Stanley Wu
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Smw Associates
- Based in
- Sf
- On San Francisco permits
- Dec 2004 to Mar 2026
37 permits since 2000 (engineer on 31 permits, authorized agent-others on 4 permits, architect on 1 permit, designer on 1 permit): 28 completed, 1 in progress, 2 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2026 | In progress issued Mar 2026 | 3333 Jackson St | Forma Construction | remove existing window, demolish wall to enlarge opening and install 3 new windows. (aluminum clad)Details
remove existing window, demolish wall to enlarge opening and install 3 new windows. (aluminum clad) | $5,000 |
| Jul 25, 2025 | Completed final sign-off Apr 2026 | 1120 Elm St | Centoni Restoration & Development | bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls.Details
bathroom renovation, widen opening between living room and kitchen, voluntary strengthening of foundation system, voluntary seismic strenghthening of foundation system. voluntary siesmic strengthening of basement walls. | $80,000 |
| Jun 18, 2025 | Completed final sign-off Nov 2025 | 2576 Green St | Centoni Restoration & Development | structural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interiorDetails
structural improvements at basement level including a new retaining wall, new center beams, addition of metal brackets to (e) beam /post connections, strengthening by adding new plywood shear panels & sill anchors. all work is voluntary and interior | $60,000 |
| Mar 26, 2025 | Completed final sign-off Mar 2026 | 1590 Broadway | Amone Corp | main building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building.Details
main building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building. | $60,000 |
| Feb 7, 2025 | Completed final sign-off Aug 2025 | 538 Baker St | Centoni Restoration & Development | modification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior wallsDetails
modification of an opening between kitchen & dining room. reducing opening width & increase opening height. no work at exterior walls | $7,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1152 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1077 Oakdale Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1096 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1033 Oakdale Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 1100 Palou Av | Mulhall Construction Inc. | existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels.Details
existing cmu trash enclosure to receive metal roof with steel column supports and metal infill panels. | $10,000 |
| Aug 3, 2023 | Completed final sign-off Jan 2024 | 2576 Green St | Centoni Restoration & Development | revision to 202212158394. changing east side deck rail from glass to solid half wall, widening the curbs supporting the glass rails, and voluntary seismic bracing of the brick chimney.Details
revision to 202212158394. changing east side deck rail from glass to solid half wall, widening the curbs supporting the glass rails, and voluntary seismic bracing of the brick chimney. | |
| Feb 3, 2023 | Completed final sign-off Dec 2023 | 1360 Fulton St | Centoni Restoration & Development | kitchen & laundry room renovation; relocating rear door & window; alteration to ground floor deck @ backyard; in addition to the project, includes voluntary seismic strengthening to gl1 & gl1.6 of lower unit. revision to reduce rear deck to landing.Details
kitchen & laundry room renovation; relocating rear door & window; alteration to ground floor deck @ backyard; in addition to the project, includes voluntary seismic strengthening to gl1 & gl1.6 of lower unit. revision to reduce rear deck to landing. | $80,000 |
| Dec 15, 2022 | Completed final sign-off Jan 2024 | 2576 Green St | Centoni Restoration & Development | replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl.Details
replace (e) wood deck on sleepers with porcelian tile on pedestals roof deck, replace (e) metal guard rails with glass rails, replace (e) windows and door with new insulated windows and doors voluntary strengthening of 3rd fl. | $80,000 |
| Sep 20, 2022 | Expired or cancelled withdrawn Dec 2022 | 1060 Howard St | 3/fl ti interior modernization only repurposing a portion of the (e) open office on the third floor into a new flex office, expanding the warming kitchenette to a new full size ktichen. adding a new accesible shower and repurposing an (e) office into a meditation room by applying new finishes.Details
3/fl ti interior modernization only repurposing a portion of the (e) open office on the third floor into a new flex office, expanding the warming kitchenette to a new full size ktichen. adding a new accesible shower and repurposing an (e) office into a meditation room by applying new finishes. | $490,000 | |
