. | $122,471 |
| Oct 11, 2017 | Completed final sign-off Feb 2020 | 54 Mcallister St | Bbi - Con Inc | renovation of 10 units to achieve ada compliance. upgdate casework and appliances for select units. renovation of exterior courtyard to achieve ada compliance, replace windows, renovation of gr fl warm up kitchen, update common corridors 2-8. add 2 roof mech units.Details
renovation of 10 units to achieve ada compliance. upgdate casework and appliances for select units. renovation of exterior courtyard to achieve ada compliance, replace windows, renovation of gr fl warm up kitchen, update common corridors 2-8. add 2 roof mech units. | $14,500,000 |
| Sep 29, 2017 | Completed final sign-off Oct 2017 | 54 Mcallister St | New Century Remodeling & Construction In | apt 603 - replace kitchen cabinets (no new appliances) provide wiring method for kitchen hood fan connections, provide gfci & tamper resistant receptacles.Details
apt 603 - replace kitchen cabinets (no new appliances) provide wiring method for kitchen hood fan connections, provide gfci & tamper resistant receptacles. | $10,000 |
| Sep 1, 2017 | Completed final sign-off Sep 2017 | 54 Mcallister St | New Century Remodeling & Construction In | apt#802, 308 - replace kitchen cabinets (no new appliances), provide wiring mehtod for kitchen hood, fan connections, provide gfci and tamper resistance receptabclesDetails
apt#802, 308 - replace kitchen cabinets (no new appliances), provide wiring mehtod for kitchen hood, fan connections, provide gfci and tamper resistance receptabcles | $10,000 |
| May 5, 2017 | Completed final sign-off Aug 2017 | 54 Mcallister St | Bens Roofing Inc | reroofingDetails
reroofing | $24,500 |
| Nov 4, 2016 | Completed final sign-off Mar 2017 | 54 Mcallister St | New Century Remodeling & Construction In | 17 units: unit numbers: 209,302,413,507,508,605,610,615,702,703, 704,705,707,710, 801,804,809 - replace kitchen cabinets & partial counter. no new appliances, provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apts #209, 302,413,507,508,605,Details
17 units: unit numbers: 209,302,413,507,508,605,610,615,702,703, 704,705,707,710, 801,804,809 - replace kitchen cabinets & partial counter. no new appliances, provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apts #209, 302,413,507,508,605, | $170,000 |
| Sep 30, 2016 | Completed final sign-off Oct 2016 | 54 Mcallister St | New Century Remodeling & Construction In | unit #602: replace kitchen cabinets (no new appliances). provde wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apt # 602. (no structural work).Details
unit #602: replace kitchen cabinets (no new appliances). provde wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apt # 602. (no structural work). | $10,000 |
| Sep 1, 2016 | Completed final sign-off Sep 2016 | 54 Mcallister St | New Century Remodeling & Construction In | replace kitchen cabinets (no new appliances), provide wiring method for kitchen hood fan connections. provide gfci and tamper resistant receptacles in apt. #506. no structural work - no wall modification.Details
replace kitchen cabinets (no new appliances), provide wiring method for kitchen hood fan connections. provide gfci and tamper resistant receptacles in apt. #506. no structural work - no wall modification. | $10,000 |
| Jul 13, 2016 | Completed final sign-off Jul 2016 | 54 Mcallister St | New Century Remodeling & Construction In | unit #315: replace kitchen cabinets (no new appliances),provide wiring method for kitchen hood fan connections,provide gfci &tamper resistant receptacles,no lighting change,no chagne in openings and layout.Details
unit #315: replace kitchen cabinets (no new appliances),provide wiring method for kitchen hood fan connections,provide gfci &tamper resistant receptacles,no lighting change,no chagne in openings and layout. | $10,000 |
| May 27, 2016 | Completed final sign-off Jun 2016 | 54 Mcallister St | New Century Remodeling & Construction In | apt 402: partial kitchen remodeling: replace kitchen cabinets, reuse (e) kitchen sink, no new appliances, provide wiring forkitchen hood fan corrections. provide gfci and tamper resistant receptacles. no lighting alteration.Details
