Back to bathroom remodel contractors
Centoni Restoration & Development
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Oct 2026
- Last 24 months
- 15 permits filed
114 permits since 2000: 93 completed, 8 in progress, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
50 bathroom remodel permits: 43 completed, 2 in progress, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 432 Lawton St | new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry.Details
new interior partition walls, convert existing garage space to new bathroom, storage room, relocate laundry. | $50,000 |
| Sep 1, 2026 | In progress issued Sep 2026 | 300 Castro St | renovate, in-kind, 2 ea bathrooms - new tile, faucents, fixtures, fans & lighting. no structural modificationsDetails
renovate, in-kind, 2 ea bathrooms - new tile, faucents, fixtures, fans & lighting. no structural modifications | $75,000 |
| May 8, 2026 | Completed final sign-off Aug 2026 | 2576 Green St | bathroom renovation in-kind. new lighting, fan, shower pan, tile, drywall and insulation.Details
bathroom renovation in-kind. new lighting, fan, shower pan, tile, drywall and insulation. | $30,000 |
| Jul 25, 2025 | Completed final sign-off Apr 2026 | 1120 Elm St | bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls.Details
bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls. | $80,000 |
| Jul 8, 2025 | Completed final sign-off Mar 2026 | 260 29th St | bathroom renovation in-kind. new tub, valves, vanity sink and toilet, new tile. no removal of wallsDetails
bathroom renovation in-kind. new tub, valves, vanity sink and toilet, new tile. no removal of walls | $20,000 |
| Apr 11, 2025 | Expired or cancelled withdrawn Jun 2025 | 260 29th St | relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom.Details
relocation of 2nd/fl: bathroom, kitchen renovation, relocation of skylight and solar tubes, replacement of fixtures,tiles, and finishes, in first floor bathroom. | $98,500 |
| Aug 30, 2024 | Completed final sign-off May 2025 | 2576 Green St | bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls onlyDetails
bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls only | $50,000 |
| Jul 8, 2024 | Completed final sign-off Dec 2024 | 82 El Sereno Ct | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $25,000 |
| Jun 20, 2023 | Completed final sign-off Sep 2023 | 137 Jordan Av | renovate (2) each existing bathrooms, in kind. new lights, fixtures, faucets, tile, cabinets. no structural changers.Details
renovate (2) each existing bathrooms, in kind. new lights, fixtures, faucets, tile, cabinets. no structural changers. | $75,000 |
| Apr 17, 2023 | Completed final sign-off Aug 2023 | 354 Arguello Bl | remodel bathroom - in kind. new fixtures, tile, lighting, cabinetry, fan. no removal of wallsDetails
remodel bathroom - in kind. new fixtures, tile, lighting, cabinetry, fan. no removal of walls | $30,000 |
| Jan 17, 2023 | Completed final sign-off Mar 2023 | 533 Noe St | bathroom remodel in-kind new tile, fan, lighting, fixtures and cabinetryDetails
bathroom remodel in-kind new tile, fan, lighting, fixtures and cabinetry | $25,000 |
| Aug 16, 2022 | Completed final sign-off Dec 2022 | 18 Castro St | one bathroom in kind remodel. tile, faucets, fixtures, fan lighting, and cabinetry. non structural.Details
one bathroom in kind remodel. tile, faucets, fixtures, fan lighting, and cabinetry. non structural. | $25,000 |
| Aug 1, 2022 | Completed final sign-off Jul 2023 | 1614 Fulton St | bathroom addition, kitchen renovation, removal or interior wall @ 1/f unitDetails
bathroom addition, kitchen renovation, removal or interior wall @ 1/f unit | $50,000 |
| Aug 1, 2022 | Completed final sign-off May 2023 | 3927 Cesar Chavez St | bathroom & kitchen renovation @3rd flDetails
bathroom & kitchen renovation @3rd fl | $60,000 |
| Dec 3, 2021 | Completed final sign-off Mar 2022 | 6418 California St | remodel existing bathroom in kind. new fixtures, faucets, exhaust fan, lighting and tile. no layout change, no wall stud framing demo.Details
remodel existing bathroom in kind. new fixtures, faucets, exhaust fan, lighting and tile. no layout change, no wall stud framing demo. | $30,000 |
| Aug 19, 2021 | Completed final sign-off Apr 2023 | 2307 Broadway | remodel of existing bathroom on 3rd fl and repair of damaged framingDetails
remodel of existing bathroom on 3rd fl and repair of damaged framing | $50,000 |
| Jun 29, 2021 | Completed final sign-off Sep 2021 | 1259 Stanyan St | in-kind bathroom remodel, new tile, banity, fan lighting, plumbing fixtures.Details
in-kind bathroom remodel, new tile, banity, fan lighting, plumbing fixtures. | $30,000 |
