Block 3726, lot 010
172 06th St
58 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2026 | Completed | 172 06th St | Smart Building Inc. | repair / replace floor tiles at the 3rd floor hallway as needed. comply with nov# 202654937 item #2. | $11,000 |
| Jun 2, 2026 | Completed | 172 06th St | Smart Building Inc. | unit 213, 313 and 413: install insulation, drywall, doors, flooring, trim where missing prime & painted affected area | $50,000 |
| Apr 17, 2026 | In progress | 172 06th St | Drycrew Restoration Contractor | flrs 1-3 lobby areas: perform selective demolition on non structual walls sections of drywall, approx 80 sq ft, along with removal and repair of 30sq ft of flooring. | $3,000 |
| Mar 5, 2026 | In progress | 172 06th St | Smart Building Inc. | units 214 and 314: revision to permit 202602035111 to include and rectify code compliance issues associated with his nov 202650392. to comply wiht nov 202650392 includes trash chute door repair, reaplce flooring, drywalls, windows, front door, and hardware for unit 314. all work to be done in kind. | $7,500 |
| Feb 3, 2026 | In progress | 172 06th St | Smart Building Inc. | #314:replace-70 sf of drywall in kitchen,new kitchen cabinets and countertop,following existing layout,like for like.new light fixture in kitchen.#214:replace 70 sf of drywall in kitchen,new kitchen cabinets and countertop,following existing layout,like for like.new light fixture in kitchen&bathroom | $20,000 |
| Jan 29, 2026 | Completed | 172 06th St | All Seasons North Roofing And Waterproof | re-roofing: existing roof recover sow using single ply tpo, no existing bur roof system materials will be removed, no hot work. | $160,000 |
| Dec 30, 2025 | Completed | 172 06th St | Freestone Reconstruction Inc | revision to pa#: 202407317662; move (e) sink to opposite side of community room; relocate (e) stove; create u-shape with counter, install (2) 45-minute fire-resistance rated fixed windows in a 1-hour occupancy separation wall. | $4,500 |
| Nov 6, 2025 | Completed | 172 06th St | Aquamatic Fire Protection | 1st floor: relocate and replace (6) pendent fire sprinklers for tenant improvement. no underground work. reference t.i. permit #202407317631 | $10,700 |
| Jul 31, 2024 | Completed | 172 06th St | Freestone Reconstruction Inc | correct nov# 202294452 - cover drywall areas on 3rd - 5th floors in laundry rooms. drywall @ laundry room on 3rd, 4th, 5th floor - approx 200 sq.sf. nothing visible from street view. | $25,000 |
| Jul 31, 2024 | Completed | 172 06th St | Freestone Reconstruction Inc | modernize community room, basment complete repair of struc damage misc exterior repaint | $450,000 |
| Apr 18, 2024 | Completed | 172 06th St | Freestone Reconstruction Inc | install (n) interior electrified door for security opens by buzzer or fob; replace steel door @ street w/new steel door. work @ street level only | $30,000 |
| Aug 22, 2023 | Completed | 172 06th St | Bold Construction Group Inc | unit #510 "dwelling unit": to comply with nov 202301376. retrofit one window in living room. install linoleum flooring (approx 400 sf). baseboard kitchen cabinets. bathroom vanity. toilet. | $5,000 |
| Sep 16, 2022 | Completed | 172 06th St | Bold Construction Group Inc | water damage repair-install new drywall in unit #214 , new drywall repair- unit #314 new dryall repair in basement, install vinyl planks in some floor areas only for repair (to comply with #202292960-rapair celings drywall in common area only) | $2,200 |
