Block 3584, lot 072
533 Noe St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,885 sq ft
- Lot
- 2,622 sq ft
- Zoning
- RH3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 17, 2023 | Completed final sign-off Mar 2023 | 533 Noe St | Centoni Restoration & Development | bathroom remodel in-kind new tile, fan, lighting, fixtures and cabinetryDetails
bathroom remodel in-kind new tile, fan, lighting, fixtures and cabinetry | $25,000 |
| Dec 23, 2020 | Completed final sign-off Apr 2021 | 533 Noe St | Centoni Restoration & Development | voluntary plywood sheathing addition at first floor.Details
voluntary plywood sheathing addition at first floor. | $10,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 533 Noe St | Centoni Restoration & Development | kitchen remodel in-kind. new cabinets, appliances, counter top, flooring.Details
kitchen remodel in-kind. new cabinets, appliances, counter top, flooring. | $7,500 |
| May 1, 2014 | Never finaled issued May 2014, no final | 533 Noe St | Custom Construction Enterprises | renovation of existing single family house, renovate bathroom includes enclosing of (e) lightwell, not visible from adjacent properties, add a new bathroom at an (e) closet, enlarge (e) closet, new parapet adjacent to new skylight.Details
renovation of existing single family house, renovate bathroom includes enclosing of (e) lightwell, not visible from adjacent properties, add a new bathroom at an (e) closet, enlarge (e) closet, new parapet adjacent to new skylight. | $65,000 |
| Sep 30, 2011 | Completed final sign-off Jun 2012 | 533 Noe St | O'neill & Neville Construction Inc | removal of partial damage to exterior deck, guard rail to be brought up to code, work is definitely less than 50% of structure in kindDetails
removal of partial damage to exterior deck, guard rail to be brought up to code, work is definitely less than 50% of structure in kind | $2,500 |
| Aug 19, 2010 | Completed final sign-off Nov 2010 | 533 Noe St | remove existing transite wall shingles, retain existing wood siding, replace trim and decorative features. retain existing stair structure, replace in kind stair railing, balistrate, threads, risers. all decorative work. no structural, elec,plumbing. all work at front facade.Details
remove existing transite wall shingles, retain existing wood siding, replace trim and decorative features. retain existing stair structure, replace in kind stair railing, balistrate, threads, risers. all decorative work. no structural, elec,plumbing. all work at front facade. | $25,000 | |
| May 29, 2009 | Completed final sign-off Jun 2009 | 533 Noe St | renew pa# 2007/12/04/9620 to obtain final inspection. all work has been completed.Details
renew pa# 2007/12/04/9620 to obtain final inspection. all work has been completed. | ||
| Feb 14, 2008 | Completed final sign-off Jun 2009 | 533 Noe St | Professional Concrete Work | convert an existing basement into a new garage, sitting room, bathroom & indoor staircase from basement/ garage floor to 1st floor. new curb cut, driveway & retaining wall with guard rail on top of retaining wall for new driveway. construct garage entry monent frameDetails
convert an existing basement into a new garage, sitting room, bathroom & indoor staircase from basement/ garage floor to 1st floor. new curb cut, driveway & retaining wall with guard rail on top of retaining wall for new driveway. construct garage entry monent frame | $30,000 |
| Dec 4, 2007 | Expired or cancelled expired Jun 2009 | 533 Noe St | Professional Concrete Work | replace existing brick foundation. install plywood shear panels all walls @ basmeent level. hold-down, replace girder and post with bearing wall. poor new concrete slab in basement. no change to existing building height and envelope.Details
replace existing brick foundation. install plywood shear panels all walls @ basmeent level. hold-down, replace girder and post with bearing wall. poor new concrete slab in basement. no change to existing building height and envelope. | $43,000 |
| Jun 8, 2007 | Completed final sign-off Jul 2007 | 533 Noe St | rear yard retaining wall-in respone to nov item 3Details
rear yard retaining wall-in respone to nov item 3 | $1,000 | |
| Dec 22, 2006 | Completed final sign-off Jul 2007 | 533 Noe St | to comply nov#200685683, replace tub, sink, shower head, faucets, floor and wall tiles in bathroom & water closet. replace kitchen sink, faucets & counter top. no structural work done.Details
to comply nov#200685683, replace tub, sink, shower head, faucets, floor and wall tiles in bathroom & water closet. replace kitchen sink, faucets & counter top. no structural work done. | $7,000 | |
| Mar 17, 2003 | Completed final sign-off Oct 2003 | 533 Noe St | demolish /remove/ lower unit create storage spaceDetails
demolish /remove/ lower unit create storage space | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Centoni Restoration & Development (3), Professional Concrete Work (2), Custom Construction Enterprises, O'neill & Neville Construction Inc
- Architects
- Killian O'sullivan
- Engineers
- Arthur Dell, Michael Hom, Stanley Wu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.