- Jul 2000 to Jul 2025
73 permits since 2000 (engineer on 69 permits, architect on 3 permits, authorized agent-others on 2 permits, attorney on 1 permit): 57 completed, 2 in progress, 4 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2025 | In progress issued Feb 2026 | 1583 46th Av | Jlq Construction Inc | interior remodel of level 1, covert portions of existing garage area into bedroom, replace (e) windows in kind or sliding door, relocate tankless water heater, voluntary seismic upgrade by adding plywood sheathing throughout and sill boltsDetails
interior remodel of level 1, covert portions of existing garage area into bedroom, replace (e) windows in kind or sliding door, relocate tankless water heater, voluntary seismic upgrade by adding plywood sheathing throughout and sill bolts | $125,000 |
| Apr 11, 2025 | Expired or cancelled withdrawn Jun 2025 | 260 29th St | Centoni Restoration & Development | relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom.Details
relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom. | $98,500 |
| Aug 30, 2024 | Completed final sign-off May 2025 | 2576 Green St | Centoni Restoration & Development | bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls onlyDetails
bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls only | $50,000 |
| Jun 13, 2024 | Completed final sign-off Mar 2025 | 1077 Page St | Centoni Restoration & Development | interior renovation of the lower unit of a duplex bldg, and voluntary seismic strengthening of the lower floor and crawl space. removal of exist pop out structure at rear door.Details
interior renovation of the lower unit of a duplex bldg, and voluntary seismic strengthening of the lower floor and crawl space. removal of exist pop out structure at rear door. | $100,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 778 Kirkwood Av | Mulhall Construction Inc. | (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.Details
(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. | $10,000 |
| May 3, 2024 | In progress issued Oct 2024 | 754 Kirkwood Av | Mulhall Construction Inc. | (e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels.Details
(e) cmu trash enclosure to receive metal roof with metal column supports and metal infill panels. | $10,000 |
| Apr 4, 2024 | Completed final sign-off Jul 2025 | 740 Jerrold Av | the project consists of new construction of a boardwalk ramp and sloped walkways connecting 2 viewing platforms. the boardwalk ramp, sloped walkways and viewing platforms consist of plastic composite slip-resistant decking supported above the (e) grade. wooden railings with handrails and wire mesh..Details
the project consists of new construction of a boardwalk ramp and sloped walkways connecting 2 viewing platforms. the boardwalk ramp, sloped walkways and viewing platforms consist of plastic composite slip-resistant decking supported above the (e) grade. wooden railings with handrails and wire mesh.. | $970,000 | |
| May 31, 2023 | Completed final sign-off Dec 2023 | 777 Broadway | Bbi - Con Inc | revision to 202010015613. exterior: structural repairs/framing, new replacement in kind windows as nail fin, plaster in kind replacement associated waterproofing. voluntary removal of solar thermal system fromDetails
revision to 202010015613. exterior: structural repairs/framing, new replacement in kind windows as nail fin, plaster in kind replacement associated waterproofing. voluntary removal of solar thermal system from | $1,000,000 |
| Dec 27, 2022 | Completed final sign-off Sep 2026 | 580 Banks St | Saturn Construction Co | demo & relocate interior partitions.replace all siding & wdws.raised partial area of roof to add clerestory.add powder rm, relocate (e) bathrms & replace all fixtures.replace kitchen fixtures,int stair & floor finish,ext backyard stair & fence, add on grade wood deck.replace a portion of retainingDetails
demo & relocate interior partitions.replace all siding & wdws.raised partial area of roof to add clerestory.add powder rm, relocate (e) bathrms & replace all fixtures.replace kitchen fixtures,int stair & floor finish,ext backyard stair & fence, add on grade wood deck.replace a portion of retaining | $471,270 |
| Aug 1, 2022 | Completed final sign-off Jul 2023 | 1614 Fulton St | Centoni Restoration & Development | bathroom addition, kitchen renovation, removal or interior wall @ 1/f unitDetails
bathroom addition, kitchen renovation, removal or interior wall @ 1/f unit | $50,000 |
| Aug 1, 2022 | Completed final sign-off May 2023 | 3927 Cesar Chavez St | Centoni Restoration & Development | bathroom & kitchen renovation @3rd flDetails
