Block 4711, lot 006
100 Whitney Young Cir
- City’s use
- Commercial Misc
- Lot
- 51,800 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2021 | Never finaled filed Apr 2021, never issued | 100 Whitney Young Cr | Chinchilla Construction Administration | remodel(e)classrooms.accessibility upgrades to restroom and walkways and change of occupancy from r3 to e.alteration to restroom for accessibility requirements.including demolition of partitions,adjustment of fixture heights & location.installation of truncated dome ramp to existing parking ramp.Details
remodel(e)classrooms.accessibility upgrades to restroom and walkways and change of occupancy from r3 to e.alteration to restroom for accessibility requirements.including demolition of partitions,adjustment of fixture heights & location.installation of truncated dome ramp to existing parking ramp. | $50,000 |
| Dec 28, 2012 | Completed final sign-off Feb 2013 | 100 Whitney Young Cr | Amherst Associates Const | reroofingDetails
reroofing | $8,500 |
| Dec 28, 2010 | Expired or cancelled cancelled Jan 2026 | 100 Whitney Young Cr | Carter Brothers Fire & Life Safety | revision to 201007096260 to clarify occupancy as childcare center, not apt. see previous apps 9518778/395352Details
revision to 201007096260 to clarify occupancy as childcare center, not apt. see previous apps 9518778/395352 | $4,700 |
| Jul 9, 2010 | Completed final sign-off Jan 2011 | 100 Whitney Young Cr | Carter Brothers Fire & Life Safety | emergency fire alarm panel replacment. replace the existing fa panel that is in disrepair and obolete with new fa panel. all equip is edwards and 100% compatible. no change to field devices or coverage.Details
emergency fire alarm panel replacment. replace the existing fa panel that is in disrepair and obolete with new fa panel. all equip is edwards and 100% compatible. no change to field devices or coverage. | $4,700 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Carter Brothers Fire & Life Safety (2), Amherst Associates Const, Chinchilla Construction Administration
- Architects
- Mark Edward Bartos
- Engineers
- Stanley Wu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.