| Aug 26, 2021 | Completed final sign-off Oct 2022 | 1618 Fulton St | Centoni Restoration & Development | interior renovation on 2nd fl consisting of new laundry closet and kitchen relocationDetails
interior renovation on 2nd fl consisting of new laundry closet and kitchen relocation | $50,000 |
| Aug 19, 2021 | Completed final sign-off Apr 2023 | 2307 Broadway | Centoni Restoration & Development | remodel of existing bathroom on 3rd fl and repair of damaged framingDetails
remodel of existing bathroom on 3rd fl and repair of damaged framing | $50,000 |
| Apr 23, 2021 | Never finaled filed Apr 2021, never issued | 100 Whitney Young Cr | Chinchilla Construction Administration | remodel(e)classrooms.accessibility upgrades to restroom and walkways and change of occupancy from r3 to e.alteration to restroom for accessibility requirements.including demolition of partitions,adjustment of fixture heights & location.installation of truncated dome ramp to existing parking ramp.Details
remodel(e)classrooms.accessibility upgrades to restroom and walkways and change of occupancy from r3 to e.alteration to restroom for accessibility requirements.including demolition of partitions,adjustment of fixture heights & location.installation of truncated dome ramp to existing parking ramp. | $50,000 |
| Feb 11, 2020 | Completed final sign-off Dec 2020 | 21 Baker St | Centoni Restoration & Development | entry stairs replacementDetails
entry stairs replacement | $40,000 |
| Jan 31, 2020 | Completed final sign-off Dec 2021 | 432 Lawton St | Centoni Restoration & Development | deck & stair addition in rear yard. renovate existing patio in rear yard.Details
deck & stair addition in rear yard. renovate existing patio in rear yard. | $40,000 |
| Oct 24, 2019 | Completed final sign-off Mar 2020 | 955 Clayton St | Centoni Restoration & Development | convert e bath and closet into 2 smaller baths. top floor unit 6Details
convert e bath and closet into 2 smaller baths. top floor unit 6 | $60,000 |
| Sep 29, 2016 | Expired or cancelled cancelled Jan 2026 | 15 Ardenwood Wy | new media room, master bath, master closet and additional bathroom at garage level. kitchen and breakfast room renovation at main level (ref 200011145654)Details
new media room, master bath, master closet and additional bathroom at garage level. kitchen and breakfast room renovation at main level (ref 200011145654) | $150,000 | |
| Apr 4, 2014 | Never finaled issued Nov 2015, no final | 264 Dublin St | add second floor to an (e) one story single family house. work includes a second floor addition of 622 g.sf, stairs and minor modification to existing first floor.Details
add second floor to an (e) one story single family house. work includes a second floor addition of 622 g.sf, stairs and minor modification to existing first floor. | $100,000 | |
| Aug 14, 2013 | Completed final sign-off Sep 2013 | 1801 Vicente St | M Rivera Construction Inc. | voluntary seismic strengthening, no change to (e) layout. add brace to (e) beam/post connection. add bolted connection to (e) post footingDetails
voluntary seismic strengthening, no change to (e) layout. add brace to (e) beam/post connection. add bolted connection to (e) post footing | $10,000 |
| May 27, 2011 | Completed final sign-off Oct 2011 | 4751 25th St | addition of new wood deck to (e) wood deck @ rear of house.Details
addition of new wood deck to (e) wood deck @ rear of house. | $8,000 | |
| Apr 11, 2011 | Completed final sign-off Sep 2011 | 355 Granada Av | Bay Metro Corporation | interior renovation that involves remodel, reconfigure interior of walls on main living floor - 2nd fl. convert master bedroom into 2 smaller bedrooms, kitchen remodel, relocate windows.Details
interior renovation that involves remodel, reconfigure interior of walls on main living floor - 2nd fl. convert master bedroom into 2 smaller bedrooms, kitchen remodel, relocate windows. | $50,000 |
| Apr 11, 2008 | Completed final sign-off Jan 2009 | 3325 Jackson St | Caruso Construction Inc. | inter renovation of single family-bsmnt work adding 3 habitable rms,install plywood sheathing on 2 fl,1st fl-work includes removing several non-bearing walls & replacing kitchen. new powder rm will be added, 2nd fl-work includes removing several non-bearing walls & adding a bathrm, new window sasheDetails
inter renovation of single family-bsmnt work adding 3 habitable rms,install plywood sheathing on 2 fl,1st fl-work includes removing several non-bearing walls & replacing kitchen. new powder rm will be added, 2nd fl-work includes removing several non-bearing walls & adding a bathrm, new window sashe | $250,000 |