bathroom & kitchen renovation @3rd fl | $60,000 |
| Mar 8, 2022 | Completed final sign-off Dec 2022 | 17 Loyola Tr | Centoni Restoration & Development | kitchen renovation, post & footing addition. upper unit.Details
kitchen renovation, post & footing addition. upper unit. | $90,000 |
| Mar 8, 2022 | Completed final sign-off Dec 2022 | 15 Loyola Tr | Centoni Restoration & Development | lower unit. kitchen renovation, powder room addition and reinforcement of rear mud room.Details
lower unit. kitchen renovation, powder room addition and reinforcement of rear mud room. | $180,000 |
| Sep 13, 2021 | Expired or cancelled cancelled Jan 2026 | 1250 Jones St | Level 8 Construction Inc | #1801: add washer & dryer (220v electric), ventless type. (kitchen remodel under pa# 202108136444)Details
#1801: add washer & dryer (220v electric), ventless type. (kitchen remodel under pa# 202108136444) | $4,500 |
| Dec 23, 2020 | Completed final sign-off Apr 2021 | 533 Noe St | Centoni Restoration & Development | voluntary plywood sheathing addition at first floor.Details
voluntary plywood sheathing addition at first floor. | $10,000 |
| Dec 17, 2020 | Completed final sign-off May 2021 | 969 Page St | Centoni Restoration & Development | garage door & frame was hit by car. project consists of wall repair. existing brick foundation under repaired wall segments will be replaced with concrete footings.Details
garage door & frame was hit by car. project consists of wall repair. existing brick foundation under repaired wall segments will be replaced with concrete footings. | $10,000 |
| Oct 31, 2020 | Expired or cancelled cancelled Aug 2022 | 919 Excelsior Av | ground floor bedroom & bathroom renovation, and reconstruction of interior staircase to be up to code.Details
ground floor bedroom & bathroom renovation, and reconstruction of interior staircase to be up to code. | $50,000 | |
| Oct 28, 2020 | Completed final sign-off Mar 2023 | 1204 Mason St | Bbi - Con Inc | 100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use.Details
100% affor. rehab of 24 units. interior: (n) paint, floors, fixtures, cabinetry, door hardware, lighting, countertops. mep (n) ducting for range exahust. exterior work is patch and repair. sprinklers, alarms & solar thermal panels & water storage tanks, under separate permit. no change to occ./use. | $7,600,000 |
| Oct 1, 2020 | Completed final sign-off Dec 2023 | 777 Broadway | Bbi - Con Inc | rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use.Details
rehab/repair of 31 units work to include: (n) mep-lighting, electrical and plumbing. (n) fixtures, cabinets, shelves, & countertops. (n) retrofit windows, sprinklers, alarms & solar thermal panels & water tanks, under separate permit. no change to occupancy or use. | $6,100,000 |
| Aug 21, 2020 | Never finaled issued Sep 2021, no final | 1434 Dolores St | A L Martin Construction | vertical addition containing new master suite at 3rd flr. horizontal addition at rear of 1st flr. provide new stair at front of building and new deck at rear of building. provide seismic upgrade and new fire sprinkler system throughout (sprinkler on separate submittal).Details
vertical addition containing new master suite at 3rd flr. horizontal addition at rear of 1st flr. provide new stair at front of building and new deck at rear of building. provide seismic upgrade and new fire sprinkler system throughout (sprinkler on separate submittal). | $483,836 |
| Feb 7, 2020 | Completed final sign-off Sep 2020 | 953 Haight St | Centoni Restoration & Development | voluntary seismic strengthening of rear wall and trellis additionDetails
voluntary seismic strengthening of rear wall and trellis addition | $75,000 |
| Oct 29, 2019 | Completed final sign-off Mar 2020 | 953 Haight St | Centoni Restoration & Development | replacement of an undersize wood beam with a new steel beam over garageDetails
replacement of an undersize wood beam with a new steel beam over garage | $10,000 |
| Jul 19, 2019 | Completed final sign-off May 2021 | 177 Warren Dr | Ftan General Construction | bathroom remodel, kitchen, bath & sunroon renovation, window & door replacement.Details
bathroom remodel, kitchen, bath & sunroon renovation, window & door replacement. | $150,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2023 | 1527 Grant Av | Bbi - Con Inc | (residential). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4Details
(residential). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4 | $140,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2023 | 1527 Grant Av | Bbi - Con Inc | (comemrcial). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4Details
