- 1 permit filed
94 permits since 2000: 67 completed, 1 in progress, 18 never finaled, 8 expired or cancelled.
Of the 18 never-finaled permits, 3 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2025 | In progress issued Jun 2026 | 241 06th St | installation of new roof mounted generator & base tank. remote fuel fill box at grade level and piping to roof as a deferred submitttal for pa 20161298422. generator replacement is like for like.Details
installation of new roof mounted generator & base tank. remote fuel fill box at grade level and piping to roof as a deferred submitttal for pa 20161298422. generator replacement is like for like. | $80,000 |
| Dec 21, 2023 | Completed final sign-off Feb 2026 | 220 04th St | project is owner's improvement of an empty shell commercial space at ground flr of the affordable senior housing project in sf. todco is the property manager of the bldg, woolf house partners is owner. project includes bldg add office space, meeting room, storage and fully accessible restroom....Details
project is owner's improvement of an empty shell commercial space at ground flr of the affordable senior housing project in sf. todco is the property manager of the bldg, woolf house partners is owner. project includes bldg add office space, meeting room, storage and fully accessible restroom.... | $250,000 |
| Mar 20, 2023 | Completed final sign-off Sep 2023 | 328 Tehama St | units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors.Details
units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors. | $155,000 |
| Jun 25, 2021 | Completed final sign-off Nov 2023 | 175 Scotia Av | prop h. remodel extg interior space of 175 scotia ave. to a new t.i. childcare center, which includes infant, toddlers, and preschool classrooms, as well as administration areas. new doors and windows on the exteriors, many are to be replaced inDetails
prop h. remodel extg interior space of 175 scotia ave. to a new t.i. childcare center, which includes infant, toddlers, and preschool classrooms, as well as administration areas. new doors and windows on the exteriors, many are to be replaced in | $1,000,000 |
| Aug 28, 2020 | Completed final sign-off Oct 2021 | 165 Turk St | voluntary structural seismic improvements to an existing non-profit apartment building. **maher n/a**Details
voluntary structural seismic improvements to an existing non-profit apartment building. **maher n/a** | $398,856 |
| Dec 3, 2018 | Completed final sign-off Nov 2022 | 321 Clementina St | replacement of existing vinyl windows with new aluminum windows, like kind, same sizeDetails
replacement of existing vinyl windows with new aluminum windows, like kind, same size | $109,200 |
| Oct 10, 2018 | Completed final sign-off Oct 2020 | 1095 Mission St | minor rehab of e hotel includes replace light fixtures, mech vents, plumb fixtures for improving energy use and water conservation. replace residential appliances and unit flooring as neededDetails
minor rehab of e hotel includes replace light fixtures, mech vents, plumb fixtures for improving energy use and water conservation. replace residential appliances and unit flooring as needed | $135,000 |
| Jul 17, 2018 | Never finaled issued Aug 2018, no final | 2750 Geary Bl | new evacuation maps to replace existing maps on all floors.Details
new evacuation maps to replace existing maps on all floors. | $2,500 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 1370 California St | street spaceDetails
street space | |
| Oct 19, 2017 | Completed final sign-off Jun 2018 | 2750 Geary Bl | revision to 201610069700, removel work at 1st fl to add 2 new restrooms, select demo of walls, celing, doors, repair/paint new finishes to match existing conditions. maher n/a.Details
revision to 201610069700, removel work at 1st fl to add 2 new restrooms, select demo of walls, celing, doors, repair/paint new finishes to match existing conditions. maher n/a. | $150,000 |
| Aug 31, 2017 | Completed final sign-off Mar 2018 | 1700 Sutter St | installation of new hood and exhaust duct. ref #201705106233.Details