apt 402: partial kitchen remodeling: replace kitchen cabinets, reuse (e) kitchen sink, no new appliances, provide wiring forkitchen hood fan corrections. provide gfci and tamper resistant receptacles. no lighting alteration. | $8,000 |
| Mar 17, 2016 | Completed final sign-off Mar 2016 | 54 Mcallister St | New Century Remodeling & Construction In | unit #206: partial kitchen remodel. replace kitchen cabinets. no new appliances. provide wiring method for kitchen hood fan connection, gfci and temper resistant receptacles. no lighting change. no change in wall and opening layout.Details
unit #206: partial kitchen remodel. replace kitchen cabinets. no new appliances. provide wiring method for kitchen hood fan connection, gfci and temper resistant receptacles. no lighting change. no change in wall and opening layout. | $15,000 |
| Mar 3, 2016 | Never finaled issued Mar 2016, no final | 54 Mcallister St | Xin Xin Construction | no. lite changes. replace kitchen cabinets, no new appliances. provide wiring method for kitchen hood, fan connection provide gfi and tanger resistant receptacles. #206. no changes to wall locations or removal of walls.Details
no. lite changes. replace kitchen cabinets, no new appliances. provide wiring method for kitchen hood, fan connection provide gfi and tanger resistant receptacles. #206. no changes to wall locations or removal of walls. | $5,000 |
| Dec 9, 2015 | Completed final sign-off Dec 2015 | 54 Mcallister St | New Century Remodeling & Construction In | replace kitchen cabinets, provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apt. #309 and apt. #408.Details
replace kitchen cabinets, provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apt. #309 and apt. #408. | $5,000 |
| Nov 12, 2015 | Completed final sign-off Dec 2015 | 54 Mcallister St | New Century Remodeling & Construction In | unit #214 & #807: replace kitchen cabinets(no new appliances), provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles. partial kitchen remodel for two kitchens.Details
unit #214 & #807: replace kitchen cabinets(no new appliances), provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles. partial kitchen remodel for two kitchens. | $15,000 |
| May 22, 2015 | Completed final sign-off Jun 2015 | 54 Mcallister St | New Century Remodeling & Construction In | work in unit #512, #612, #701: replace kitchen cabinets. no walls to be moved. all fire-rated assemblies to be maintained.Details
work in unit #512, #612, #701: replace kitchen cabinets. no walls to be moved. all fire-rated assemblies to be maintained. | $15,000 |
| Dec 8, 2014 | Completed final sign-off Jan 2015 | 54 Mcallister St | New Century Remodeling & Construction In | replace kitchen cabinets (new appliances), provide wiring method for kitchen hood dan connections, provide gfci and tamper resistant receptacles in apt. #306.Details
replace kitchen cabinets (new appliances), provide wiring method for kitchen hood dan connections, provide gfci and tamper resistant receptacles in apt. #306. | $15,000 |
| Sep 5, 2014 | Completed final sign-off Jan 2015 | 54 Mcallister St | New Century Remodeling & Construction In | replace kitchen cabinets and counter top (no new appliances), provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apt 312 & 314Details
replace kitchen cabinets and counter top (no new appliances), provide wiring method for kitchen hood fan connections, provide gfci and tamper resistant receptacles in apt 312 & 314 | $8,000 |
| Aug 6, 2014 | Completed final sign-off Jan 2015 | 54 Mcallister St | New Century Remodeling & Construction In | replace kitchen cabinets and counter top (no new appliances). provide approved wiring method for kitchen hood fan corrections. provide gfci and tamper resistant receptacles. #503, 504, 505, 509, 510, 511, 513, 514, 515, 516, 601, 604, 606, 607, 608, 609, 613. 614, 616, 706, 708, 709, 803, 805, 806.Details
replace kitchen cabinets and counter top (no new appliances). provide approved wiring method for kitchen hood fan corrections. provide gfci and tamper resistant receptacles. #503, 504, 505, 509, 510, 511, 513, 514, 515, 516, 601, 604, 606, 607, 608, 609, 613. 614, 616, 706, 708, 709, 803, 805, 806. | $180,000 |
| Jun 24, 2014 | Completed final sign-off Jul 2014 | 54 Mcallister St | New Century Remodeling & Construction In | unit 611: replace kitchen cabinets, counter top only, 8'x8' kitchenDetails