(comemrcial). ab-004 housing project-soft story retrofit 2016 cebc appendix a-4 | $70,000 |
| Sep 14, 2018 | Never finaled issued Aug 2022, no final | 534 Broadway | commercial. ab-004 housing project. soft story retrofit 2016 cebc appendix a-4 (commercial)Details
commercial. ab-004 housing project. soft story retrofit 2016 cebc appendix a-4 (commercial) | $70,000 | |
| Sep 14, 2018 | Completed final sign-off Nov 2022 | 1204 Mason St | Bbi - Con Inc | commercial. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a.Details
commercial. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a. | $50,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2022 | 1204 Mason St | Bbi - Con Inc | residential. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a.Details
residential. ab-004. priority permit processing. soft story retrofit per sfebc chapter 4d engineering criteriia 2016 cebc appendix a-4. maher n/a. | $150,000 |
| Sep 14, 2018 | Never finaled issued Aug 2022, no final | 534 Broadway | **residential**. ab-004 housing project. soft story retrofit 2016 cebc appendix a-4 (residential)Details
**residential**. ab-004 housing project. soft story retrofit 2016 cebc appendix a-4 (residential) | $140,000 | |
| Feb 12, 2018 | Expired or cancelled withdrawn Jun 2019 | 2835 Vallejo St | The Fine European Construction/Uwb Dober | (garage) horizontal expansion to the rear side of an existing detached garage. a new living roof at the garage to be provided. mep system to be design build.Details
(garage) horizontal expansion to the rear side of an existing detached garage. a new living roof at the garage to be provided. mep system to be design build. | $101,704 |
| Sep 15, 2017 | Completed final sign-off Oct 2020 | 100 Alta St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, adding shearwalls to 1/fDetails
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4, adding shearwalls to 1/f | $75,000 | |
| Sep 7, 2017 | Completed final sign-off Jan 2019 | 2093 Golden Gate Av | Centoni Restoration & Development | the project is a center light well infill with a ground floor deck. the deck will be adjacent to a blank, windowless and doorless wall. the deck is approx 7ft off the ground and accessible from the existing laundry room. approx.60 sq of deckDetails
the project is a center light well infill with a ground floor deck. the deck will be adjacent to a blank, windowless and doorless wall. the deck is approx 7ft off the ground and accessible from the existing laundry room. approx.60 sq of deck | $15,000 |
| Aug 22, 2017 | Completed final sign-off Nov 2017 | 2089 Golden Gate Av | Centoni Restoration & Development | infill of interior lightwell for a new 1/2 bathDetails
infill of interior lightwell for a new 1/2 bath | $15,000 |
| Jul 11, 2017 | Completed final sign-off Feb 2018 | 2093 Golden Gate Av | Centoni Restoration & Development | infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration.Details
infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration. | $50,000 |
| Nov 16, 2016 | Completed final sign-off Jan 2020 | 1988 Bush St | Goodman Construction & Design Co | int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openingsDetails
int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openings | $100,000 |
| Nov 16, 2016 | Expired or cancelled withdrawn Apr 2021 | 53 Clifford Tr | infill of space below (e) deck & remodel of unconditioned basement area to create a guest room, office/workout space & one new bthroom. new deck & stair at main (1st) floor. new patio & landscaping/ retaining walls @ rear.Details
infill of space below (e) deck & remodel of unconditioned basement area to create a guest room, office/workout space & one new bthroom. new deck & stair at main (1st) floor. new patio & landscaping/ retaining walls @ rear. | $180,000 | |
| Jul 22, 2016 | Completed final sign-off Feb 2017 | 280 Divisadero St | Centoni Restoration & Development | revision to permit # 201605026258, add scope: local structural strengthening of existing sun room and replace foundation under existing posts supporting bay window at south face of bgldg. per plan.Details
revision to permit # 201605026258, add scope: local structural strengthening of existing sun room and replace foundation under existing posts supporting bay window at south face of bgldg. per plan. | $10,000 |
| May 20, 2016 | Completed final sign-off Apr 2018 | 106 Mateo St | S A Baxter Inc. | convert portion of (e) g/f to (n) bath, laundry room & bedroom, remodel (e) kitchen (2/f) & bath (3/f). no change to building envelope, no work visable from public right of way, total (n) conditioned living space 458 sq.ft.Details