| Oct 24, 2019 | Completed final sign-off Mar 2020 | 955 Clayton St | convert e bath and closet into 2 smaller baths. top floor unit 6Details
convert e bath and closet into 2 smaller baths. top floor unit 6 | $60,000 |
| Jun 3, 2019 | Completed final sign-off Aug 2019 | 3880 Sacramento St | remodel, in -kind, bathroom: faucets, fistures, fan, lighting replacement. no structural work - no wall modificationDetails
remodel, in -kind, bathroom: faucets, fistures, fan, lighting replacement. no structural work - no wall modification | $35,000 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 359 Waller St | unit 1 -bathroom in an existing walk in closet of 6 unit condoDetails
unit 1 -bathroom in an existing walk in closet of 6 unit condo | $30,000 |
| Aug 1, 2018 | Never finaled issued Aug 2018, no final | 432 Lawton St | bathroom remodel, in-kind. new faucets, fixtures, fan lighting, tileDetails
bathroom remodel, in-kind. new faucets, fixtures, fan lighting, tile | $15,000 |
| Jun 28, 2018 | Completed final sign-off Oct 2018 | 511 Clayton St | remodel bathroom in kind. new tiles, shower pan, lights, fan, toilet, vanity.Details
remodel bathroom in kind. new tiles, shower pan, lights, fan, toilet, vanity. | $15,000 |
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 1283 11th Av | voulntary stregthening of (e) deficient bathroom floor framing .deficient flr framing discovered during demo fro in kind bathroom remodelref 201804025213Details
voulntary stregthening of (e) deficient bathroom floor framing .deficient flr framing discovered during demo fro in kind bathroom remodelref 201804025213 | $10,000 |
| Apr 2, 2018 | Completed final sign-off Jul 2018 | 1283 11th Av | bathroom and laundry remodel in kind. new tiles, faucets, fixtures, lighting & fanDetails
bathroom and laundry remodel in kind. new tiles, faucets, fixtures, lighting & fan | $25,000 |
| Feb 23, 2018 | Completed final sign-off Jan 2019 | 2276 Fulton St | interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egressDetails
interior revonation at 1/f and basement. new masterbedroom & bathroom at basement level. first floor kitchen, bathroom, laundry, bedroom & living room renovation. replace (4) windows at basement level in kind at front facade wood single &(1) window at 1/f.replace with compliant window for egress | $125,000 |
| Jan 4, 2018 | Completed final sign-off May 2018 | 853 Hayes St | remodel existing bathroom in kind. new tub, faucets, vanity, tile, exhaust fan, lighting. n/a maher ordinanceDetails
remodel existing bathroom in kind. new tub, faucets, vanity, tile, exhaust fan, lighting. n/a maher ordinance | $20,000 |
| Oct 13, 2017 | Completed final sign-off Feb 2018 | 953 Haight St | remodel in-kind, 2 bathrooms, new fixtures, tile, faucets, vanities, fans.Details
remodel in-kind, 2 bathrooms, new fixtures, tile, faucets, vanities, fans. | $25,000 |
| Aug 22, 2017 | Completed final sign-off Nov 2017 | 2089 Golden Gate Av | infill of interior lightwell for a new 1/2 bathDetails
infill of interior lightwell for a new 1/2 bath | $15,000 |
| Jul 11, 2017 | Completed final sign-off Feb 2018 | 2093 Golden Gate Av | infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration.Details
infill of interior lightwell for new half bath, renovation of existing bathroom and kitchen. no exterior alteration. | $50,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 900 Green St | remodel bathroom, shower pan, toilet, finishes, lighting, tile, vanity; remodel laundry room, cabinets, washer/dryerDetails
remodel bathroom, shower pan, toilet, finishes, lighting, tile, vanity; remodel laundry room, cabinets, washer/dryer | $25,000 |
| Feb 1, 2017 | Completed final sign-off May 2017 | 2075 Greenwich St | bathroom remodel - tiile, vanity, shower, fixtures, fan, lightingDetails
bathroom remodel - tiile, vanity, shower, fixtures, fan, lighting | $15,000 |
| Nov 18, 2016 | Completed final sign-off Aug 2017 | 1550 Shrader St | remodel kitchen & bathroom, in kind. new tile, vanity, toilet , light and fan.Details
remodel kitchen & bathroom, in kind. new tile, vanity, toilet , light and fan. | $8,000 |
| Jun 23, 2016 | Completed final sign-off Jan 2018 | 280 Divisadero St | interior renovation including bathroom expansion and new utility closet at basement level; 1st floor - kitchen renovation; 2nd floor - two bathroom remodel and new closet space; 3rd floor - bathroom remodel. no exterior workDetails
interior renovation including bathroom expansion and new utility closet at basement level; 1st floor - kitchen renovation; 2nd floor - two bathroom remodel and new closet space; 3rd floor - bathroom remodel. no exterior work | $150,000 |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 782 14th St | remodel in-kind bathroom; includes new fan, lights, fixtures, faucets and tiles.Details