installation of new hood and exhaust duct. ref #201705106233. | $30,000 |
| Aug 14, 2017 | Completed final sign-off Mar 2019 | 172 06th St | remove (e) elevator and replace with (n) electric traction elevator within (e) shaft. this is a barrier removal project. to comply with nov 201765111, dated 3/2/2017, and 201763832, 3/3/2017. no exterior work. elevator serves residential hotel portion. n/a maherDetails
remove (e) elevator and replace with (n) electric traction elevator within (e) shaft. this is a barrier removal project. to comply with nov 201765111, dated 3/2/2017, and 201763832, 3/3/2017. no exterior work. elevator serves residential hotel portion. n/a maher | $500,000 |
| Jul 12, 2017 | Completed final sign-off May 2018 | 2750 Geary Bl | rev pa#2016-0815-5030: structural only: plywood on majority of outide of walls, sheet s2 with two add'l pad footings poured, all pad footins 30x30" are revised to include add'l rebar, added framing for staircase #3, removed roof above stairs #3. n/a maherDetails
rev pa#2016-0815-5030: structural only: plywood on majority of outide of walls, sheet s2 with two add'l pad footings poured, all pad footins 30x30" are revised to include add'l rebar, added framing for staircase #3, removed roof above stairs #3. n/a maher | |
| May 10, 2017 | Completed final sign-off Feb 2018 | 1700 Sutter St | renovation of a cummunity kitchen & upgrade nearby restrooms for accessibility per 20% rule. casework & finishes to be repalced in scope of work. mech, elec, plbg & fire sprinkler work to be deferred submittals under separate permit.Details
renovation of a cummunity kitchen & upgrade nearby restrooms for accessibility per 20% rule. casework & finishes to be repalced in scope of work. mech, elec, plbg & fire sprinkler work to be deferred submittals under separate permit. | $180,800 |
| Feb 14, 2017 | Expired or cancelled cancelled Jan 2026 | 2750 Geary Bl | remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher naDetails
remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher na | $155,000 |
| Jan 13, 2017 | Completed final sign-off Nov 2021 | 1370 California St | capital improvement project of non-residential support spaces to 1370 california. offices maintenance storage; laundry will be upgraded. a community room & two accessible restrooms will be added. existing steps in corridor will be replaced with a ramp. selected doors & windows replaced. lighting,Details
capital improvement project of non-residential support spaces to 1370 california. offices maintenance storage; laundry will be upgraded. a community room & two accessible restrooms will be added. existing steps in corridor will be replaced with a ramp. selected doors & windows replaced. lighting, | $125,000 |
| Dec 30, 2016 | Completed final sign-off Dec 2019 | 1370 California St | minor revisions to app. 2016-0914-7740, soft story retrofit to coordinate with proposed architectural changes. plywood shearwalls instead of strong wall panels in 3 lines & added shear walls. see also 2017-0113-7196.Details
minor revisions to app. 2016-0914-7740, soft story retrofit to coordinate with proposed architectural changes. plywood shearwalls instead of strong wall panels in 3 lines & added shear walls. see also 2017-0113-7196. | $1,000 |
| Oct 6, 2016 | Completed final sign-off Sep 2018 | 2750 Geary Bl | 1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb...Details
1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb... | $467,493 |
| Aug 15, 2016 | Completed final sign-off May 2018 | 2750 Geary Bl | demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs,Details
demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs, | $1,200,000 |
| Jan 29, 2016 | Completed final sign-off Mar 2026 | 241 06th St | accesibility improvements, unit kitchen upgrades, window replacement, light fixture replacement, exterior paint, bathroom ventilation upgrade. emergency generator work (replacement and enclosure) for reference only and to be separate submittal.Details
