Ncr Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Oct 2000 to Feb 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 67 completed, 1 in progress, 18 never finaled, 8 expired or cancelled.
Of the 18 never-finaled permits, 3 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 9 completed, 1 expired or cancelled. Typically 110 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2017 | Completed final sign-off May 2018 | 2750 Geary Bl | rev pa#2016-0815-5030: structural only: plywood on majority of outide of walls, sheet s2 with two add'l pad footings poured, all pad footins 30x30" are revised to include add'l rebar, added framing for staircase #3, removed roof above stairs #3. n/a maherDetails
rev pa#2016-0815-5030: structural only: plywood on majority of outide of walls, sheet s2 with two add'l pad footings poured, all pad footins 30x30" are revised to include add'l rebar, added framing for staircase #3, removed roof above stairs #3. n/a maher | |
| Feb 14, 2017 | Expired or cancelled cancelled Jan 2026 | 2750 Geary Bl | remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher naDetails
remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher na | $155,000 |
| Oct 6, 2016 | Completed final sign-off Sep 2018 | 2750 Geary Bl | 1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb...Details
1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb... | $467,493 |
| Aug 15, 2016 | Completed final sign-off May 2018 | 2750 Geary Bl | demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs,Details
demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs, | $1,200,000 |
| Jan 7, 2015 | Completed final sign-off Jun 2015 | 172 06th St | demolition of work done without permit per 201292373. work includes removal of walls for sound booth offices and dressing area, lighting, tbar ceiling, stairway, cabinets. compliance with maher ordinance no 155-13 not required.Details
demolition of work done without permit per 201292373. work includes removal of walls for sound booth offices and dressing area, lighting, tbar ceiling, stairway, cabinets. compliance with maher ordinance no 155-13 not required. | $5,000 |
| Nov 23, 2010 | Completed final sign-off Feb 2012 | 216 Eddy St | complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair.Details
complete ada scope of work remaining at tenderloin neighhood dev.corp. which is part of expired/unclosed permits. entry storefront to ada compliance, including ramp, restrooms, stair. | $29,900 |
| Jun 3, 2010 | Completed final sign-off May 2011 | 1245 Howard St | office ti on the 1st fl. barrier removal inc. renovation of 2 existing restrooms, new sloped surface for elevation change and minor stair alteration. work incl. 1 new restroom, fully ada compliant .Details
office ti on the 1st fl. barrier removal inc. renovation of 2 existing restrooms, new sloped surface for elevation change and minor stair alteration. work incl. 1 new restroom, fully ada compliant . | $12,000 |
| Jan 27, 2010 | Completed final sign-off Sep 2010 | 1617 Howard St | replace existing common exterior stair with new stair. work at 1617 howardDetails
replace existing common exterior stair with new stair. work at 1617 howard | $70,000 |
| Jan 9, 2009 | Completed final sign-off Dec 2009 | 1038 Post St | change use to youth center. t.i. to g/f & 2/f. work includes new accessible restrooms, staff kitchen, and soundroom on g/f, new acessible restrooms, offices, conference room on 2/fr, stairway upgrade and new limited use/access elevator for building. new mech. system upgrade under seperate permit.Details
change use to youth center. t.i. to g/f & 2/f. work includes new accessible restrooms, staff kitchen, and soundroom on g/f, new acessible restrooms, offices, conference room on 2/fr, stairway upgrade and new limited use/access elevator for building. new mech. system upgrade under seperate permit. | $300,000 |
| Apr 21, 2006 | Completed final sign-off Jun 2006 | 15 Bishop St | remove 2 decks, replace with staircase on exterior rear of building.Details
remove 2 decks, replace with staircase on exterior rear of building. | $11,000 |