Block 0103, lot 004
1527 Grant Ave
- City’s use
- Commercial Hotel
- Built
- 1911
- Stories
- 3
- Units
- 3
- Rooms
- 8 bathrooms
- Building
- 12,690 sq ft
- Lot
- 3,950 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 24, 2024 | In progress filed Jan 2024, not yet issued | 1527 Grant Av | Bbi - Con Inc | revision to approved soft story permits 201809140185/1079. includes removing and replacing concrete sidewalk at public right of way and infilling 2 existing vaults under sidewalkDetails
revision to approved soft story permits 201809140185/1079. includes removing and replacing concrete sidewalk at public right of way and infilling 2 existing vaults under sidewalk | $50,000 |
| Dec 5, 2023 | Completed final sign-off Feb 2024 | 1527 Grant Av | Emkjer Enterprises Inc Dba Sign Co Usa | evacuation maps fabrication & installation (1st, 2nd, 3rd fl)Details
evacuation maps fabrication & installation (1st, 2nd, 3rd fl) | $3,300 |
| Oct 13, 2023 | Completed final sign-off Nov 2023 | 1527 Grant Av | Pac Integrations Inc | revision changes pa# 202206095963, per meeting w/sffd we ae making the following changes, add 3 strobes @ 1/f, add 5 horn strobes @ 1/f, add 2 horn strobes @ basement, add remote annunciator @ 1/f, removed all mps except 1 @ the facp, add maps @ remote annunciators @ annunciators.Details
revision changes pa# 202206095963, per meeting w/sffd we ae making the following changes, add 3 strobes @ 1/f, add 5 horn strobes @ 1/f, add 2 horn strobes @ basement, add remote annunciator @ 1/f, removed all mps except 1 @ the facp, add maps @ remote annunciators @ annunciators. | $30,000 |
| Sep 19, 2023 | Completed final sign-off Jan 2024 | 1527 Grant Av | Battalion One Fire Protection | ground fl. pendents to be switched to ur 1st fl. pendents to be flipped to ur add (1) in 2nd & 3rd fl. hallwlayDetails
ground fl. pendents to be switched to ur 1st fl. pendents to be flipped to ur add (1) in 2nd & 3rd fl. hallwlay | $38,000 |
| May 23, 2023 | Completed final sign-off Aug 2024 | 1527 Grant Av | Bbi - Con Inc | revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed.Details
revision to bpa#202010217056, common shared kitchen revisions on 2/f & 3/f, change appliances, shelving, sink type from original permit. no residential guestrooms will be removed. | $30,000 |
| Jun 9, 2022 | Completed final sign-off Nov 2023 | 1527 Grant Av | Pac Integrations Inc | fire only: modification of extg sprinkler monitoring system to accomodate 2 hi rooms. 33-l and 5-c. this will requre us to replace the extg facp & all extg devices. we will be installing nw lf horns in all residential units & nw sounders, and strobes, sd, and co detectors in the h.i. roomsDetails
fire only: modification of extg sprinkler monitoring system to accomodate 2 hi rooms. 33-l and 5-c. this will requre us to replace the extg facp & all extg devices. we will be installing nw lf horns in all residential units & nw sounders, and strobes, sd, and co detectors in the h.i. rooms | $80,000 |
| Oct 21, 2020 | Completed final sign-off Aug 2024 | 1527 Grant Av | Bbi - Con Inc | 100% affordable 34 sro units full non.structural rehabscope includes: new paint, flooring, fixtures, lighting, hardware in common area and units. mep duct work.(n)retrofit windows on flrs 2&3. wood on grant side & clad on cadel place. exterior paint no work performed in the public right of way.Details
100% affordable 34 sro units full non.structural rehabscope includes: new paint, flooring, fixtures, lighting, hardware in common area and units. mep duct work.(n)retrofit windows on flrs 2&3. wood on grant side & clad on cadel place. exterior paint no work performed in the public right of way. | $5,800,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2023 | 1527 Grant Av | Bbi - Con Inc | (comemrcial). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4Details
(comemrcial). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4 | $70,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2023 | 1527 Grant Av | Bbi - Con Inc | (residential). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4Details
(residential). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4 | $140,000 |
| Jun 25, 2013 | Completed final sign-off Sep 2013 | 1527 Grant Av | Castle Construction | to comply with ordinance 029-13 only- installation of grab bars in sro at the following locations. grab bars install for toilet rooms. 2 toilet rooms for each floor. total of 4 toilet rooms.Details
to comply with ordinance 029-13 only- installation of grab bars in sro at the following locations. grab bars install for toilet rooms. 2 toilet rooms for each floor. total of 4 toilet rooms. | $550 |
| Jan 24, 2012 | Never finaled issued Jan 2012, no final | 1525 Grant Av | street space & mta parking meter.Details
street space & mta parking meter. | ||
| Nov 28, 2011 | Never finaled issued Nov 2011, no final | 1527 Grant Av | Premium Roofing Waterproofing | reroofingDetails
reroofing | $20,000 |
| Oct 5, 2011 | Expired or cancelled expired Jun 2014 | 1525 Grant Av | Ncr Construction Inc | replace existing finishes with new, replace in kind with new shower, toilets and sinks for common area residential restrooms (bathroom remodel)Details
replace existing finishes with new, replace in kind with new shower, toilets and sinks for common area residential restrooms (bathroom remodel) | $38,000 |
| Jul 20, 2009 | Completed final sign-off Aug 2009 | 1525 Grant Av | Overnet Dba: Blue Pond Signs | install new double-sided , non illuminate projecting signDetails
install new double-sided , non illuminate projecting sign | $1,500 |
| Jun 4, 2004 | Never finaled issued Jun 2004, no final | 1527 Grant Av | San Francisco Fire Protection | add communicator to monitor (e) water flow deviceDetails
add communicator to monitor (e) water flow device | $1,000 |
| Mar 25, 2004 | Completed final sign-off Jul 2004 | 1525 Grant Av | Chen's Plumbing Inc | to comply sro hotel retroactive sprinkler installation ordinance 170-2 alleration the 0 4" existingDetails
to comply sro hotel retroactive sprinkler installation ordinance 170-2 alleration the 0 4" existing | $25,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.