accesibility improvements, unit kitchen upgrades, window replacement, light fixture replacement, exterior paint, bathroom ventilation upgrade. emergency generator work (replacement and enclosure) for reference only and to be separate submittal. | $325,000 |
| Oct 21, 2015 | Never finaled issued May 2017, no final | 80 Turk St | revision to app#201404284291. addition of 2 restrooms and 1 ada compliant shower to basement.Details
revision to app#201404284291. addition of 2 restrooms and 1 ada compliant shower to basement. | $5,000 |
| Jun 22, 2015 | Completed final sign-off Sep 2015 | 230 04th St | ground floor office remodel including selective demolition, new interior walls, doors, windows and paint. mep, sprinklers separate permits.Details
ground floor office remodel including selective demolition, new interior walls, doors, windows and paint. mep, sprinklers separate permits. | $5,000 |
| Jun 2, 2015 | Never finaled issued Jul 2015, no final | 700 Ofarrell St | lobby renovation. replace finishes, replace entry gate, storefront door, mailboxes, wall base flooring and light fixtures. selective replacement of unit entry doors. addition of sconce lighting and exit lights. provision of new paint.repl intercom system &add security camera system.Details
lobby renovation. replace finishes, replace entry gate, storefront door, mailboxes, wall base flooring and light fixtures. selective replacement of unit entry doors. addition of sconce lighting and exit lights. provision of new paint.repl intercom system &add security camera system. | $75,000 |
| Jan 7, 2015 | Completed final sign-off Jun 2015 | 172 06th St | demolition of work done without permit per 201292373. work includes removal of walls for sound booth offices and dressing area, lighting, tbar ceiling, stairway, cabinets. compliance with maher ordinance no 155-13 not required.Details
demolition of work done without permit per 201292373. work includes removal of walls for sound booth offices and dressing area, lighting, tbar ceiling, stairway, cabinets. compliance with maher ordinance no 155-13 not required. | $5,000 |
| Oct 24, 2014 | Completed final sign-off Nov 2014 | 660 Lombard St | construction phase changes to work underway per pa 201309197216; delete raised planters & benches, change "previous concrete " to "concrete"Details
construction phase changes to work underway per pa 201309197216; delete raised planters & benches, change "previous concrete " to "concrete" | |
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 1711 Oakdale Av | replace 40 heater fan coils change 19 pair sliding glass patio doors in front and rear, and 103 windows same opening. u factor <0.58Details
replace 40 heater fan coils change 19 pair sliding glass patio doors in front and rear, and 103 windows same opening. u factor <0.58 | $100,000 |
| Jul 31, 2014 | Completed final sign-off Sep 2014 | 255 Potrero Av | demolition of interior partitions (non-structural) and removal of finishes per ab-017.Details
demolition of interior partitions (non-structural) and removal of finishes per ab-017. | $12,000 |
| Jun 27, 2014 | Never finaled issued Aug 2014, no final | 255 Potrero Av | 1)change of occupancy at lower level only. 2) t.i. at lower and upper level.3)new lighting at upper level.4)install new freight lift. 5)install roof deck at upper level. 6)electrical and mech. under seperate permit.n/a for the maher ordinance #155-13. no change on exterior front facade. window alterDetails
1)change of occupancy at lower level only. 2) t.i. at lower and upper level.3)new lighting at upper level.4)install new freight lift. 5)install roof deck at upper level. 6)electrical and mech. under seperate permit.n/a for the maher ordinance #155-13. no change on exterior front facade. window alter | $90,000 |
| Jun 25, 2014 | Completed final sign-off Apr 2017 | 1441 Powell St | b/f & 1/f - work @ health services project includes interior partition relocation, ada upgrade to one bathroom, & replacement of (e) accoustic ceiling tile, selected areas of resilient flooring & base, selected doors, including ada hardware, & all existing lighting.Details
