Block 0952, lot 015
2576 Green St
- City’s use
- Single Family Residential
- Built
- 1906
- Stories
- 4
- Units
- 1
- Rooms
- 6 bathrooms
- Building
- 5,700 sq ft
- Lot
- 4,199 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 8, 2026 | Completed final sign-off Aug 2026 | 2576 Green St | Centoni Restoration & Development | bathroom renovation in-kind. new lighting, fan, shower pan, tile, drywall and insulation.Details
bathroom renovation in-kind. new lighting, fan, shower pan, tile, drywall and insulation. | $30,000 |
| Jun 18, 2025 | Completed final sign-off Nov 2025 | 2576 Green St | Centoni Restoration & Development | structural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interiorDetails
structural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interior | $60,000 |
| Aug 30, 2024 | Completed final sign-off May 2025 | 2576 Green St | Centoni Restoration & Development | bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls onlyDetails
bathroom renovation & laundry room addition on 2nd floor. master bedroom closet rearrangement. work involves removal of non-structural walls only | $50,000 |
| Aug 3, 2023 | Completed final sign-off Jan 2024 | 2576 Green St | Centoni Restoration & Development | revision to 202212158394. changing east side deck rail from glass to solid half wall, widening the curbs supporting the glass rails, and voluntary seismic bracing of the brick chimney.Details
revision to 202212158394. changing east side deck rail from glass to solid half wall, widening the curbs supporting the glass rails, and voluntary seismic bracing of the brick chimney. | |
| Dec 15, 2022 | Completed final sign-off Jan 2024 | 2576 Green St | Centoni Restoration & Development | replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl.Details
replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl. | $80,000 |
| Jan 26, 2012 | Never finaled issued Jan 2012, no final | 2576 Green St | Saw Designs Inc. | scaffolding (on property) remove and install gutter, prime and paint exterior, remove all loose stucco and install and repair patch stucco on all sidesDetails
scaffolding (on property) remove and install gutter, prime and paint exterior, remove all loose stucco and install and repair patch stucco on all sides | $42,000 |
| May 6, 2005 | Never finaled issued May 2005, no final | 2576 Green St | streetspaceDetails
streetspace |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Centoni Restoration & Development (5), Saw Designs Inc.
- Engineers
- Stanley Wu (3), Stan Wu Smw & Associates, Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.