Bbi - Con Inc
- Based in
- Oakland
- On San Francisco permits
- Feb 2016 to Jan 2024
- Last 24 months
- 0 permits filed
31 permits since 2000: 27 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2024 | In progress filed Jan 2024, not yet issued | 1527 Grant Av | revision to approved soft story permits 201809140185/1079. includes removing and replacing concrete sidewalk at public right of way and infilling 2 existing vaults under sidewalkDetails
revision to approved soft story permits 201809140185/1079. includes removing and replacing concrete sidewalk at public right of way and infilling 2 existing vaults under sidewalk | $50,000 |
| Jun 20, 2023 | Completed final sign-off Aug 2025 | 1000 Sutter St | revision to pa 2021-0913-8252 residential unit plumbing pipe replacement including plumbing fixtures. "no residential guest rooms will be removed or demolised or converted"Details
revision to pa 2021-0913-8252 residential unit plumbing pipe replacement including plumbing fixtures. "no residential guest rooms will be removed or demolised or converted" | $2,500,000 |
| May 31, 2023 | Completed final sign-off Dec 2023 | 777 Broadway | revision to 202010015613. exterior: structural repairs/framing, new replacement in kind windows as nail fin, plaster in kind replacement associated waterproofing. voluntary removal of solar thermal system fromDetails
revision to 202010015613. exterior: structural repairs/framing, new replacement in kind windows as nail fin, plaster in kind replacement associated waterproofing. voluntary removal of solar thermal system from | $1,000,000 |
| May 23, 2023 | Completed final sign-off Aug 2024 | 1527 Grant Av | revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed.Details
revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed. | $30,000 |
| Feb 7, 2023 | Completed final sign-off Aug 2025 | 1000 Sutter St | revision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofcDetails
revision to approved permit #202109138252. convert extg commercial grade kitchen to residential grade warming kitchen @ lobby level 1, community kitchen only include adjacent prop mgmt ofc | $30,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 102 South Park | revision to pa# 2019-1218-9903; fire escape (3) windows on west elevation & (3) on north elevation in kind/like original wood dbl-hung units with tempered glass due to historical preservation and steel window reduces window opening size.Details
revision to pa# 2019-1218-9903; fire escape (3) windows on west elevation & (3) on north elevation in kind/like original wood dbl-hung units with tempered glass due to historical preservation and steel window reduces window opening size. | |
| Sep 13, 2021 | Completed final sign-off Aug 2025 | 1000 Sutter St | 100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms.Details
100% (n) affordable housing, renovation of a 10-story (e) sro into housing for homeless & impacted by covid-19. elective/discretionary structural upgrades at basement foundations & exterior building envelope; renovate residential units; add/renovate offices, community room, laundry & restrooms. | $23,303,869 |
| May 17, 2021 | Completed final sign-off Mar 2022 | 22 South Park | revision to pa# 201912189908. sow: addition of power door operator in lieu of level landing due to (e) site conditions. (n) casework in unit 101. (n) utiliy sink at mep room. no other changes in this revision. no work in prow.Details
revision to pa# 201912189908. sow: addition of power door operator in lieu of level landing due to (e) site conditions. (n) casework in unit 101. (n) utiliy sink at mep room. no other changes in this revision. no work in prow. | $45,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2023 | 1204 Mason St | 100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use.Details
100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use. | $7,600,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2024 | 1527 Grant Av | 100% affordable 34 sro units full non.structural rehabscope includes: new paint, flooring, fixtures, lighting, hardware in common area and units. mep duct work.(n)retrofit windows on flrs 2&3. wood on grant side & clad on cadel place. exterior paint no work performed in the public right of way.Details
100% affordable 34 sro units full non.structural rehabscope includes: new paint, flooring, fixtures, lighting, hardware in common area and units. mep duct work.(n)retrofit windows on flrs 2&3. wood on grant side & clad on cadel place. exterior paint no work performed in the public right of way. | $5,800,000 |
| Oct 1, 2020 | Completed final sign-off Dec 2023 | 777 Broadway | rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use.Details
rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use. | $6,100,000 |
| Feb 12, 2020 | Completed final sign-off Apr 2022 | 106 South Park | exploratory demo to locate structural & utilites in advance of full demo. no more than 500 sq feet. areas of destructive testing repair and patch in kind. no distruption of guest rooms. for future build out 2019-1218-9921.Details
exploratory demo to locate structural & utilites in advance of full demo. no more than 500 sq feet. areas of destructive testing repair and patch in kind. no distruption of guest rooms. for future build out 2019-1218-9921. | $20,000 |
| Dec 18, 2019 | Completed final sign-off Sep 2023 | 102 South Park | rehab/renovaiton improvement for sro (n) interiors, kitchen, bath. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na.Details
rehab/renovaiton improvement for sro (n) interiors, kitchen, bath. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na. | $2,100,000 |