b/f & 1/f - work @ health services project includes interior partition relocation, ada upgrade to one bathroom, & replacement of (e) accoustic ceiling tile, selected areas of resilient flooring & base, selected doors, including ada hardware, & all existing lighting. | $50,000 |
| Jun 25, 2014 | Completed final sign-off Apr 2017 | 1441 Powell St | replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generatorDetails
replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generator | $2,500,000 |
| May 16, 2014 | Completed final sign-off May 2017 | 1007 Market St | t.i. to extg 3 story bldg:new accessible restrooms, new interior finish and partitions and automatic sprinkler system. no exterior work. no change of use. mech, elec, & plmg under seperate permit.Details
t.i. to extg 3 story bldg:new accessible restrooms, new interior finish and partitions and automatic sprinkler system. no exterior work. no change of use. mech, elec, & plmg under seperate permit. | $200,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 115 Gates St | replacement of fixtures and finishes at bathroom and kitchen.Details
replacement of fixtures and finishes at bathroom and kitchen. | $20,000 |
| Apr 28, 2014 | Never finaled issued Jan 2015, no final | 80 Turk St | no change of use, commercial tenant improvements to an existing theater bldg. limited demolition, lighting and hvac upgrades, new elevator, accessible restrooms, improved fire sprinkler system (trade permit), new mezzanine at 1/f.Details
no change of use, commercial tenant improvements to an existing theater bldg. limited demolition, lighting and hvac upgrades, new elevator, accessible restrooms, improved fire sprinkler system (trade permit), new mezzanine at 1/f. | $1,200,000 |
| Sep 19, 2013 | Completed final sign-off Nov 2014 | 660 Lombard St | garden improvements at 2nd floor. remove (e) ashpalt, gravel surfaces. install new permeable concrete, new moveable planters, new moveable and fixed benches. compliance with ordinance #155-13 not requiredDetails
garden improvements at 2nd floor. remove (e) ashpalt, gravel surfaces. install new permeable concrete, new moveable planters, new moveable and fixed benches. compliance with ordinance #155-13 not required | $60,000 |
| Jun 6, 2013 | Never finaled issued Jul 2013, no final | 1095 Mission St | frame to support new projecting sign & signageDetails
frame to support new projecting sign & signage | $15,000 |
| Jun 6, 2013 | Never finaled issued Jul 2013, no final | 1095 Mission St | erect a non electric projecting single faced new signDetails
erect a non electric projecting single faced new sign | $15,000 |
| Jun 3, 2013 | Expired or cancelled withdrawn Jun 2013 | 1095 Mission St | to erect non electric wall signDetails
to erect non electric wall sign | $15,000 |
| Feb 8, 2013 | Never finaled issued Feb 2013, no final | 2430 Mission St | remove t-1 11 plywood from the front of the building for exploratory work. will safe guard after exploratory workDetails
remove t-1 11 plywood from the front of the building for exploratory work. will safe guard after exploratory work | $500 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 1095 Mission St | revision to appl #2010.0513.2365 includes revision to structural details to accommodate field conditions.revision to permit #1215329Details
revision to appl #2010.0513.2365 includes revision to structural details to accommodate field conditions.revision to permit #1215329 | |
| Oct 21, 2011 | Completed final sign-off Feb 2013 | 1370 California St | barrier removal only, elevator replacement inan existing 3-story over bsmnt . new elev. cab and mech, equiopments reusing the (e) elev shaft wall. new elev machine rm and snoke doors and new flooringh at elv. lobby at each floors, all requirements regarding pre-app meeting fulfilled. signage requireDetails
barrier removal only, elevator replacement inan existing 3-story over bsmnt . new elev. cab and mech, equiopments reusing the (e) elev shaft wall. new elev machine rm and snoke doors and new flooringh at elv. lobby at each floors, all requirements regarding pre-app meeting fulfilled. signage require | $350,000 |