unit 611: replace kitchen cabinets, counter top only, 8'x8' kitchen | $2,200 |
| Feb 18, 2014 | Never finaled issued Feb 2014, no final | 54 Mcallister St | Citybest Construction | open wall to run low voltage wire for thermostat and install transformer (1 per unit, 100 total). patch walls to match existing.Details
open wall to run low voltage wire for thermostat and install transformer (1 per unit, 100 total). patch walls to match existing. | $4,800 |
| Oct 28, 2013 | Completed final sign-off Apr 2014 | 54 Mcallister St | Interstate Restoration California Lp | open walls in select area, in particular kitchens and bathrooms, to verify if electrical and plumbing is to code; what is not to code will be fixed. then we will patch the areas that were opened.Details
open walls in select area, in particular kitchens and bathrooms, to verify if electrical and plumbing is to code; what is not to code will be fixed. then we will patch the areas that were opened. | $60,000 |
| Oct 4, 2013 | Completed final sign-off Apr 2014 | 54 Mcallister St | Interstate Restoration California Lp | apt #404. electrical, plumbing, drywall, patching & repair.Details
apt #404. electrical, plumbing, drywall, patching & repair. | $17,000 |
| Mar 6, 2013 | Never finaled issued Mar 2013, no final | 54 Mcallister St | Ryan And Ryan Construction Inc | work in units 403, 404, 405: repair/replace drywall/dry rot in all units. remodel kitchens and bathrooms all units. rewire all units. no new walls. no new windows. in-kind repair.Details
work in units 403, 404, 405: repair/replace drywall/dry rot in all units. remodel kitchens and bathrooms all units. rewire all units. no new walls. no new windows. in-kind repair. | $90,000 |
| Sep 14, 2012 | Expired or cancelled cancelled Jan 2026 | 54 Mcallister St | Crime Watch Security Sys Llc | relocate 1 horn strobe due to tenant improvement.Details
relocate 1 horn strobe due to tenant improvement. | $100 |
| Feb 3, 2012 | Never finaled issued Feb 2012, no final | 54 Mcallister St | street space permitDetails
street space permit | ||
| Aug 4, 2011 | Completed final sign-off Oct 2012 | 54 Mcallister St | Amone Corp | dorothy day senior community. new reception desl and seating area, new private office, update toilets and drinking fountain. all work are at ground floor only (sprinkler and fire alarm separate perm)Details
dorothy day senior community. new reception desl and seating area, new private office, update toilets and drinking fountain. all work are at ground floor only (sprinkler and fire alarm separate perm) | $150,000 |
| Mar 13, 2008 | Never finaled issued Apr 2008, no final | 54 Mcallister St | B B J Electric, Inc | replacement of existing fire alarm system for entire bldg with new system.Details
replacement of existing fire alarm system for entire bldg with new system. | $95,000 |
| Feb 1, 2008 | Completed final sign-off Apr 2009 | 54 Mcallister St | John Steward Company | replacement of 17 countertops, installation of pnuematic trash door opener, seal and stripe parking lot, new steel fence and new bathroom exhust fan motors.Details
replacement of 17 countertops, installation of pnuematic trash door opener, seal and stripe parking lot, new steel fence and new bathroom exhust fan motors. | $450,000 |
| Jan 24, 2008 | Completed final sign-off Jul 2008 | 54 Mcallister St | Acker & Guerrero Roof Co | re-roofing.Details
re-roofing. | $89,779 |
| Feb 1, 2007 | Never finaled issued Feb 2007, no final | 70 Mcallister St | street space and sidewalk permitDetails
street space and sidewalk permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- New Century Remodeling & Construction In (15), Bbi - Con Inc (2), Carbon Zero Buildings Inc (2), Interstate Restoration California Lp (2), Acker & Guerrero Roof Co, Advanced Roof Design Inc, Amone Corp, B B J Electric, Inc, Battalion One Fire Protection, Bens Roofing Inc, Citybest Construction, Crime Watch Security Sys Llc, Emkjer Enterprises Inc Dba Sign Co Usa, John Steward Company, Ryan And Ryan Construction Inc, United Systems Fire And Security Llc, Xin Xin Construction
- Engineers
- Alam Syed, Gregory Michael Dillett, Ii
- Authorized agent-otherss
- Christophe Laverne
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.