- 15 permits filed
114 permits since 2000: 93 completed, 8 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 114.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 432 Lawton St | new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry.Details
new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry. | $50,000 |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 279 Diamond St | horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard.Details
horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard. | $100,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 300 Castro St | renovate, in-kind, 2 ea bathrooms - new tile, faucents, fixtures, fans & lighting. no structural modificationsDetails
renovate, in-kind, 2 ea bathrooms - new tile, faucents, fixtures, fans & lighting. no structural modifications | $75,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 279 Diamond St | interior remodel, remove rear deck and stairs, convert 661 sf of storage at garage to habitable space. no expansion of (e) building envelope.Details
interior remodel, remove rear deck and stairs, convert 661 sf of storage at garage to habitable space. no expansion of (e) building envelope. | $180,000 |
| May 19, 2026 | In progress issued May 2026 | 3956 Washington St | voluntary seismic upgrade and limited gravity framing reinforcement at 1st and 2nd floor. no change in use. occupancy or floor area.Details
voluntary seismic upgrade and limited gravity framing reinforcement at 1st and 2nd floor. no change in use. occupancy or floor area. | $75,000 |
| May 15, 2026 | In progress issued May 2026 | 3956 Washington St | replace select windows (24) and (4) exterior door where noted. fill in select windows (4) as shown on plans. reduce gaarage depth.Details
replace select windows (24) and (4) exterior door where noted. fill in select windows (4) as shown on plans. reduce gaarage depth. | $30,000 |
| May 8, 2026 | Completed final sign-off Aug 2026 | 2576 Green St | bathroom renovation in-kind. new lighting, fan, shower pan, tile, drywall and insulation.Details
bathroom renovation in-kind. new lighting, fan, shower pan, tile, drywall and insulation. | $30,000 |
| Jan 30, 2026 | In progress issued Mar 2026 | 3956 Washington St | interior remodel at all 4 floors, existing storage at 1st floor to be converted to new habitable space (796 sq ft). no structural work. all work within existing building envelope.Details
interior remodel at all 4 floors, existing storage at 1st floor to be converted to new habitable space (796 sq ft). no structural work. all work within existing building envelope. | $967,936 |
| Jul 25, 2025 | Completed final sign-off Apr 2026 | 1120 Elm St | bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls.Details
bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls. | $80,000 |
| Jul 8, 2025 | Completed final sign-off Mar 2026 | 260 29th St | bathroom renovation in-kind. new tub, valves, vanity sink and toilet, new tile. no removal of wallsDetails
bathroom renovation in-kind. new tub, valves, vanity sink and toilet, new tile. no removal of walls | $20,000 |
| Jun 20, 2025 | Completed final sign-off Mar 2026 | 260 29th St | renovate (e) kitchen in kind. new cabinets. stone counter tops, appliances, electrical & plumbing up to codeDetails
renovate (e) kitchen in kind. new cabinets. stone counter tops, appliances, electrical & plumbing up to code | $80,000 |
| Jun 18, 2025 | Completed final sign-off Nov 2025 | 2576 Green St | structural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interiorDetails
structural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interior | $60,000 |
| May 1, 2025 | In progress issued May 2025 | 3600 Jackson St | repair existing terrace, replace waterproof membrane. install/ replace tile, in kind, not street visible.Details
repair existing terrace, replace waterproof membrane. install/ replace tile, in kind, not street visible. | $25,000 |
| Apr 11, 2025 | Expired or cancelled withdrawn Jun 2025 | 260 29th St | relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom.Details
relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom. | $98,500 |
| Feb 7, 2025 | Completed final sign-off Aug 2025 | 538 Baker St | modification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior wallsDetails
modification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior walls | $7,000 |
| Aug 30, 2024 | Completed final sign-off May 2025 | 2576 Green St | bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls onlyDetails
bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls only | $50,000 |
| Jul 8, 2024 | Completed final sign-off Dec 2024 | 82 El Sereno Ct | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $25,000 |
| Jun 13, 2024 | Completed final sign-off Mar 2025 | 1077 Page St | interior renovation of the lower unit of a duplex bldg, and voluntary seismic strengthening of the lower floor and crawl space. removal of exist pop out structure at rear door.Details
interior renovation of the lower unit of a duplex bldg, and voluntary seismic strengthening of the lower floor and crawl space. removal of exist pop out structure at rear door. | $100,000 |
| May 13, 2024 | Completed final sign-off Aug 2024 | 662 Cole St | in-kind kitchen renovation. new cabinets, appliances, lighting, plumbing fixtures. no modification to walls, structure.Details
in-kind kitchen renovation. new cabinets, appliances, lighting, plumbing fixtures. no modification to walls, structure. | $75,000 |
| Aug 3, 2023 | Completed final sign-off Jan 2024 | 2576 Green St | revision to 202212158394. changing east side deck rail from glass to solid half wall, widening the curbs supporting the glass rails, and voluntary seismic bracing of the brick chimney.Details
revision to 202212158394. changing east side deck rail from glass to solid half wall, widening the curbs supporting the glass rails, and voluntary seismic bracing of the brick chimney. | |
| Jun 20, 2023 | Completed final sign-off Sep 2023 | 137 Jordan Av | renovate (2) each existing bathrooms, in kind. new lights, fixtures, faucets, tile, cabinets. no structural changers.Details
renovate (2) each existing bathrooms, in kind. new lights, fixtures, faucets, tile, cabinets. no structural changers. | $75,000 |
| Apr 17, 2023 | Completed final sign-off Aug 2023 | 354 Arguello Bl | remodel bathroom - in kind. new fixtures, tile, lighting, cabinetry, fan. no removal of wallsDetails
remodel bathroom - in kind. new fixtures, tile, lighting, cabinetry, fan. no removal of walls | $30,000 |
| Feb 3, 2023 | Completed final sign-off Dec 2023 | 1360 Fulton St | kitchen & laundry room renovation; relocating rear door & window; alteration to ground floor deck @ backyard; in addition to the project, includes voluntary seismic strengthening to gl1 & gl1.6 of lower unit. revision to reduce rear deck to landing.Details
kitchen & laundry room renovation; relocating rear door & window; alteration to ground floor deck @ backyard; in addition to the project, includes voluntary seismic strengthening to gl1 & gl1.6 of lower unit. revision to reduce rear deck to landing. | $80,000 |
| Jan 17, 2023 | Completed final sign-off Mar 2023 | 533 Noe St | bathroom remodel in-kind new tile, fan, lighting, fixtures and cabinetryDetails
bathroom remodel in-kind new tile, fan, lighting, fixtures and cabinetry | $25,000 |
| Dec 15, 2022 | Completed final sign-off Jan 2024 | 2576 Green St | replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl.Details
replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl. | $80,000 |
| Aug 30, 2022 | Completed final sign-off Dec 2022 | 79 Gaviota Wy | in-kind kitchen remodel = new cabinets, appliances, lighting, tile + counter top. non structural.Details
in-kind kitchen remodel = new cabinets, appliances, lighting, tile + counter top. non structural. | $45,000 |
| Aug 16, 2022 | Completed final sign-off Dec 2022 | 18 Castro St | one bathroom in kind remodel. tile, faucets, fixtures, fan lighting, and cabinetry. non structural.Details