| Oct 5, 2011 | Expired or cancelled expired Jun 2014 | 1525 Grant Av | replace existing finishes with new, replace in kind with new shower, toilets and sinks for common area residential restrooms (bathroom remodel)Details
replace existing finishes with new, replace in kind with new shower, toilets and sinks for common area residential restrooms (bathroom remodel) | $38,000 |
| Dec 22, 2010 | Completed final sign-off May 2011 | 1245 Howard St | revision to pa# 2010-0603-3780-delete installation of new restroom from scope of workDetails
revision to pa# 2010-0603-3780-delete installation of new restroom from scope of work | |
| Nov 23, 2010 | Completed final sign-off Feb 2012 | 216 Eddy St | complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair.Details
complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair. | $29,900 |
| Nov 16, 2010 | Completed final sign-off Apr 2011 | 1390 Market St | office ti on the 2nd floor , suites 230, 249, 250. no change in occupancy use. new full height and low partitions, paint w/in offices. no struc. work. elec and mech under separate permit, no lighting and mechanocal approval forDetails
office ti on the 2nd floor , suites 230, 249, 250. no change in occupancy use. new full height and low partitions, paint w/in offices. no struc. work. elec and mech under separate permit, no lighting and mechanocal approval for | $60,000 |
| Nov 16, 2010 | Completed final sign-off Jun 2011 | 980 Howard St | replace dishwashers in kind in all units counter tops, floor covering 100 sq per unitDetails
replace dishwashers in kind in all units counter tops, floor covering 100 sq per unit | $50,000 |
| Sep 3, 2010 | Completed final sign-off Jun 2011 | 926 Howard St | tenant improvements with new entry, ramp, restrooms, mezzanine framing and new partitions.Details
tenant improvements with new entry, ramp, restrooms, mezzanine framing and new partitions. | $180,000 |
| Aug 27, 2010 | Completed final sign-off Jan 2011 | 1370 California St | replace 200 windows in kind; re-stucco face of structure; replace siding in kind. u factor for replacement windows u=0.47Details
replace 200 windows in kind; re-stucco face of structure; replace siding in kind. u factor for replacement windows u=0.47 | $160,000 |
| Aug 24, 2010 | Completed final sign-off Dec 2010 | 1120 Hyde St | reroofingDetails
reroofing | $22,000 |
| Jun 3, 2010 | Completed final sign-off May 2011 | 1245 Howard St | office ti on the 1st fl. barrier removal inc. renovation of 2 existing restrooms, new sloped surface for elevation change and minor stair alteration. work incl. 1 new restroom, fully ada compliant .Details
office ti on the 1st fl. barrier removal inc. renovation of 2 existing restrooms, new sloped surface for elevation change and minor stair alteration. work incl. 1 new restroom, fully ada compliant . | $12,000 |
| May 13, 2010 | Never finaled issued Aug 2010, no final | 55 Columbus Av | complete the remodel of ground flr. commercial space originally approved under permit #200708160007.Details
complete the remodel of ground flr. commercial space originally approved under permit #200708160007. | $71,000 |
| May 13, 2010 | Completed final sign-off Jun 2013 | 1095 Mission St | replace (e) sidewalk over basement & associated substructue in-kind.Details
replace (e) sidewalk over basement & associated substructue in-kind. | $600,000 |
| Apr 22, 2010 | Completed final sign-off Jul 2010 | 1761 Turk St | replace in kind 51 windows facing street.Details
replace in kind 51 windows facing street. | $25,500 |
| Apr 9, 2010 | Completed final sign-off Aug 2010 | 321 Clementina St | demo (e) office space, elec. heating, lighting. add new partitions, door, lights, mech system, paint, carpet, sheet vinyl at (e) bathroomDetails
demo (e) office space, elec. heating, lighting. add new partitions, door, lights, mech system, paint, carpet, sheet vinyl at (e) bathroom | $15,000 |
| Feb 11, 2010 | Completed final sign-off May 2010 | 534 Broadway | bathroom remodel on 2nd floor. replace tub with shower pan and replace in kind on shower of mens common shower room. high efficacy lighting or occupancy sensor. no change to exhaust sytem.Details