| Aug 22, 2022 | Expired or cancelled | 172 06th St | Ideal Restoration Inc | unit 208: removal of sheetrock due to water damage, basement, laundry rooms on 5/f, 4/f, 3/f, & 2/f; common hallway on ground floor | $10,175 |
| Oct 17, 2020 | Never finaled | 172 06th St | Freestone Reconstruction Inc | remove existing wood bench. build new reception area & mailbox. replace existing entrance doors w/ new doors and hardware. existing gate to remain. | $15,000 |
| Sep 18, 2019 | Completed | 172 06th St | B B J Electric, Inc | install new fire alarm system to meet sffc 1103.7.6.1. 1 facu, 2 annonciator, 4 power supplies, 72 smoke detectors, 1 pull station, 7 relays, 10 monitor modules, 4 nac modules, 7 strobes, 1 bell, 48 horn strobes, 5 lf hornstrobes, 95 lf sanders. ** maher: n/a ** | $148,200 |
| Jun 18, 2018 | Never finaled | 172 06th St | street space/mta meter | ||
| Feb 8, 2018 | Never finaled | 172 06th St | street space permit - renewal of permit # 201708144681 | ||
| Oct 13, 2017 | Completed | 172 06th St | San Francisco Fire Protection | due to replacement of elevator, 6 new door holders will be install 2nd-6th fl, tie in to new power supply installed next to ex control panel in the basement. new relay module will be installed on gr fl to control fire smoke curtain. ref 201708144681 | $3,200 |
| Aug 14, 2017 | Completed | 172 06th St | Ncr Construction Inc | remove (e) elevator and replace with (n) electric traction elevator within (e) shaft. this is a barrier removal project. to comply with nov 201765111, dated 3/2/2017, and 201763832, 3/3/2017. no exterior work. elevator serves residential hotel portion. n/a maher | $500,000 |
| Jan 7, 2015 | Completed | 172 06th St | Ncr Construction Inc | demolition of work done without permit per 201292373. work includes removal of walls for sound booth offices and dressing area, lighting, tbar ceiling, stairway, cabinets. compliance with maher ordinance no 155-13 not required. | $5,000 |
| Jul 11, 2012 | Completed | 172 06th St | Aquamatic Fire Protection | install pendent sprinklers from (e) sprinkler system below suspended ceiling. install upright sprinklers due to mezzanine & new walls | $5,000 |
| Nov 10, 2009 | Expired or cancelled | 172 06th St | Ecostruction | barrier remove at entrance of grocery store. level entrance with sidewalk, install on new hc ramp inside store and remove existing ramp and enclosed door opening. | $40,000 |
| Mar 4, 2005 | Never finaled | 174 06th St | Gucho Plumbing | install 3 sprinkler heads to walk (box) refrigerator from (e) sprinkler system | $280 |
| Feb 22, 2005 | Never finaled | 172 06th St | street space & sidewalk | ||
| Jan 13, 2005 | Never finaled | 174 06th St | International Commercial Awning, Inc. | install a new canvas awning over store front/see plan. | $1,950 |
| Aug 5, 2004 | Expired or cancelled | 172 06th St | Ncr Construction Inc | renew app #200312081826 | |
| Apr 15, 2004 | Completed | 172 06th St | Ncr Construction Inc | renew appl#200307169632,200303270837,200211131351 for final inspection | |
| Dec 8, 2003 | Expired or cancelled | 172 06th St | rev.appl#200311059499 to include mayor'soffice of disability review.1 change to previous scope of | ||
| Dec 1, 2003 | Completed | 172 06th St | San Francisco Fire Protection | revise fire alarm system approved under app#2003/10/27/8549. delete ea. flr's sprinkler valve tamper | |
| Nov 5, 2003 | Expired or cancelled | 172 06th St | Ncr Construction Inc | permit rev to 200209207033,200211131351,200303270887 & 200307169632 to include mayor's office on | |
| Nov 4, 2003 | Never finaled | 172 06th St | street space permit | ||