one bathroom in kind remodel. tile, faucets, fixtures, fan lighting, and cabinetry. non structural. | $25,000 |
| Aug 1, 2022 | Completed final sign-off Jul 2023 | 1614 Fulton St | bathroom addition, kitchen renovation, removal or interior wall @ 1/f unitDetails
bathroom addition, kitchen renovation, removal or interior wall @ 1/f unit | $50,000 |
| Aug 1, 2022 | Completed final sign-off May 2023 | 3927 Cesar Chavez St | bathroom & kitchen renovation @3rd flDetails
bathroom & kitchen renovation @3rd fl | $60,000 |
| Apr 19, 2022 | Completed final sign-off Oct 2022 | 6418 California St | remodel one (e) kitchen in kind. new cabinets, appliances, lighting & flooring. no change to existing layout.Details
remodel one (e) kitchen in kind. new cabinets, appliances, lighting & flooring. no change to existing layout. | $50,000 |
| Mar 8, 2022 | Completed final sign-off Dec 2022 | 17 Loyola Tr | kitchen renovation, post & footing addition. upper unit.Details
kitchen renovation, post & footing addition. upper unit. | $90,000 |
| Mar 8, 2022 | Completed final sign-off Dec 2022 | 15 Loyola Tr | lower unit. kitchen renovation, powder room addition and reinforcement of rear mud room.Details
lower unit. kitchen renovation, powder room addition and reinforcement of rear mud room. | $180,000 |
| Dec 3, 2021 | Completed final sign-off Mar 2022 | 6418 California St | remodel existing bathroom in kind. new fixtures, faucets, exhaust fan, lighting and tile. no layout change, no wall stud framing demo.Details
remodel existing bathroom in kind. new fixtures, faucets, exhaust fan, lighting and tile. no layout change, no wall stud framing demo. | $30,000 |
| Aug 26, 2021 | Completed final sign-off Oct 2022 | 1618 Fulton St | interior renovation on 2nd fl consisting of new laundry closet and kitchen relocationDetails
interior renovation on 2nd fl consisting of new laundry closet and kitchen relocation | $50,000 |
| Aug 19, 2021 | Completed final sign-off Apr 2023 | 2307 Broadway | remodel of existing bathroom on 3rd fl and repair of damaged framingDetails
remodel of existing bathroom on 3rd fl and repair of damaged framing | $50,000 |
| Jun 29, 2021 | Completed final sign-off Sep 2021 | 1259 Stanyan St | in-kind bathroom remodel, new tile, banity, fan lighting, plumbing fixtures.Details
in-kind bathroom remodel, new tile, banity, fan lighting, plumbing fixtures. | $30,000 |
| May 10, 2021 | Completed final sign-off Oct 2021 | 82 El Sereno Ct | remodel kitchen, in kind. new appliances, cabinets, lighting, tile, countertop.Details
remodel kitchen, in kind. new appliances, cabinets, lighting, tile, countertop. | $50,000 |
| Dec 23, 2020 | Completed final sign-off Apr 2021 | 533 Noe St | voluntary plywood sheathing addition at first floor.Details
voluntary plywood sheathing addition at first floor. | $10,000 |
| Dec 17, 2020 | Completed final sign-off May 2021 | 969 Page St | garage door & frame was hit by car. project consists of wall repair. existing brick foundation under repaired wall segments will be replaced with concrete footings.Details
garage door & frame was hit by car. project consists of wall repair. existing brick foundation under repaired wall segments will be replaced with concrete footings. | $10,000 |
| Dec 7, 2020 | Completed final sign-off May 2021 | 1259 Stanyan St | dry rot repair, in-kind, to exterior facade. replace, in-kind, window casings, & facia boards. total repair less than 20% of facade. paint to finish.Details
dry rot repair, in-kind, to exterior facade. replace, in-kind, window casings, & facia boards. total repair less than 20% of facade. paint to finish. | $10,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 533 Noe St | kitchen remodel in-kind. new cabinets, appliances, counter top, flooring.Details
kitchen remodel in-kind. new cabinets, appliances, counter top, flooring. | $7,500 |
| Aug 17, 2020 | Completed final sign-off Apr 2021 | 1807 Greenwich St | kitchen remodel in kind. new cabinets, counter top, appliances & lighting.Details
kitchen remodel in kind. new cabinets, counter top, appliances & lighting. | $75,000 |
