Block 0332, lot 004
230 Eddy St
- City’s use
- Commercial Hotel
- Built
- 1927
- Stories
- 12
- Units
- 180
- Rooms
- 179 bathrooms
- Building
- 84,026 sq ft
- Lot
- 7,906 sq ft
- Zoning
- RC4
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 26, 2023 | Completed final sign-off Jul 2023 | 230 Eddy St | The Window And Door Shop Inc | (22) double hung windows in kind wood in wood out tod sash with ogee luggs. (windows are street facing)Details
(22) double hung windows in kind wood in wood out tod sash with ogee luggs. (windows are street facing) | $75,000 |
| Sep 22, 2022 | Completed final sign-off Jan 2023 | 230 Eddy St | Security Engineers Inc | as-built rev to 2019-0813-8705 - add 2 smoke detectors per fire inspectors request in community room; replaced 7 (e) power supplies like-for-like. no residential room will be removed, converted or demolished. repl mini horns with lf sounders to comply with sffc 1103.7.6.1.Details
as-built rev to 2019-0813-8705 - add 2 smoke detectors per fire inspectors request in community room; replaced 7 (e) power supplies like-for-like. no residential room will be removed, converted or demolished. repl mini horns with lf sounders to comply with sffc 1103.7.6.1. | $1,000 |
| Oct 1, 2021 | Never finaled issued Oct 2021, no final | 230 Eddy St | assembly permit only for 1st floor community room. occupant load: 96 persons. no work under this permit.Details
assembly permit only for 1st floor community room. occupant load: 96 persons. no work under this permit. | ||
| Jun 8, 2021 | Completed final sign-off Mar 2022 | 230 Eddy St | Das Solutions (Interim) | sf errcs rebanding and equipment upgradeDetails
sf errcs rebanding and equipment upgrade | $10,000 |
| Aug 16, 2019 | Completed final sign-off Nov 2019 | 230 Eddy St | Bbi - Con Inc | inkind repair of damaged 5'-long metal fire escape ladder at top and behind the parapet. repair in-kind ladder of (e) fire escape behind parapet to roof, approx 5 feet in length. repair does not change (e) egress, repair occurs behind southern parapetDetails
inkind repair of damaged 5'-long metal fire escape ladder at top and behind the parapet. repair in-kind ladder of (e) fire escape behind parapet to roof, approx 5 feet in length. repair does not change (e) egress, repair occurs behind southern parapet | $6,000 |
| Aug 13, 2019 | Completed final sign-off Jan 2023 | 230 Eddy St | Security Engineers Inc | like for like replacement of (e) fire alarm systemDetails
like for like replacement of (e) fire alarm system | $100,000 |
| Apr 17, 2019 | Completed final sign-off Sep 2019 | 230 Eddy St | Pac Integrations Inc | connecting errcs system to existing fire alarm systemDetails
connecting errcs system to existing fire alarm system | $10,000 |
| Sep 21, 2018 | Completed final sign-off Dec 2019 | 230 Eddy St | Pac Integrations Inc | installation of emergency responder radio coverage system.Details
installation of emergency responder radio coverage system. | $50,000 |
| Jul 24, 2018 | Completed final sign-off Dec 2019 | 230 Eddy St | Access Systems & Solutions Inc | addition of new ext bld maintenance system on the roof. no increase to cabinet or size of condiditoned space. per ab-093 table 1 green bld reqs of the sf green bld code do not applyDetails
addition of new ext bld maintenance system on the roof. no increase to cabinet or size of condiditoned space. per ab-093 table 1 green bld reqs of the sf green bld code do not apply | $350,000 |
| Nov 14, 2017 | Completed final sign-off Nov 2019 | 230 Eddy St | Bbi - Con Inc | replacement of existing exterior stair landing with new, in-kind; stair & landing are required means of egress. n/a maherDetails
replacement of existing exterior stair landing with new, in-kind; stair & landing are required means of egress. n/a maher | $25,000 |
| Oct 27, 2017 | Expired or cancelled cancelled Nov 2018 | 230 Eddy St | Bbi - Con Inc | voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance.Details
voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance. | $200,000 |
| Jul 27, 2017 | Never finaled issued Aug 2017, no final | 230 Eddy St | Adroit Solar **Bankrupt Ch7** | addition of (34) evacuated tub solar collectors, (1) 2900 gal solar storage tank, pumps and misc controls. existing plumbing permit pp20170321902Details
addition of (34) evacuated tub solar collectors, (1) 2900 gal solar storage tank, pumps and misc controls. existing plumbing permit pp20170321902 | $115,042 |
| Dec 21, 2015 | Completed final sign-off Jun 2016 | 230 Eddy St | Siemens Industry, Inc. | basement: fire alarm work for firefly door; 2 smoke detectors are being installed (one on each side of the door). maher naDetails
basement: fire alarm work for firefly door; 2 smoke detectors are being installed (one on each side of the door). maher na | $1,200 |
| Oct 28, 2015 | Never finaled issued Oct 2015, no final | 230 Eddy St | umbrella permit for compliance with high-rise sprinkler ordinance #377-93. all floors. maher n/aDetails
umbrella permit for compliance with high-rise sprinkler ordinance #377-93. all floors. maher n/a | ||
| Aug 25, 2015 | Completed final sign-off Sep 2015 | 230 Eddy St | Potter Fire Protection | 1st & 2nd floors: add 3 fire sprinkler to unsprinkled rooms. maher naDetails
1st & 2nd floors: add 3 fire sprinkler to unsprinkled rooms. maher na | $1,500 |
| Sep 9, 2013 | Never finaled issued Jun 2014, no final | 230 Eddy St | Anvil Builders Inc | construct new structural concrete ramp -structural. remove existing concrete ramp.Details
construct new structural concrete ramp -structural. remove existing concrete ramp. | $120,000 |
| Feb 5, 2007 | Completed final sign-off Apr 2007 | 232 Eddy St | Precision Elect Works Inc | install 1 pull station, 1 smoke detector, 1 duct smoke detector, 2 horn/strobes, 2 strobes, devices being added to e fa systemDetails
install 1 pull station, 1 smoke detector, 1 duct smoke detector, 2 horn/strobes, 2 strobes, devices being added to e fa system | $3,600 |
| Dec 7, 2006 | Completed final sign-off Apr 2007 | 232 Eddy St | Aquamatic Fire Protection | tenant improvement for respite center first floor, 2 add/relocate, 2 sprinkler headsDetails
tenant improvement for respite center first floor, 2 add/relocate, 2 sprinkler heads | $3,000 |
| Oct 30, 2006 | Completed final sign-off Apr 2007 | 230 Eddy St | Ncr Construction Inc | tic of existing commercial space to provide new office, upgrade mechanical system and add electrical outlets, phone jacks, computer hook ups.Details
tic of existing commercial space to provide new office, upgrade mechanical system and add electrical outlets, phone jacks, computer hook ups. | $75,000 |
| Mar 11, 2003 | Never finaled issued Mar 2003, no final | 230 Eddy St | street spaceDetails
street space | ||
| Jan 16, 2003 | Completed final sign-off Sep 2004 | 230 Eddy St | Brayer Electric Company | new fire alarm throughoutDetails
new fire alarm throughout | $48,000 |
| Jan 8, 2003 | Completed final sign-off Sep 2004 | 230 Eddy St | Snc Plumbing & Fire Pro | previous app 200103235139 s1 add 187 heads to the residential units closet. fromex existing approvedDetails
previous app 200103235139 s1 add 187 heads to the residential units closet. fromex existing approved | $35,000 |
| Mar 23, 2001 | Completed final sign-off Sep 2004 | 230 Eddy St | renovations to (e)bldg consisting of new-replacement windows,new roof,upgrades to plmbg,etcDetails
renovations to (e)bldg consisting of new-replacement windows,new roof,upgrades to plmbg,etc | $4,000,000 | |
| Dec 8, 2000 | Completed final sign-off Jun 2001 | 230 Eddy St | provide new concrete and metal stair and landing to replace bottom portion of exist bridge connectioDetails
provide new concrete and metal stair and landing to replace bottom portion of exist bridge connectio | $11,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.