| Oct 27, 2003 | Completed | 172 06th St | San Francisco Fire Protection | re-activate pa #200105078523 & #200207191925, install fire alarm system | $1,000 |
| Oct 17, 2003 | Completed | 172 06th St | Tadgh Patrick Mc Sweeney | renew appl#9717784 for final inspection | |
| Sep 26, 2003 | Completed | 172 06th St | Tadgh Patrick Mc Sweeney | to renew app#2001/04/13/6841 for final inspection. | |
| Sep 22, 2003 | Completed | 172 06th St | Aquamatic Fire Protection | as built fire sprinkler plans to accomodate the fire inspecotr at time of inspections. revisions to | |
| Aug 27, 2003 | Never finaled | 172 06th St | street space | ||
| Jul 16, 2003 | Never finaled | 172 06th St | Ncr Construction Inc | construction of a new partition within the (e) grnd flr, residential lobby w/a exit door | $4,900 |
| Jul 9, 2003 | Expired or cancelled | 172 06th St | Gucho Plumbing | adding 2 sprinkler heads as built for 200105250073 | $180 |
| Jul 1, 2003 | Never finaled | 172 06th St | street space permit | ||
| May 5, 2003 | Completed | 172 06th St | Aquamatic Fire Protection | sprinkler system retrofit to meet sro on flrs 2-6, and basement, install fire sprinklers in commerci | $75,500 |
| Mar 27, 2003 | Never finaled | 172 06th St | construction of(1) 112 sq.ft. trash rm w/in (e) grnd flr w/a door to exterior at natoma st-sprink un | $15,000 | |
| Mar 6, 2003 | Completed | 172 06th St | Tom Lee Roofing Inc. | reroofing | $60,000 |
| Feb 27, 2003 | Completed | 172 06th St | revision 2002/05/28/7602. w/ reinforce steel special inspection as alto/compact fill. | $100 | |
| Feb 26, 2003 | Never finaled | 172 06th St | street space | ||
| Nov 13, 2002 | Never finaled | 172 06th St | Ncr Construction Inc | mechanical,electrical,plumbing work only at grd floor tenant improv.accessible units, laundry rm per | $150,000 |
| Sep 20, 2002 | Expired or cancelled | 172 06th St | remodel 3 units, create laundryrm for each floor,tenant improvement on grd fl,etc. | $400,000 | |
| Jul 19, 2002 | Completed | 172 06th St | Northwest Security | revision to 2001/05/07/8523. "as built". | $5,000 |
| May 28, 2002 | Never finaled | 172 06th St | install new concrete retaining wall in existing basement for future elect transformer | $35,000 | |
| Feb 6, 2002 | Expired or cancelled | 172 06th St | Frank Norris | renew expired permit#2001/09/26/9316 for final inspections. | |
| Dec 12, 2001 | Completed | 172 06th St | permit to issue a new cfc verifying correct unit count new count to verify 50 dwelling units,25 gues | ||
| Sep 26, 2001 | Expired or cancelled | 172 06th St | Tadgh Patrick Mc Sweeney | to renew app#2001/05/30/0203 for final inspection. | |
| Aug 13, 2001 | Expired or cancelled | 172 06th St | construct a concrete electrical valut under sidewalk outside of building envelope., | $13,000 | |
| May 30, 2001 | Completed | 172 06th St | Tadgh Patrick Mc Sweeney | to renew eprmit#2001/01/17/9917 in order to complete inspection. | $500 |
| May 25, 2001 | Expired or cancelled | 172 06th St | Gucho Plumbing | add sprinkler heads to ground level as per/plans | $2,000 |
| May 7, 2001 | Completed | 172 06th St | Northwest Security | installation of a fire alarm system for residential per cbc section 310.10 | $25,000 |
| Apr 13, 2001 | Expired or cancelled | 172 06th St | voluntary improvements to portion of (e)stairway (grnd flr to 2nd flr-200101179917 | $65,000 | |
| Jan 17, 2001 | Completed | 172 06th St | Tadgh Patrick Mc Sweeney | to renew permit#9717784 for final inspection & complete remaining work. | $2,000 |