| Feb 11, 2020 | Completed final sign-off Dec 2020 | 21 Baker St | entry stairs replacementDetails
entry stairs replacement | $40,000 |
| Feb 7, 2020 | Completed final sign-off Sep 2020 | 953 Haight St | voluntary seismic strengthening of rear wall and trellis additionDetails
voluntary seismic strengthening of rear wall and trellis addition | $75,000 |
| Jan 31, 2020 | Completed final sign-off Dec 2021 | 432 Lawton St | deck & stair addition in rear yard. renovate existing patio in rear yard.Details
deck & stair addition in rear yard. renovate existing patio in rear yard. | $40,000 |
| Dec 31, 2019 | Completed final sign-off Mar 2020 | 953 Clayton St | address correction for 201910245459 from 955 clayton street to "953 clayton street #4"Details
address correction for 201910245459 from 955 clayton street to "953 clayton street #4" | |
| Oct 29, 2019 | Completed final sign-off Mar 2020 | 953 Haight St | replacement of an undersize wood beam with a new steel beam over garageDetails
replacement of an undersize wood beam with a new steel beam over garage | $10,000 |
| Oct 24, 2019 | Completed final sign-off Mar 2020 | 955 Clayton St | convert e bath and closet into 2 smaller baths. top floor unit 6Details
convert e bath and closet into 2 smaller baths. top floor unit 6 | $60,000 |
| Oct 15, 2019 | Completed final sign-off Jan 2020 | 1904 Broadway | remodel, in kind exterior rearfacing terrace. remove + replace tile, install new water proofing membrane.Details
remodel, in kind exterior rearfacing terrace. remove + replace tile, install new water proofing membrane. | $15,000 |
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 3600 Jackson St | repair existing terraces, 3ea. replace waterproof membrane. install/replace tile. not visible from st. replace in kind.Details
repair existing terraces, 3ea. replace waterproof membrane. install/replace tile. not visible from st. replace in kind. | $20,000 |
| Jun 3, 2019 | Completed final sign-off Aug 2019 | 3880 Sacramento St | remodel, in -kind, bathroom: faucets, fistures, fan, lighting replacement. no structural work - no wall modificationDetails
remodel, in -kind, bathroom: faucets, fistures, fan, lighting replacement. no structural work - no wall modification | $35,000 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 359 Waller St | unit 1 -bathroom in an existing walk in closet of 6 unit condoDetails
unit 1 -bathroom in an existing walk in closet of 6 unit condo | $30,000 |
| Mar 7, 2019 | Completed final sign-off May 2019 | 1283 11th Av | 1. repair existing stairs, in-kind, less than 50%. 2. replace stair treads and risers. 3. paintDetails
1. repair existing stairs, in-kind, less than 50%. 2. replace stair treads and risers. 3. paint | $5,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2019 | 432 Lawton St | interior renovation of entry floor including addition of powder room, kitchen renovation, rear sun room renovation, repair of framing deficiencies and voluntary strengthening.Details
interior renovation of entry floor including addition of powder room, kitchen renovation, rear sun room renovation, repair of framing deficiencies and voluntary strengthening. | $150,000 |
| Aug 1, 2018 | Never finaled issued Aug 2018, no final | 432 Lawton St | bathroom remodel, in-kind. new faucets, fixtures, fan lighting, tileDetails
bathroom remodel, in-kind. new faucets, fixtures, fan lighting, tile | $15,000 |
| Jun 28, 2018 | Completed final sign-off Oct 2018 | 511 Clayton St | remodel bathroom in kind. new tiles, shower pan, lights, fan, toilet, vanity.Details
remodel bathroom in kind. new tiles, shower pan, lights, fan, toilet, vanity. | $15,000 |
| May 11, 2018 | Never finaled issued May 2018, no final | 2276 Fulton St | revision to 201802232058. voluntary strengthening of e wood beam with steel channels. replace portitoin of basement slab. new beam at edge of stair openingDetails
revision to 201802232058. voluntary strengthening of e wood beam with steel channels. replace portitoin of basement slab. new beam at edge of stair opening | $5,000 |