remodel in-kind bathroom; includes new fan, lights, fixtures, faucets and tiles. | $10,000 |
| Mar 4, 2016 | Completed final sign-off Nov 2016 | 31 Claremont Bl | interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms.Details
interior renovation at upper level and strengthening of sun room. remodel kitchen and two bathrooms. | $50,000 |
| Jan 6, 2016 | Completed final sign-off Mar 2016 | 808 Haight St | remodel to 201510159750. remodel bathroom - shower, sink, toilet, fan upgrade room @ rear property. no change to 3 bedrooms & laundry.Details
remodel to 201510159750. remodel bathroom - shower, sink, toilet, fan upgrade room @ rear property. no change to 3 bedrooms & laundry. | |
| Dec 17, 2015 | Completed final sign-off Mar 2016 | 1225 Hayes St | remodel bathroom in-kind, new tile, shower, tub, toilet, fan.Details
remodel bathroom in-kind, new tile, shower, tub, toilet, fan. | $10,000 |
| Oct 15, 2015 | Completed final sign-off Mar 2016 | 808 Haight St | remodel bathroom shower & upgrade electrical 3 bedrooms & laundry room.Details
remodel bathroom shower & upgrade electrical 3 bedrooms & laundry room. | $30,000 |
| Jun 9, 2015 | Completed final sign-off Mar 2016 | 1225 Hayes St | remodel kitchen and bathroom. recofigure kitchen and family room per plan.Details
remodel kitchen and bathroom. recofigure kitchen and family room per plan. | $20,000 |
| Jun 1, 2015 | Completed final sign-off Aug 2015 | 808 Haight St | remodel bathroom, in-kind, shower/tub, toilet, sink, fan & lighting.Details
remodel bathroom, in-kind, shower/tub, toilet, sink, fan & lighting. | $15,000 |
| May 5, 2015 | Completed final sign-off Sep 2015 | 2484 21st Av | remodel kitchen & bathroom; to comply with cec150.0(k)3 & n5Details
remodel kitchen & bathroom; to comply with cec150.0(k)3 & n5 | $50,000 |
| Mar 10, 2015 | Completed final sign-off Jun 2015 | 900 Green St | remodel bathroom in kind. install vanity tub, tile, fan, lighting, medicine cabinet. sq ft is 64Details
remodel bathroom in kind. install vanity tub, tile, fan, lighting, medicine cabinet. sq ft is 64 | $14,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2015 | 1230 04th Av | unit #1230: kitchen, bath,dining, and living remodel.Details
unit #1230: kitchen, bath,dining, and living remodel. | $40,000 |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 1283 11th Av | bathroom remodel, in kind - fixture, tile and lighting replacement, seconf floor baDetails
bathroom remodel, in kind - fixture, tile and lighting replacement, seconf floor ba | $25,000 |
| Aug 7, 2014 | Completed final sign-off Jun 2015 | 1458 15th Av | add master bed & bathroom at 1st floor. infill lightwell at 2nd floor, remodel kitchen & bathroom.Details
add master bed & bathroom at 1st floor. infill lightwell at 2nd floor, remodel kitchen & bathroom. | $100,000 |
| Jul 10, 2014 | Completed final sign-off Oct 2014 | 513 Clayton St | remodel bathroom & powder room, new toilets, fans, lights, tile & vanity sinks. in kind.Details
remodel bathroom & powder room, new toilets, fans, lights, tile & vanity sinks. in kind. | $30,000 |
| May 23, 2014 | Expired or cancelled cancelled Jan 2019 | 339 Lincoln Wy | rear horizontal single story addition with roof deck. addition consists of two bedrooms and one bath.Details
rear horizontal single story addition with roof deck. addition consists of two bedrooms and one bath. | $80,000 |
| Apr 3, 2014 | Completed final sign-off Aug 2014 | 66 Cleary Ct | #703 - cosmetic remodel of kitchen, 2 baths, in kind, new tiles, countertop , cabinets, and fixtures.Details
#703 - cosmetic remodel of kitchen, 2 baths, in kind, new tiles, countertop , cabinets, and fixtures. | $35,000 |
| Nov 15, 2013 | Completed final sign-off Jul 2014 | 123 Lincoln Wy | interior remodel. remove existing closet and add new bath at rear e bedroom. add new closet, kitchen remodel, enlarge existing opening between kitchen and nook at non bearing wall, new closet for washer and dryer.Details
interior remodel. remove existing closet and add new bath at rear e bedroom. add new closet, kitchen remodel, enlarge existing opening between kitchen and nook at non bearing wall, new closet for washer and dryer. | $15,000 |
| May 28, 2009 | Completed final sign-off Nov 2009 | 1844 Stockton St | remodel (1) kitchen-replace existing cabinets & appliances. remodel (1) bathroom-replace existing tub, sink & shower, no structural changes (in-kind).Details
remodel (1) kitchen-replace existing cabinets & appliances. remodel (1) bathroom-replace existing tub, sink & shower, no structural changes (in-kind). | $18,000 |