convert portion of (e) g/f to (n) bath, laundry room & bedroom, remodel (e) kitchen (2/f) & bath (3/f). no change to building envelope, no work visable from public right of way, total (n) conditioned living space 458 sq.ft. | $295,000 |
| May 3, 2016 | Completed final sign-off Jun 2017 | 487 29th St | Blair Burke General Contractors Inc | addition of a 2-story rear deck and patio at rear yard, 2 windows to be removed and replaced with doors, to access decks. existing stair and door on west side to be removed.Details
addition of a 2-story rear deck and patio at rear yard, 2 windows to be removed and replaced with doors, to access decks. existing stair and door on west side to be removed. | $67,000 |
| May 2, 2016 | Completed final sign-off Feb 2017 | 280 Divisadero St | Kenneally Construction, Centoni Restoration & Development | foundation replacemetn and local structural strengthening at basement level. no exterior work. seismic upgrade basement level.Details
foundation replacemetn and local structural strengthening at basement level. no exterior work. seismic upgrade basement level. | $75,000 |
| Mar 30, 2016 | Completed final sign-off Dec 2017 | 40 Clifford Tr | Devlin/Mcnally Construction | rear accessory bldg-(block 2618a/lot 027) renovate of (e) detached garage at rear to a multipurpose rec. room space w/powder room. work includes reinforcing/replacing (e) finishes, slab & framing to meet code, add insulation, skylight & replace roof. new windows/doors & a sunken patio with planters.Details
rear accessory bldg-(block 2618a/lot 027) renovate of (e) detached garage at rear to a multipurpose rec. room space w/powder room. work includes reinforcing/replacing (e) finishes, slab & framing to meet code, add insulation, skylight & replace roof. new windows/doors & a sunken patio with planters. | $135,000 |
| Mar 29, 2016 | Completed final sign-off Oct 2016 | 73 Webster St | Handy Construction Team Inc | soft story retrofit at garage level - sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit at garage level - sfbc chapter 34b, 2012 iebc appendix a-4. | $10,000 |
| Mar 16, 2016 | Completed final sign-off Jun 2016 | 1636 Diamond St | Saturn Construction Co | replacement/repair of water damaged joists, install head-out beam.Details
replacement/repair of water damaged joists, install head-out beam. | $5,000 |
| Mar 4, 2016 | Completed final sign-off Nov 2016 | 31 Claremont Bl | Centoni Restoration & Development | interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms.Details
interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms. | $50,000 |
| Mar 4, 2016 | Expired or cancelled cancelled Jan 2026 | 7 Hill Point Av | building a retaining wall in the backyard.Details
building a retaining wall in the backyard. | $70,000 | |
| Nov 20, 2015 | Completed final sign-off May 2017 | 646 12th Av | Centoni Restoration & Development | interior renovation at 2nd level, new deck at rear yard, add voluntary strengthening, per plans.Details
interior renovation at 2nd level, new deck at rear yard, add voluntary strengthening, per plans. | $50,000 |
| Sep 30, 2015 | Completed final sign-off Apr 2017 | 3037 Market St | Gil Construction & Assoc Inc. | strengthening of garage floor and seismic strengthening of exterior shear walls.Details
strengthening of garage floor and seismic strengthening of exterior shear walls. | $50,000 |
| Aug 27, 2015 | Completed final sign-off Dec 2015 | 300 Douglass St | revision to app#201504133425. soft story retrofit per sfbc chapter 34b. revised simpson moment frame and minor shearwall changes from field conditions.Details
revision to app#201504133425. soft story retrofit per sfbc chapter 34b. revised simpson moment frame and minor shearwall changes from field conditions. | ||
| Aug 24, 2015 | Completed final sign-off Dec 2015 | 2306 Leavenworth St | in kind repair of wood rotted members on 1st two levels of (e) 3 story rear deck. replacement of existing post footings.Details
in kind repair of wood rotted members on 1st two levels of (e) 3 story rear deck. replacement of existing post footings. | $5,000 | |
| Aug 3, 2015 | Completed final sign-off Jul 2018 | 2077 Jackson St | Sgdm Llc | common area- soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4Details
common area- soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4 | $20,000 |
| Jun 23, 2015 | Completed final sign-off Oct 2015 | 50 Mclaren Av | Saturn Construction Co | in-kind replacement of existing steel & wood framed deck at rear of house.Details