bathroom remodel on 2nd floor. replace tub with shower pan and replace in kind on shower of mens common shower room. high efficacy lighting or occupancy sensor. no change to exhaust sytem. | $9,000 |
| Jan 27, 2010 | Completed final sign-off Sep 2010 | 1617 Howard St | replace existing common exterior stair with new stair. work at 1617 howardDetails
replace existing common exterior stair with new stair. work at 1617 howard | $70,000 |
| Jan 21, 2010 | Completed final sign-off May 2014 | 1095 Mission St | replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area.Details
replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area. | $2,100,000 |
| Nov 5, 2009 | Completed final sign-off Mar 2010 | 4 Charlton Ct | bathroom remodel on the first floor. new tiles.Details
bathroom remodel on the first floor. new tiles. | $12,000 |
| Oct 23, 2009 | Completed final sign-off Feb 2010 | 534 Broadway | bathroom remodel, rework tubs & replace with shower pans, 2 bathrooms on 2nd & 3rd floors. sro common bathroom. work in 534 broadwayDetails
bathroom remodel, rework tubs & replace with shower pans, 2 bathrooms on 2nd & 3rd floors. sro common bathroom. work in 534 broadway | $25,000 |
| Sep 24, 2009 | Completed final sign-off Mar 2010 | 1607 Howard St | kitchen & bathroom remodel, window replacement @ front, water heater & space heater replacement.Details
kitchen & bathroom remodel, window replacement @ front, water heater & space heater replacement. | $47,000 |
| Aug 11, 2009 | Completed final sign-off Feb 2018 | 1294 Potrero Av | rework two existing ramps at the north and south side of central entry court yard to correct disabled access deficiencies. alter handrail, guardrails and security gates. install power door operators.Details
rework two existing ramps at the north and south side of central entry court yard to correct disabled access deficiencies. alter handrail, guardrails and security gates. install power door operators. | $90,000 |
| Jul 31, 2009 | Completed final sign-off Nov 2009 | 534 Broadway | bathroom remodel, remove tub, pan & replace with shower pan. 1 bathroom 3rd floor only.Details
bathroom remodel, remove tub, pan & replace with shower pan. 1 bathroom 3rd floor only. | $18,000 |
| Jul 9, 2009 | Completed final sign-off Jul 2010 | 2567 San Bruno Av | convert existing garage space into a community meeting room and accessible unisex toilet. mep, fire alarm & sprinkler under separate permit.Details
convert existing garage space into a community meeting room and accessible unisex toilet. mep, fire alarm & sprinkler under separate permit. | $42,000 |
| May 18, 2009 | Completed final sign-off Dec 2009 | 101 Horne Av | replacement of all exterior windows, replacement of all exterior doors, exterior painting, removal of steam piping abatementDetails
replacement of all exterior windows, replacement of all exterior doors, exterior painting, removal of steam piping abatement | $1,899,000 |
| Apr 22, 2009 | Completed final sign-off Nov 2009 | 11 Grove St | tenant improvement to exhibition arear, bike room, and lobby.Details
tenant improvement to exhibition arear, bike room, and lobby. | $15,000 |
| Apr 8, 2009 | Completed final sign-off Dec 2009 | 1038 Post St | demo interior non-structural partitions for future tenant improvement under a separate permit appl. 200901099865. (no exterior work to be done).Details
demo interior non-structural partitions for future tenant improvement under a separate permit appl. 200901099865. (no exterior work to be done). | $6,000 |
| Jan 15, 2009 | Never finaled issued Feb 2009, no final | 420 29th Av | bernal heights neighborhood center will be the project manager for the temporary shoring of the existing parish building to allow for the demolition of the (e) urm church & the construction of a new wall, both of which will be submitted under separate permit.Details
bernal heights neighborhood center will be the project manager for the temporary shoring of the existing parish building to allow for the demolition of the (e) urm church & the construction of a new wall, both of which will be submitted under separate permit. | $3,000 |