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 1283 11th Av | voulntary stregthening of (e) deficient bathroom floor framing .deficient flr framing discovered during demo fro in kind bathroom remodelref 201804025213Details
voulntary stregthening of (e) deficient bathroom floor framing .deficient flr framing discovered during demo fro in kind bathroom remodelref 201804025213 | $10,000 |
| Apr 2, 2018 | Completed final sign-off Jul 2018 | 1283 11th Av | bathroom and laundry remodel in kind. new tiles, faucets, fixtures, lighting & fanDetails
bathroom and laundry remodel in kind. new tiles, faucets, fixtures, lighting & fan | $25,000 |
| Feb 23, 2018 | Completed final sign-off Jan 2019 | 2276 Fulton St | interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egressDetails
interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egress | $125,000 |
| Jan 4, 2018 | Completed final sign-off May 2018 | 853 Hayes St | remodel existing bathroom in kind. new tub, faucets, vanity, tile, exhaust fan, lighting. n/a maher ordinanceDetails
remodel existing bathroom in kind. new tub, faucets, vanity, tile, exhaust fan, lighting. n/a maher ordinance | $20,000 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 2093 Golden Gate Av | street space permitDetails
street space permit | |
| Oct 13, 2017 | Completed final sign-off Feb 2018 | 953 Haight St | remodel in-kind, 2 bathrooms, new fixtures, tile, faucets, vanities, fans.Details
remodel in-kind, 2 bathrooms, new fixtures, tile, faucets, vanities, fans. | $25,000 |
| Sep 14, 2017 | Completed final sign-off Sep 2017 | 2100 46th Av | to obtain final inspection for work approved under pa #201012176933. all work is complete.Details
to obtain final inspection for work approved under pa #201012176933. all work is complete. | |
| Sep 7, 2017 | Completed final sign-off Jan 2019 | 2093 Golden Gate Av | the project is a center light well infill with a ground floor deck. the deck will be adjacent to a blank, windowless and doorless wall. the deck is approx 7ft off the ground and accessible from the existing laundry room. approx.60 sq of deckDetails
the project is a center light well infill with a ground floor deck. the deck will be adjacent to a blank, windowless and doorless wall. the deck is approx 7ft off the ground and accessible from the existing laundry room. approx.60 sq of deck | $15,000 |
| Aug 22, 2017 | Completed final sign-off Nov 2017 | 2089 Golden Gate Av | infill of interior lightwell for a new 1/2 bathDetails
infill of interior lightwell for a new 1/2 bath | $15,000 |
| Jul 11, 2017 | Completed final sign-off Feb 2018 | 2093 Golden Gate Av | infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration.Details
infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration. | $50,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 900 Green St | remodel bathroom, shower pan, toilet, finishes, lighting, tile, vanity; remodel laundry room, cabinets, washer/dryerDetails
remodel bathroom, shower pan, toilet, finishes, lighting, tile, vanity; remodel laundry room, cabinets, washer/dryer | $25,000 |
| Feb 1, 2017 | Completed final sign-off May 2017 | 2075 Greenwich St | bathroom remodel - tiile, vanity, shower, fixtures, fan, lightingDetails
bathroom remodel - tiile, vanity, shower, fixtures, fan, lighting | $15,000 |
| Nov 18, 2016 | Completed final sign-off Aug 2017 | 1550 Shrader St | remodel kitchen & bathroom, in kind. new tile, vanity, toilet , light and fan.Details
remodel kitchen & bathroom, in kind. new tile, vanity, toilet , light and fan. | $8,000 |
| Oct 13, 2016 | Completed final sign-off Nov 2016 | 806 Haight St | remove and replace siding on rear extension, 20'x10'. 2 story.Details
remove and replace siding on rear extension, 20'x10'. 2 story. | $8,000 |
| Jul 22, 2016 | Completed final sign-off Feb 2017 | 280 Divisadero St | revision to permit # 201605026258, add scope: local structural strengthening of existing sun room and replace foundation under existing posts supporting bay window at south face of bgldg. per plan.Details