in-kind replacement of existing steel & wood framed deck at rear of house. | $10,000 |
| Jun 12, 2015 | Completed final sign-off Apr 2016 | 4930 17th St | Dijeau Poage Construction Inc. | renovation of e 2 units residential at 1st, 2nd fl. 25 % reallocation of 1st fl unit 4932, new kitchen and interior stair. removal of exterior statirs, new terrace at rear, replace doors and windows at 1st flDetails
renovation of e 2 units residential at 1st, 2nd fl. 25 % reallocation of 1st fl unit 4932, new kitchen and interior stair. removal of exterior statirs, new terrace at rear, replace doors and windows at 1st fl | $150,000 |
| Apr 13, 2015 | Completed final sign-off May 2016 | 300 Douglass St | soft story retrofit of basement floor. 2012 iebc appendix a-4Details
soft story retrofit of basement floor. 2012 iebc appendix a-4 | $38,000 | |
| Dec 24, 2014 | Completed final sign-off Mar 2019 | 3312 17th St | Eignor Construction Inc. | to comply with nov 201333381. repair fire damage, seismic upgrade install automatic fire sprinkler system and reconfigure exit stairs for code compliance. sprinklers under separate permit.Details
to comply with nov 201333381. repair fire damage, seismic upgrade install automatic fire sprinkler system and reconfigure exit stairs for code compliance. sprinklers under separate permit. | $150,000 |
| Aug 26, 2014 | Expired or cancelled cancelled Mar 2020 | 69 Uranus Tr | Blair Burke General Contractors Inc | new wood slat screen at street elevation.Details
new wood slat screen at street elevation. | $25,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2015 | 2250 Jerrold Av | Expert Design Builders | add accessory dwelling unit within existing artist studio. requires certificate of final completion & occupancy (cfc) for change of use from b to b/r-3. planning considered accessory unit. bldg considered as mixed use, not as live/work. all work within unit #13. (n) windows. interior remodel.Details
add accessory dwelling unit within existing artist studio. requires certificate of final completion & occupancy (cfc) for change of use from b to b/r-3. planning considered accessory unit. bldg considered as mixed use, not as live/work. all work within unit #13. (n) windows. interior remodel. | $90,000 |
| Mar 26, 2014 | Completed final sign-off Dec 2014 | 501 Rhode Island St | extg dwelling unit of 2 story wood framed structure. the project involves a lower level renovation to create additional living, sleeping, and bathroom spaces behind garage. project involves reconfigure of extg stairway between 1st and 2nd floors. & replacement of 2 extg street facing windows.Details
extg dwelling unit of 2 story wood framed structure. the project involves a lower level renovation to create additional living, sleeping, and bathroom spaces behind garage. project involves reconfigure of extg stairway between 1st and 2nd floors. & replacement of 2 extg street facing windows. | $80,000 | |
| Mar 12, 2014 | Completed final sign-off Feb 2015 | 69 Uranus Tr | Blair Burke General Contractors Inc | remodel kitchen & existing bathrooms, expansion of existing basement level room to create new bedroom & bth. no changes to exterior.Details
remodel kitchen & existing bathrooms, expansion of existing basement level room to create new bedroom & bth. no changes to exterior. | $95,000 |
| Feb 10, 2014 | Completed final sign-off Jul 2015 | 1155 Church St | revision to appl #2013.12.05.3445- repair portion of exisitng rear deck egress staris & 3rd floor framing & repair portion of kitchen floor at existing 3rd floor per correction notice.Details
revision to appl #2013.12.05.3445- repair portion of exisitng rear deck egress staris & 3rd floor framing & repair portion of kitchen floor at existing 3rd floor per correction notice. | $500 | |
| Dec 30, 2013 | Expired or cancelled expired Apr 2017 | 870 Noe St | Phase 2 Builders | addition of allowed 2nd dwelling unit within existing envelope, remodel partial basement floor. new sidelite and sliding door on rear elevation. (no work at existing 1st and 2nd floors)Details
addition of allowed 2nd dwelling unit within existing envelope, remodel partial basement floor. new sidelite and sliding door on rear elevation. (no work at existing 1st and 2nd floors) | $100,000 |
| Nov 20, 2013 | Completed final sign-off May 2016 | 3112 Washington St | Cardea Bldg Dba Dimension Design Group, Associated Trucking Inc | crawl space excavation of single family home. scope includes new sub grade space with new stairs to main floor project also includes voluntary structural upgrades. new bedroom and family room on garage level. sub contractor (assoc. trucking inc.) will do excavation.Details