| Jan 9, 2009 | Completed final sign-off Dec 2009 | 1038 Post St | change use to youth center. t.i. to g/f & 2/f. work includes new accessible restrooms, staff kitchen, and soundroom on g/f, new acessible restrooms, offices, conference room on 2/fr, stairway upgrade and new limited use/access elevator for building. new mech. system upgrade under seperate permit.Details
change use to youth center. t.i. to g/f & 2/f. work includes new accessible restrooms, staff kitchen, and soundroom on g/f, new acessible restrooms, offices, conference room on 2/fr, stairway upgrade and new limited use/access elevator for building. new mech. system upgrade under seperate permit. | $300,000 |
| Nov 18, 2008 | Completed final sign-off Jun 2013 | 1160 Grant Av | renew pa# 2001/09/19/8669 to obtain final inspection. all work completed.Details
renew pa# 2001/09/19/8669 to obtain final inspection. all work completed. | |
| Nov 17, 2008 | Completed final sign-off Dec 2008 | 1160 Grant Av | to obtain final inspection work approved under pa#200706053047. all work complete.Details
to obtain final inspection work approved under pa#200706053047. all work complete. | |
| Oct 23, 2008 | Never finaled issued Jan 2009, no final | 328 Tehama St | 2nd/fl. mep for office tenant improvement. reference app#200806063877Details
2nd/fl. mep for office tenant improvement. reference app#200806063877 | $120,000 |
| May 2, 2008 | Never finaled issued May 2008, no final | 52 Dore St | remove walls, ceiling floors and equipment at north partition of ground floor and at entire 2nd floor. no ti work under this permit, no da required per ab-017Details
remove walls, ceiling floors and equipment at north partition of ground floor and at entire 2nd floor. no ti work under this permit, no da required per ab-017 | $14,000 |
| Mar 3, 2008 | Completed final sign-off Jul 2009 | 49 Columbus Av | facade improvements, accessible entry & lobby. ref. to appl#200707136799Details
facade improvements, accessible entry & lobby. ref. to appl#200707136799 | $75,000 |
| Feb 8, 2008 | Completed final sign-off May 2008 | 705 Panorama Dr | back porch replacement (in-kind).Details
back porch replacement (in-kind). | $26,000 |
| Sep 4, 2007 | Completed final sign-off Mar 2008 | 801 Howard St | replace damaged fence less than 6 feet. repair irrigation system. re-landscape. replace two lights. replace concrete planters.Details
replace damaged fence less than 6 feet. repair irrigation system. re-landscape. replace two lights. replace concrete planters. | $35,000 |
| Jul 13, 2007 | Completed final sign-off Jun 2009 | 49 Columbus Av | structural renovation, heating, electrical & plumbing upgrades, basement renovation for resident use, accessible lobby renovations & install lu/la (limited use/limited application) lift, barrier removal at commercial tenant entry.umb retrofit. changes to north, east facade at g/f under seperate permDetails
structural renovation, heating, electrical & plumbing upgrades, basement renovation for resident use, accessible lobby renovations & install lu/la (limited use/limited application) lift, barrier removal at commercial tenant entry.umb retrofit. changes to north, east facade at g/f under seperate perm | $2,083,000 |
| Apr 13, 2007 | Expired or cancelled expired Feb 2011 | 1001 Polk St | renovation of (e) respite space at 2nd floor to provide 2 additional offices, reconfiguration of bed area for men and women. addition of accessible sink at hall for staff use. no change in # of beds/capacity. mechanical and electrical under seperate permit.Details
renovation of (e) respite space at 2nd floor to provide 2 additional offices, reconfiguration of bed area for men and women. addition of accessible sink at hall for staff use. no change in # of beds/capacity. mechanical and electrical under seperate permit. | $82,000 |
| Oct 30, 2006 | Completed final sign-off Apr 2007 | 230 Eddy St | tic of existing commercial space to provide new office, upgrade mechanical system and add electrical outlets, phone jacks, computer hook ups.Details