revision to permit # 201605026258, add scope: local structural strengthening of existing sun room and replace foundation under existing posts supporting bay window at south face of bgldg. per plan. | $10,000 |
| Jun 23, 2016 | Completed final sign-off Jan 2018 | 280 Divisadero St | interior renovation including bathroom expansion and new utility closet at basement level; 1st floor - kitchen renovation; 2nd floor - two bathroom remodel and new closet space; 3rd floor - bathroom remodel. no exterior workDetails
interior renovation including bathroom expansion and new utility closet at basement level; 1st floor - kitchen renovation; 2nd floor - two bathroom remodel and new closet space; 3rd floor - bathroom remodel. no exterior work | $150,000 |
| May 23, 2016 | Completed final sign-off Feb 2017 | 280 Divisadero St | provide temp shoring to facilitate the foundation replacement per ref pa 201605016258.Details
provide temp shoring to facilitate the foundation replacement per ref pa 201605016258. | $8,000 |
| May 2, 2016 | Completed final sign-off Feb 2017 | 280 Divisadero St | foundation replacemetn and local structural strengthening at basement level. no exterior work. seismic upgrade basement level.Details
foundation replacemetn and local structural strengthening at basement level. no exterior work. seismic upgrade basement level. | $75,000 |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 782 14th St | remodel in-kind bathroom; includes new fan, lights, fixtures, faucets and tiles.Details
remodel in-kind bathroom; includes new fan, lights, fixtures, faucets and tiles. | $10,000 |
| Mar 4, 2016 | Completed final sign-off Nov 2016 | 31 Claremont Bl | interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms.Details
interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms. | $50,000 |
| Jan 6, 2016 | Completed final sign-off Mar 2016 | 808 Haight St | remodel to 201510159750. remodel bathroom - shower, sink, toilet, fan upgrade room @ rear property. no change to 3 bedrooms & laundry.Details
remodel to 201510159750. remodel bathroom - shower, sink, toilet, fan upgrade room @ rear property. no change to 3 bedrooms & laundry. | |
| Dec 17, 2015 | Completed final sign-off Mar 2016 | 1225 Hayes St | remodel bathroom in-kind, new tile, shower, tub, toilet, fan.Details
remodel bathroom in-kind, new tile, shower, tub, toilet, fan. | $10,000 |
| Nov 20, 2015 | Completed final sign-off May 2017 | 646 12th Av | interior renovation at 2nd level, new deck at rear yard, add voluntary strengthening, per plans.Details
interior renovation at 2nd level, new deck at rear yard, add voluntary strengthening, per plans. | $50,000 |
| Nov 20, 2015 | Completed final sign-off Sep 2016 | 2776 Diamond St | interior renovation of both levels of existing building. replacement of windows at rear facade. voluntary strengtheningDetails
interior renovation of both levels of existing building. replacement of windows at rear facade. voluntary strengthening | $50,000 |
| Oct 15, 2015 | Completed final sign-off Mar 2016 | 808 Haight St | remodel bathroom shower & upgrade electrical 3 bedrooms & laundry room.Details
remodel bathroom shower & upgrade electrical 3 bedrooms & laundry room. | $30,000 |
| Sep 9, 2015 | Completed final sign-off May 2016 | 1215 18th St | interior renovation of lower unit.Details
interior renovation of lower unit. | $10,000 |
| Jun 9, 2015 | Completed final sign-off Mar 2016 | 1225 Hayes St | remodel kitchen and bathroom. recofigure kitchen and family room per plan.Details
remodel kitchen and bathroom. recofigure kitchen and family room per plan. | $20,000 |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 2484 21st Av | relocate bearing wall/beam between kitchen and dining room.Details
relocate bearing wall/beam between kitchen and dining room. | $8,000 |
| Jun 1, 2015 | Completed final sign-off Aug 2015 | 808 Haight St | remodel bathroom, in-kind, shower/tub, toilet, sink, fan & lighting.Details