| Mar 21, 2008 | Expired or cancelled expired Mar 2011 | 515 21st Av | alterations to existing two-family dwelling includes remodeling and legalizing (e) ground level habitable space by integrating w/lower level dwelling and repair to an (e) rear deck in-kind. no changes in occupancy or building envelope. remove (e) kitchen in ground floor.Details
alterations to existing two-family dwelling includes remodeling and legalizing (e) ground level habitable space by integrating w/lower level dwelling and repair to an (e) rear deck in-kind. no changes in occupancy or building envelope. remove (e) kitchen in ground floor. | $100,000 | |
| Oct 31, 2007 | Expired or cancelled withdrawn Oct 2008 | 366 Liberty St | construct new wood retaining wall, rear yard, 8'0" from rear property line. 50 ft long from side property line to side property line.Details
construct new wood retaining wall, rear yard, 8'0" from rear property line. 50 ft long from side property line to side property line. | $10,000 | |
| Sep 21, 2007 | Completed final sign-off Aug 2008 | 819 Cayuga Av | Bay Area General Const | add one family room, one bedroom, bathroom, laundry room and storage at lower level within the existing footprint of house.modify lower level rear elevation for new windows & doors. modify garage door for pivoting operation. new skylight over (e) patio.Details
add one family room, one bedroom, bathroom, laundry room and storage at lower level within the existing footprint of house.modify lower level rear elevation for new windows & doors. modify garage door for pivoting operation. new skylight over (e) patio. | $75,000 |
| May 21, 2007 | Completed final sign-off Dec 2007 | 236 Ridgewood Av | Royal Lyon Construction | revision to appl#200701051104 deletion of all shear walls, new windows & doors in existing openings, delete special inspections for shear wall & hold downs.Details
revision to appl#200701051104 deletion of all shear walls, new windows & doors in existing openings, delete special inspections for shear wall & hold downs. | |
| Jan 5, 2007 | Completed final sign-off Dec 2007 | 236 Ridgewood Av | renovate in place (e) bedroom. relocate (e) lower floor bathroom and laundry room. relocate (e) forced air unit & hot water heater. replace finishes and relocate window at upper floor bathroom. three new skylights.Details
renovate in place (e) bedroom. relocate (e) lower floor bathroom and laundry room. relocate (e) forced air unit & hot water heater. replace finishes and relocate window at upper floor bathroom. three new skylights. | $70,000 | |
| Oct 30, 2006 | Completed final sign-off Mar 2009 | 3632 18th St | seismic foundation upgrade; replace (e) 3 story rear portion of house with 2-story rear yard addition and new 3rd story addition interior remodel. 1'-9" extension beyond (e) house into rear yard. new 3rd sotry addition is less than 500 sf & does not require 2nd means of egress.Details
seismic foundation upgrade; replace (e) 3 story rear portion of house with 2-story rear yard addition and new 3rd story addition interior remodel. 1'-9" extension beyond (e) house into rear yard. new 3rd sotry addition is less than 500 sf & does not require 2nd means of egress. | $209,000 | |
| Aug 24, 2006 | Completed final sign-off Oct 2006 | 1707 Gough St | revision to 200606164244. remove approx 35 feet of existing brick foundation and replace with new concrete foundation .Details
revision to 200606164244. remove approx 35 feet of existing brick foundation and replace with new concrete foundation . | $18,000 | |
| Jun 6, 2006 | Completed final sign-off Jun 2007 | 768 Green St | remove posts at garage level and install steel beam and new footings.Details
remove posts at garage level and install steel beam and new footings. | $10,000 | |
| Jun 6, 2006 | Completed final sign-off Feb 2007 | 624 Guerrero St | replace in kind existing rear deck & stairs-comply with nov #200666168.Details
replace in kind existing rear deck & stairs-comply with nov #200666168. | $10,000 | |
| Dec 7, 2005 | Expired or cancelled expired Nov 2007 | 2661 Broadway | interkor renovation: kitchen, bathrooms, work under this permit separate forom permit 200504200491 send story addition work under this permit is additional work to permit 20508029191Details
interkor renovation: kitchen, bathrooms, work under this permit separate forom permit 200504200491 send story addition work under this permit is additional work to permit 20508029191 | $50,000 | |
| Dec 20, 2004 | Expired or cancelled expired Oct 2006 | 3973 23rd St | R J Builders | concrete slab.Details
concrete slab. | $25,000 |