Saw Designs Inc.
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2012 to Jul 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2018 | Completed final sign-off Sep 2018 | 3325 Fillmore St | to comply w/ accessible business entrance program. replace sidewalk & entrance to 2 degree grade. repalce threshold. adjust closing mechanism to 5 pound or less.Details
to comply w/ accessible business entrance program. replace sidewalk & entrance to 2 degree grade. repalce threshold. adjust closing mechanism to 5 pound or less. | $3,000 |
| Dec 11, 2017 | Completed final sign-off Jul 2018 | 199 Museum Wy | new cafe and prep kitchen ti maher na ref pa#201406259468Details
new cafe and prep kitchen ti maher na ref pa#201406259468 | $50,000 |
| Jul 12, 2017 | Completed final sign-off Dec 2017 | 199 Museum Wy | replace (e) countertops and sinks. replace electrica outlets in counter area's. all (e) layouts remain unchanged.Details
replace (e) countertops and sinks. replace electrica outlets in counter area's. all (e) layouts remain unchanged. | $28,000 |
| Jul 9, 2015 | Completed final sign-off Sep 2015 | 850 Minnesota St | kitchen: replace hood & reconnect to (e) vent, plumbing, eelctrical, cabinets, paint, all new lighting shall be high efficacy; bath: replace exhaust fan & reconnect to (e) duct. all fixtures same location, no wall changes. compliance with maher ordinance no 155-13 not required.Details
kitchen: replace hood & reconnect to (e) vent, plumbing, eelctrical, cabinets, paint, all new lighting shall be high efficacy; bath: replace exhaust fan & reconnect to (e) duct. all fixtures same location, no wall changes. compliance with maher ordinance no 155-13 not required. | $100,000 |
| Dec 30, 2013 | Completed final sign-off Jun 2014 | 55 28th St | replacement of stairs and railing exterior at front of house in kind.Details
replacement of stairs and railing exterior at front of house in kind. | $12,000 |
| Oct 5, 2012 | Completed final sign-off Mar 2013 | 1731 Funston Av | kitchen remodel-update elect., new flring, cabinetry, appliances, drywall, window. new lighting & tear down non load bearing wall between (e) dining & kitchen. new paint, tile & countersDetails
kitchen remodel-update elect., new flring, cabinetry, appliances, drywall, window. new lighting & tear down non load bearing wall between (e) dining & kitchen. new paint, tile & counters | $45,000 |
| Jan 26, 2012 | Never finaled issued Jan 2012, no final | 2576 Green St | scaffolding (on property) remove and install gutter, prime and paint exterior, remove all loose stucco and install and repair patch stucco on all sidesDetails
scaffolding (on property) remove and install gutter, prime and paint exterior, remove all loose stucco and install and repair patch stucco on all sides | $42,000 |