Back to kitchen remodel contractors
Saw Designs Inc.
- Based in
- San Anselmo
- On San Francisco permits
- Jan 2012 to Jul 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 6 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 11, 2017 | Completed final sign-off Jul 2018 | 199 Museum Wy | new cafe and prep kitchen ti maher na ref pa#201406259468Details
new cafe and prep kitchen ti maher na ref pa#201406259468 | $50,000 |
| Jul 9, 2015 | Completed final sign-off Sep 2015 | 850 Minnesota St | kitchen: replace hood & reconnect to (e) vent, plumbing, eelctrical, cabinets, paint, all new lighting shall be high efficacy; bath: replace exhaust fan & reconnect to (e) duct. all fixtures same location, no wall changes. compliance with maher ordinance no 155-13 not required.Details
kitchen: replace hood & reconnect to (e) vent, plumbing, eelctrical, cabinets, paint, all new lighting shall be high efficacy; bath: replace exhaust fan & reconnect to (e) duct. all fixtures same location, no wall changes. compliance with maher ordinance no 155-13 not required. | $100,000 |
| Oct 5, 2012 | Completed final sign-off Mar 2013 | 1731 Funston Av | kitchen remodel-update elect., new flring, cabinetry, appliances, drywall, window. new lighting & tear down non load bearing wall between (e) dining & kitchen. new paint, tile & countersDetails
kitchen remodel-update elect., new flring, cabinetry, appliances, drywall, window. new lighting & tear down non load bearing wall between (e) dining & kitchen. new paint, tile & counters | $45,000 |