Block 1070, lot 001A
2750 Geary Blvd
- City’s use
- Commercial Misc
- Built
- 1914
- Stories
- 3
- Units
- 3
- Building
- 28,773 sq ft
- Lot
- 33,824 sq ft
- Zoning
- NC3
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2025 | Completed final sign-off Nov 2025 | 2750 Geary Bl | R R S A Commercial Roofing Inc | re roofing: no torch down, no hot works.Details
re roofing: no torch down, no hot works. | $286,420 |
| Apr 29, 2025 | In progress issued May 2025 | 2750 Geary Bl | Heating And Air Design | installation of 89 packaged ac units including electrical and condensate drainage lines. removal of existing steam heating system. removal of existing steam/hydrant system.Details
installation of 89 packaged ac units including electrical and condensate drainage lines. removal of existing steam heating system. removal of existing steam/hydrant system. | $990,000 |
| Dec 11, 2024 | In progress filed Dec 2024, not yet issued | 2750 Geary Bl | new main switchboard for new pge electricl service and/or upgrade for anticipated mechanical loads which shall introduce new cooling systems.Details
new main switchboard for new pge electricl service and/or upgrade for anticipated mechanical loads which shall introduce new cooling systems. | $50,000 | |
| Aug 21, 2019 | Never finaled filed Aug 2019, never issued | 2750 Geary Bl | horizontal addition. 4-story addition located in (e) parking lot w/ 20 rms and 5 parking spaces @ grd flr. 2-story addition community bldg in courtyard to connect to main bldg. (e) assisted living facility has 79 rms, total rms shall be 99 rms.**comply with maher, route to dph**Details
horizontal addition. 4-story addition located in (e) parking lot w/ 20 rms and 5 parking spaces @ grd flr. 2-story addition community bldg in courtyard to connect to main bldg. (e) assisted living facility has 79 rms, total rms shall be 99 rms.**comply with maher, route to dph** | $1,500,000 | |
| Jul 17, 2018 | Never finaled issued Aug 2018, no final | 2750 Geary Bl | Ncr Construction Inc | new evacuation maps to replace existing maps on all floors.Details
new evacuation maps to replace existing maps on all floors. | $2,500 |
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 2750 Geary Bl | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Mar 19, 2018 | Completed final sign-off May 2018 | 2750 Geary Bl | Fire Suppression Technology's Inc | install new fire sprinkl system for 2nd & 3rd partial flr remodel of retirement facility. as builts ref 201707202509 maher naDetails
install new fire sprinkl system for 2nd & 3rd partial flr remodel of retirement facility. as builts ref 201707202509 maher na | |
| Feb 23, 2018 | Never finaled issued Feb 2018, no final | 2750 Geary Bl | street spaceDetails
street space | ||
| Feb 16, 2018 | Completed final sign-off Apr 2018 | 2750 Geary Bl | San Francisco Fire Protection | like for like for existing system and upgrade to system to accomodate new addition to bldg. ref app#201608155030 new scope add 18 low freq. horns to new addition. per nfpa 72. n/a for maherDetails
like for like for existing system and upgrade to system to accomodate new addition to bldg. ref app#201608155030 new scope add 18 low freq. horns to new addition. per nfpa 72. n/a for maher | $80,000 |
| Nov 30, 2017 | Never finaled issued Jan 2018, no final | 2750 Geary Bl | Arrow Sign Company | install new illuminated projection sign maher naDetails
install new illuminated projection sign maher na | $4,000 |
| Nov 30, 2017 | Completed final sign-off Sep 2018 | 2750 Geary Bl | Arrow Sign Company | replace existing sign lettering with new illuminated channel letter se5 (name change) maher naDetails
replace existing sign lettering with new illuminated channel letter se5 (name change) maher na | $6,000 |
| Oct 19, 2017 | Completed final sign-off Jun 2018 | 2750 Geary Bl | Ncr Construction Inc | revision to 201610069700, removel work at 1st fl to add 2 new restrooms, select demo of walls, celing, doors, repair/paint new finishes to match existing conditions. maher n/a.Details
revision to 201610069700, removel work at 1st fl to add 2 new restrooms, select demo of walls, celing, doors, repair/paint new finishes to match existing conditions. maher n/a. | $150,000 |