remodel bathroom, in-kind, shower/tub, toilet, sink, fan & lighting. | $15,000 |
| May 7, 2015 | Completed final sign-off Jun 2015 | 1458 15th Av | revision to app#201408073225. reconfigure entry way to rear bedrooms at 1st floor.Details
revision to app#201408073225. reconfigure entry way to rear bedrooms at 1st floor. | |
| May 5, 2015 | Completed final sign-off Sep 2015 | 2484 21st Av | remodel kitchen & bathroom; to comply with cec150.0(k)3 & n5Details
remodel kitchen & bathroom; to comply with cec150.0(k)3 & n5 | $50,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 900 Green St | remodel bathroom in kind. install vanity tub, tile, fan, lighting, medicine cabinet. sq ft is 64Details
remodel bathroom in kind. install vanity tub, tile, fan, lighting, medicine cabinet. sq ft is 64 | $14,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2015 | 1230 04th Av | unit #1230: kitchen, bath,dining, and living remodel.Details
unit #1230: kitchen, bath,dining, and living remodel. | $40,000 |
| Feb 2, 2015 | Expired or cancelled expired Feb 2017 | 436 Hamilton St | revision to pa 201412314763 work not visible from street - remove & replace, inkind kitchen window, remove and replace windows with patio door install, firerated door & garageDetails
revision to pa 201412314763 work not visible from street - remove & replace, inkind kitchen window, remove and replace windows with patio door install, firerated door & garage | $3,500 |
| Dec 31, 2014 | Expired or cancelled expired Feb 2017 | 436 Hamilton St | kitchen remodel in kind; new cabinets, floorings, tiles, app;iance and lighting. ; to comply with cec150.0(k)3Details
kitchen remodel in kind; new cabinets, floorings, tiles, app;iance and lighting. ; to comply with cec150.0(k)3 | $20,000 |
| Dec 12, 2014 | Expired or cancelled cancelled Dec 2017 | 1238 Masonic Av | single story rear addition for new unit approx 24'3" x 22'-0". new roof deck above rear addition. remove stair from 2nd floor to 4th floor.Details
single story rear addition for new unit approx 24'3" x 22'-0". new roof deck above rear addition. remove stair from 2nd floor to 4th floor. | $100,000 |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 1283 11th Av | bathroom remodel, in kind - fixture, tile and lighting replacement, seconf floor baDetails
bathroom remodel, in kind - fixture, tile and lighting replacement, seconf floor ba | $25,000 |
| Aug 7, 2014 | Completed final sign-off Jun 2015 | 1458 15th Av | add master bed & bathroom at 1st floor. infill lightwell at 2nd floor, remodel kitchen & bathroom.Details
add master bed & bathroom at 1st floor. infill lightwell at 2nd floor, remodel kitchen & bathroom. | $100,000 |
| Jul 10, 2014 | Completed final sign-off Oct 2014 | 513 Clayton St | remodel bathroom & powder room, new toilets, fans, lights, tile & vanity sinks. in kind.Details
remodel bathroom & powder room, new toilets, fans, lights, tile & vanity sinks. in kind. | $30,000 |
| Jun 11, 2014 | Completed final sign-off Oct 2014 | 134 Grattan St | kitchen remodel, bedroom modification, add 2 closets, building per planDetails
kitchen remodel, bedroom modification, add 2 closets, building per plan | $40,000 |
| May 23, 2014 | Expired or cancelled cancelled Jan 2019 | 339 Lincoln Wy | rear horizontal single story addition with roof deck. addition consists of two bedrooms and one bath.Details
rear horizontal single story addition with roof deck. addition consists of two bedrooms and one bath. | $80,000 |
| Apr 17, 2014 | Completed final sign-off Jul 2014 | 590 38th Av | revision to appl #201403191086: structural modification to wall opening at 2nd floor between dining room & kitchen.Details
revision to appl #201403191086: structural modification to wall opening at 2nd floor between dining room & kitchen. | $2,000 |
| Apr 3, 2014 | Completed final sign-off Aug 2014 | 66 Cleary Ct | #703 - cosmetic remodel of kitchen, 2 baths, in kind, new tiles, countertop , cabinets, and fixtures.Details
#703 - cosmetic remodel of kitchen, 2 baths, in kind, new tiles, countertop , cabinets, and fixtures. | $35,000 |