| Dec 18, 2019 | Completed final sign-off Sep 2023 | 106 South Park | mayors office 13-01.rehab/renovation improvement for sing room occupancy, new interiors, new mep,new stairs, interior walls.exterior replacements. doors, paint windows in kindDetails
mayors office 13-01.rehab/renovation improvement for sing room occupancy, new interiors, new mep,new stairs, interior walls.exterior replacements. doors, paint windows in kind | $3,100,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2022 | 22 South Park | rehab/renovaiton improvement to sro (n) interiors. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na.Details
rehab/renovaiton improvement to sro (n) interiors. new mep. fire alarm & sprinkler deferred. repair & replace roofing drains gutters, repair exterior paint in kind. maher na. | $2,100,000 |
| Nov 25, 2019 | Never finaled issued Nov 2019, no final | 54 Mcallister St | evacuation maps (17 + 9 typical = 26)Details
evacuation maps (17 + 9 typical = 26) | $3,000 |
| Aug 16, 2019 | Completed final sign-off Nov 2019 | 230 Eddy St | inkind repair of damaged 5'-long metal fire escape ladder at top and behind the parapet. repair in-kind ladder of (e) fire escape behind parapet to roof, approx 5 feet in length. repair does not change (e) egress, repair occurs behind southern parapetDetails
inkind repair of damaged 5'-long metal fire escape ladder at top and behind the parapet. repair in-kind ladder of (e) fire escape behind parapet to roof, approx 5 feet in length. repair does not change (e) egress, repair occurs behind southern parapet | $6,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2023 | 1527 Grant Av | (comemrcial). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4Details
(comemrcial). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4 | $70,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2022 | 1204 Mason St | commercial. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a.Details
commercial. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a. | $50,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2023 | 1527 Grant Av | (residential). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4Details
(residential). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4 | $140,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2022 | 1204 Mason St | residential. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a.Details
residential. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a. | $150,000 |
| Jan 2, 2018 | Completed final sign-off Jun 2018 | 990 Pacific Av | electrical, venting, and enclosure upgrdes to existing emergency generator, add fuel port and pipingDetails
electrical, venting, and enclosure upgrdes to existing emergency generator, add fuel port and piping | $30,000 |
| Nov 14, 2017 | Completed final sign-off Nov 2019 | 230 Eddy St | replacement of existing exterior stair landing with new, in-kind; stair & landing are required means of egress. n/a maherDetails
replacement of existing exterior stair landing with new, in-kind; stair & landing are required means of egress. n/a maher | $25,000 |
| Oct 27, 2017 | Expired or cancelled cancelled Nov 2018 | 230 Eddy St | voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance.Details
voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance. | $200,000 |
| Oct 11, 2017 | Completed final sign-off Feb 2020 | 54 Mcallister St | renovation of 10 units to achieve ada compliance. upgdate casework and appliances for select units. renovation of exterior courtyard to achieve ada compliance, replace windows, renovation of gr fl warm up kitchen, update common corridors 2-8. add 2 roof mech units.Details
renovation of 10 units to achieve ada compliance. upgdate casework and appliances for select units. renovation of exterior courtyard to achieve ada compliance, replace windows, renovation of gr fl warm up kitchen, update common corridors 2-8. add 2 roof mech units. | $14,500,000 |
| Sep 21, 2017 | Completed final sign-off Mar 2018 | 990 Pacific Av | emergency responder radio coverage systemDetails
emergency responder radio coverage system | $56,000 |
| Sep 18, 2017 | Expired or cancelled withdrawn Oct 2025 | 990 Pacific Av | demo (e) interior emergency generator and venting, install (n) exterior emergency generator. mohcd rad program priority permit.Details
demo (e) interior emergency generator and venting, install (n) exterior emergency generator. mohcd rad program priority permit. | $45,000 |
| Aug 1, 2017 | Completed final sign-off Sep 2017 | 990 Pacific Av | 1/f-7/f: signage, evacuation sign in cantonese on all 7 floors.Details
1/f-7/f: signage, evacuation sign in cantonese on all 7 floors. | $5,000 |
| May 23, 2017 | Completed final sign-off Feb 2018 | 990 Pacific Av | confirmation of occupant load at existing community room per sffd field inspector request. ref pa #201504012567/r1.Details
confirmation of occupant load at existing community room per sffd field inspector request. ref pa #201504012567/r1. | |
| May 8, 2017 | Completed final sign-off Sep 2017 | 990 Pacific Av | 30 evac maps all floorsDetails
30 evac maps all floors | $8,534 |
| Feb 16, 2016 | Completed final sign-off Feb 2018 | 990 Pacific Av | moh rad priority permit - mod permit to pa#201504012567, to clarify full scope of accessibility by the mayor's office on disability in the enforcement of the 2010 ada standards and tie california building code.Details
moh rad priority permit - mod permit to pa#201504012567, to clarify full scope of accessibility by the mayor's office on disability in the enforcement of the 2010 ada standards and tie california building code. |