| Jul 20, 2017 | Never finaled issued Jul 2017, no final | 2750 Geary Bl | Fire Suppression Technology's Inc | install new fire sprinkler system for 2nd and 3rd floor partial floor remodel of retirement facility. ref app#201608155030Details
install new fire sprinkler system for 2nd and 3rd floor partial floor remodel of retirement facility. ref app#201608155030 | $58,275 |
| Jul 12, 2017 | Completed final sign-off May 2018 | 2750 Geary Bl | Ncr Construction Inc | rev pa#2016-0815-5030: structural only: plywood on majority of outide of walls, sheet s2 with two add'l pad footings poured, all pad footins 30x30" are revised to include add'l rebar, added framing for staircase #3, removed roof above stairs #3. n/a maherDetails
rev pa#2016-0815-5030: structural only: plywood on majority of outide of walls, sheet s2 with two add'l pad footings poured, all pad footins 30x30" are revised to include add'l rebar, added framing for staircase #3, removed roof above stairs #3. n/a maher | |
| Feb 14, 2017 | Expired or cancelled cancelled Jan 2026 | 2750 Geary Bl | Ncr Construction Inc | remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher naDetails
remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher na | $155,000 |
| Oct 25, 2016 | Completed final sign-off Dec 2016 | 2750 Geary Bl | U S Prime Contractor Inc | repair cracked/damaged conc columns for the elevator mechanical room at roof level; maher n/aDetails
repair cracked/damaged conc columns for the elevator mechanical room at roof level; maher n/a | $10,000 |
| Oct 6, 2016 | Completed final sign-off Sep 2018 | 2750 Geary Bl | Ncr Construction Inc | 1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb...Details
1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb... | $467,493 |
| Aug 15, 2016 | Completed final sign-off May 2018 | 2750 Geary Bl | Ncr Construction Inc | demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs,Details
demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs, | $1,200,000 |
| Oct 15, 2015 | Completed final sign-off Dec 2015 | 2750 Geary Bl | Quayle And Company | install a fixed canopy over front entrance. note: actual location of canopy is on wood street physical address of 2750 geary bld. maher naDetails
install a fixed canopy over front entrance. note: actual location of canopy is on wood street physical address of 2750 geary bld. maher na | $1,800 |
| Nov 6, 2014 | Expired or cancelled cancelled Jan 2026 | 2750 Geary Bl | Yada Signs Co | install a new canopy awning to the entry to building. n/a maher ordinanceDetails
install a new canopy awning to the entry to building. n/a maher ordinance | $2,000 |
| Jun 18, 2014 | Never finaled issued Jun 2014, no final | 2750 Geary Bl | Yada Signs Co | erect an illuminated single faced wall sign; compliance with ord 155-13 not requiredDetails
erect an illuminated single faced wall sign; compliance with ord 155-13 not required | $1,500 |
| Dec 5, 2013 | Never finaled issued Jan 2014, no final | 2750 Geary Bl | Kitech Security System | provide a delayed egress system and components to existing exit doors at 12 locations on 3 levels per plan.Details
provide a delayed egress system and components to existing exit doors at 12 locations on 3 levels per plan. | $30,000 |
| Nov 14, 2013 | Expired or cancelled withdrawn Dec 2013 | 2750 Geary Bl | Kitech Security System | install delayed egress magnetic locking system connected to existing fire alarm systemDetails
install delayed egress magnetic locking system connected to existing fire alarm system | $30,000 |
| Jun 3, 2004 | Expired or cancelled expired May 2005 | 2750 Geary Bl | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of 1 automatic hood duct fire suppression systemDetails
installation of 1 automatic hood duct fire suppression system | $1,975 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ncr Construction Inc (6), Arrow Sign Company (2), Fire Suppression Technology's Inc (2), Kitech Security System (2), Yada Signs Co (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Heating And Air Design, Quayle And Company, R R S A Commercial Roofing Inc, San Francisco Fire Protection, U S Prime Contractor Inc
- Architects
- R. Castillo-Bannelos Kodama Diseno (5)
- Engineers
- Behruz Vahdani-Sanavi, Ph.D.,P.E, Peter Sung
- Designers
- R. Castillo-Bannelos Kodama Diseno, Rene A Arguinada
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.