crawl space excavation of single family home. scope includes new sub grade space with new stairs to main floor project also includes voluntary structural upgrades. new bedroom and family room on garage level. sub contractor (assoc. trucking inc.) will do excavation. | $350,000 |
| Jul 25, 2013 | Never finaled issued Oct 2013, no final | 2205 Sacramento St | work in common area only- retaining wall repairDetails
work in common area only- retaining wall repair | $30,000 | |
| Jul 3, 2013 | Completed final sign-off Oct 2013 | 3876 Clay St | proposed project includes removal of existing roof deck and replacement with a new wood roof deck not to exceed 500 sq. ft.Details
proposed project includes removal of existing roof deck and replacement with a new wood roof deck not to exceed 500 sq. ft. | $20,000 | |
| Mar 6, 2012 | Completed final sign-off Mar 2015 | 2331 Lake St | A Complete Construction Company | garage renovation, window replacement, stucco replacement, front curb & gate replacement (within property line) partial voluntary strengthening.Details
garage renovation, window replacement, stucco replacement, front curb & gate replacement (within property line) partial voluntary strengthening. | $100,000 |
| Jan 10, 2012 | Completed final sign-off Jul 2012 | 447 Clipper St | Aran Construction | revision to appl #201103021253 - submitted shotcrete drawings with placement of rebars per engineer in compliance with 106.33. all shotcrete placed was 4000 psi per engineer.Details
revision to appl #201103021253 - submitted shotcrete drawings with placement of rebars per engineer in compliance with 106.33. all shotcrete placed was 4000 psi per engineer. | |
| Dec 13, 2011 | Completed final sign-off Jul 2012 | 3719 Folsom St | David Edward Conroy | voluntary strengthening of the building. legalize (e) bedroom on garage level.Details
voluntary strengthening of the building. legalize (e) bedroom on garage level. | $8,000 |
| Aug 4, 2010 | Completed final sign-off Nov 2010 | 144 Laidley St | Traditional Homes Inc | renovation of the existing kitchen in the house, removal of partition walls & one load-bearing wall which will be replaced by a header & two posts. add new cabinets, appliances & lighting.Details
renovation of the existing kitchen in the house, removal of partition walls & one load-bearing wall which will be replaced by a header & two posts. add new cabinets, appliances & lighting. | $50,000 |
| Apr 1, 2010 | Completed final sign-off Jul 2010 | 866 Rhode Island St | Rise Construction | remove (e) slab on ground level of bldg. & install (n) with radiant heat tubing. frame (n) shear walls. install thee windows in (e) locations. install two windows in (n) locations. install (n) lighting & plugs per plan. install one toilet & sing in small powder room.Details
remove (e) slab on ground level of bldg. & install (n) with radiant heat tubing. frame (n) shear walls. install thee windows in (e) locations. install two windows in (n) locations. install (n) lighting & plugs per plan. install one toilet & sing in small powder room. | $100,000 |
| May 4, 2009 | Completed final sign-off Nov 2009 | 654 Vermont St | Saturn Construction Co | comply with report of physical inspection cc5438. upgrade electrical, plumbing, and mechanical per report. reinforce 2 decks, repair stairDetails
comply with report of physical inspection cc5438. upgrade electrical, plumbing, and mechanical per report. reinforce 2 decks, repair stair | $25,000 |
| Dec 12, 2008 | Completed final sign-off Jun 2009 | 905 Kansas St | Christopher's Construction Inc | full kitchen remodel w/ structural change, full master bath remodel, partial gues bath remodel. built-in cabinetry, lighting upgrade at 1st floor per plan.Details
full kitchen remodel w/ structural change, full master bath remodel, partial gues bath remodel. built-in cabinetry, lighting upgrade at 1st floor per plan. | $75,000 |
| Dec 19, 2006 | Expired or cancelled expired Jun 2007 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | renew pa# 200503016474 for final inspection.Details
renew pa# 200503016474 for final inspection. | |
| Jul 24, 2006 | Completed final sign-off Jan 2007 | 4348 17th St | remove (e) retaining walls. replace with new retaining walls. provide new french drains. connect to city sewer.Details
remove (e) retaining walls. replace with new retaining walls. provide new french drains. connect to city sewer. | $20,000 | |
| Jul 26, 2000 | Expired or cancelled expired Jun 2001 | 2909 California St | underpinning for ajacent properties/per app #992577s1Details