tic of existing commercial space to provide new office, upgrade mechanical system and add electrical outlets, phone jacks, computer hook ups. | $75,000 |
| Oct 17, 2006 | Expired or cancelled cancelled Oct 2007 | 39 Fell St | remodel existing sleep/nap area on ground floor, renovate existing mechanical and electrical systems, install new finishes.Details
remodel existing sleep/nap area on ground floor, renovate existing mechanical and electrical systems, install new finishes. | $250,000 |
| Apr 21, 2006 | Completed final sign-off Jun 2006 | 15 Bishop St | remove 2 decks, replace with staircase on exterior rear of building.Details
remove 2 decks, replace with staircase on exterior rear of building. | $11,000 |
| Sep 16, 2005 | Completed final sign-off Sep 2005 | 421 Leavenworth St | renew permit 200502155550 for finalDetails
renew permit 200502155550 for final | |
| Mar 24, 2005 | Completed final sign-off Jul 2006 | 1010 Mission St | additional work to approval t.i permit. includes non structural partitions & kitchen cabinets.orgDetails
additional work to approval t.i permit. includes non structural partitions & kitchen cabinets.org | $35,000 |
| Feb 15, 2005 | Expired or cancelled expired Sep 2005 | 421 Leavenworth St | to renew for full value per app #200212063000Details
to renew for full value per app #200212063000 | $18,000 |
| Aug 5, 2004 | Expired or cancelled expired Jan 2006 | 172 06th St | renew app #200312081826Details
renew app #200312081826 | |
| Apr 15, 2004 | Completed final sign-off Apr 2004 | 172 06th St | renew appl#200307169632,200303270837,200211131351 for final inspectionDetails
renew appl#200307169632,200303270837,200211131351 for final inspection | |
| Nov 5, 2003 | Expired or cancelled expired Jan 2006 | 172 06th St | permit rev to 200209207033,200211131351,200303270887 & 200307169632 to include mayor's office onDetails
permit rev to 200209207033,200211131351,200303270887 & 200307169632 to include mayor's office on | |
| Sep 24, 2003 | Completed final sign-off Jul 2004 | 1040 Bush St | in kind replacement of existing sunroom windows. install intercom from door to desk on 1st flr, replDetails
in kind replacement of existing sunroom windows. install intercom from door to desk on 1st flr, repl | $35,000 |
| Sep 15, 2003 | Completed final sign-off Sep 2003 | 1776 Sutter St | to renew app#2002/07/18/1735,2002/05/16/6740 & 2002/11/26/2284 for final inspection.Details
to renew app#2002/07/18/1735,2002/05/16/6740 & 2002/11/26/2284 for final inspection. | |
| Jul 28, 2003 | Never finaled issued Jul 2003, no final | 1776 Sutter St | install new fire smoke dampers.Details
install new fire smoke dampers. | $22,000 |
| Jul 16, 2003 | Never finaled issued Aug 2003, no final | 172 06th St | construction of a new partition within the (e) grnd flr, residential lobby w/a exit doorDetails
construction of a new partition within the (e) grnd flr, residential lobby w/a exit door | $4,900 |
| Mar 26, 2003 | Completed final sign-off Jun 2003 | 1360 Mission St | oti-2 3/f elDetails
oti-2 3/f el | $8,000 |
| Jan 7, 2003 | Completed final sign-off Jun 2003 | 1360 Mission St | oti-1, 2nd flr. el, me, spDetails
oti-1, 2nd flr. el, me, sp | $200,000 |
| Nov 13, 2002 | Never finaled issued Mar 2003, no final | 172 06th St | mechanical,electrical,plumbing work only at grd floor tenant improv.accessible units, laundry rm perDetails
mechanical,electrical,plumbing work only at grd floor tenant improv.accessible units, laundry rm per | $150,000 |
| Mar 19, 2001 | Completed final sign-off Mar 2002 | 421 Leavenworth St | unreasonable hardship request apt 38 provid 2 33" straight grab bar to gain addtnl length in liu ofDetails
unreasonable hardship request apt 38 provid 2 33" straight grab bar to gain addtnl length in liu of | $300 |
| Oct 13, 2000 | Completed final sign-off Jul 2001 | 220 Pierce St | maintenance repair,replace all windows in kind,reroof, bathroom & kitchen fans,dr hardwre,ext sidingDetails
maintenance repair,replace all windows in kind,reroof, bathroom & kitchen fans,dr hardwre,ext siding | $96,000 |