Ncr Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Oct 2000 to Feb 2025
- Last 24 months
- 1 permit filed
94 permits since 2000: 67 completed, 1 in progress, 18 never finaled, 8 expired or cancelled.
Of the 18 never-finaled permits, 3 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 13 completed, 1 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2023 | Completed final sign-off Sep 2023 | 328 Tehama St | units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors.Details
units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors. | $155,000 |
| Feb 14, 2017 | Expired or cancelled cancelled Jan 2026 | 2750 Geary Bl | remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher naDetails
remodel and relocation of (e) kitchen, demolish (e) kitchen, replace resident rooms and bath into former kitchen space. demolish (e) dumbwaiter and renovate (e) nurse station. revise stair and closet area for accessible ramp. reuse existing kitchen hood, new duct to roof. maher na | $155,000 |
| Oct 6, 2016 | Completed final sign-off Sep 2018 | 2750 Geary Bl | 1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb...Details
1st flr: select demo of unit bathroom, sitting rm, closet, partition wall at activity rm & dining rm. renovate unit into 2 units. 2nd flr: select demo at stairs, dumbwaiter, recpt and unit bedrm new unit w/modification of (e) unit. revise prep area at dining. 3rd flr: select demo at stairs dumb... | $467,493 |
| Aug 15, 2016 | Completed final sign-off May 2018 | 2750 Geary Bl | demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs,Details
demolition of select interior wall to create 18 bedrooms, 16 bath for memory care residence. connect 2 wood frame bldgs, connect corridors to e g type 1 main bldg, build up floors of type 5 bldg to align with main bldg, including ramps for level chg, new mech,plumb, elec for new units /2 new stairs, | $1,200,000 |
| Jan 29, 2016 | Completed final sign-off Mar 2026 | 241 06th St | accesibility improvements, unit kitchen upgrades, window replacement, light fixture replacement, exterior paint, bathroom ventilation upgrade. emergency generator work (replacement and enclosure) for reference only and to be separate submittal.Details
accesibility improvements, unit kitchen upgrades, window replacement, light fixture replacement, exterior paint, bathroom ventilation upgrade. emergency generator work (replacement and enclosure) for reference only and to be separate submittal. | $325,000 |
| Jun 25, 2014 | Completed final sign-off Apr 2017 | 1441 Powell St | b/f & 1/f - work @ health services project includes interior partition relocation, ada upgrade to one bathroom, & replacement of (e) accoustic ceiling tile, selected areas of resilient flooring & base, selected doors, including ada hardware, & all existing lighting.Details
b/f & 1/f - work @ health services project includes interior partition relocation, ada upgrade to one bathroom, & replacement of (e) accoustic ceiling tile, selected areas of resilient flooring & base, selected doors, including ada hardware, & all existing lighting. | $50,000 |
| Jun 25, 2014 | Completed final sign-off Apr 2017 | 1441 Powell St | replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generatorDetails
replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generator | $2,500,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 115 Gates St | replacement of fixtures and finishes at bathroom and kitchen.Details
replacement of fixtures and finishes at bathroom and kitchen. | $20,000 |
| Oct 5, 2011 | Expired or cancelled expired Jun 2014 | 1525 Grant Av | replace existing finishes with new, replace in kind with new shower, toilets and sinks for common area residential restrooms (bathroom remodel)Details
replace existing finishes with new, replace in kind with new shower, toilets and sinks for common area residential restrooms (bathroom remodel) | $38,000 |
| Apr 9, 2010 | Completed final sign-off Aug 2010 | 321 Clementina St | demo (e) office space, elec. heating, lighting. add new partitions, door, lights, mech system, paint, carpet, sheet vinyl at (e) bathroomDetails
demo (e) office space, elec. heating, lighting. add new partitions, door, lights, mech system, paint, carpet, sheet vinyl at (e) bathroom | $15,000 |
| Feb 11, 2010 | Completed final sign-off May 2010 | 534 Broadway | bathroom remodel on 2nd floor. replace tub with shower pan and replace in kind on shower of mens common shower room. high efficacy lighting or occupancy sensor. no change to exhaust sytem.Details
bathroom remodel on 2nd floor. replace tub with shower pan and replace in kind on shower of mens common shower room. high efficacy lighting or occupancy sensor. no change to exhaust sytem. | $9,000 |
| Nov 5, 2009 | Completed final sign-off Mar 2010 | 4 Charlton Ct | bathroom remodel on the first floor. new tiles.Details
bathroom remodel on the first floor. new tiles. | $12,000 |
| Oct 23, 2009 | Completed final sign-off Feb 2010 | 534 Broadway | bathroom remodel, rework tubs & replace with shower pans, 2 bathrooms on 2nd & 3rd floors. sro common bathroom. work in 534 broadwayDetails
bathroom remodel, rework tubs & replace with shower pans, 2 bathrooms on 2nd & 3rd floors. sro common bathroom. work in 534 broadway | $25,000 |
| Sep 24, 2009 | Completed final sign-off Mar 2010 | 1607 Howard St | kitchen & bathroom remodel, window replacement @ front, water heater & space heater replacement.Details
kitchen & bathroom remodel, window replacement @ front, water heater & space heater replacement. | $47,000 |
| Jul 31, 2009 | Completed final sign-off Nov 2009 | 534 Broadway | bathroom remodel, remove tub, pan & replace with shower pan. 1 bathroom 3rd floor only.Details
bathroom remodel, remove tub, pan & replace with shower pan. 1 bathroom 3rd floor only. | $18,000 |
| Oct 13, 2000 | Completed final sign-off Jul 2001 | 220 Pierce St | maintenance repair,replace all windows in kind,reroof, bathroom & kitchen fans,dr hardwre,ext sidingDetails
maintenance repair,replace all windows in kind,reroof, bathroom & kitchen fans,dr hardwre,ext siding | $96,000 |