Royal Lyon Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2023
- Last 24 months
- 0 permits filed
221 permits since 2000: 191 completed, 15 never finaled, 15 expired or cancelled.
Of the 15 never-finaled permits, 4 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 221.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2023 | Completed final sign-off Oct 2023 | 3395 Balboa St | replace exterior windows- total 3- street facing. aluminum clad or wood of fibrexDetails
replace exterior windows- total 3- street facing. aluminum clad or wood of fibrex | $6,000 |
| Nov 18, 2022 | Completed final sign-off May 2024 | 740 Shotwell St | replace 62 windows for entire house in kind same location. marvin ultimez. these window have extruded aluminum exterior frame. monica giacomucci (sr. planner for dis 6) has already given her approval.Details
replace 62 windows for entire house in kind same location. marvin ultimez. these window have extruded aluminum exterior frame. monica giacomucci (sr. planner for dis 6) has already given her approval. | $10,000 |
| Oct 26, 2022 | Completed final sign-off Nov 2022 | 63 Germania St | to obtain final inspection for work approved under permit 202105110147. all work is complete.Details
to obtain final inspection for work approved under permit 202105110147. all work is complete. | |
| Oct 19, 2022 | Completed final sign-off Nov 2022 | 63 Germania St | revision to bpa#202105110147 to remove (2) bathroom remodels from scope of workDetails
revision to bpa#202105110147 to remove (2) bathroom remodels from scope of work | |
| Jul 12, 2022 | Completed final sign-off Nov 2022 | 955 Corbett Av | unit #5: (1) kitchen (1) bathroom remodel, in-kind. non structural.Details
unit #5: (1) kitchen (1) bathroom remodel, in-kind. non structural. | $25,000 |
| May 20, 2022 | Expired or cancelled cancelled Jul 2022 | 3936 20th St | in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). | $175,000 |
| May 19, 2022 | Completed final sign-off Sep 2024 | 3936 20th St | construct (n) roof dormer on (e) roof install (n) roofishingles on (e) roof, replace 4 windows in (e) window openings remove (e) bathtub & install (n) bath tub, install (n) bath room vanites, install (n) shower pan in (e) shower refinish (e) wd flrs, replace (e) front porcu flr. with (n) tileDetails
construct (n) roof dormer on (e) roof install (n) roofishingles on (e) roof, replace 4 windows in (e) window openings remove (e) bathtub & install (n) bath tub, install (n) bath room vanites, install (n) shower pan in (e) shower refinish (e) wd flrs, replace (e) front porcu flr. with (n) tile | $175,000 |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 466 09th Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $12,000 |
| Feb 15, 2022 | Completed final sign-off Apr 2022 | 779 10th Av | one kitchen (1) and one bathroom (1) remodel. no structural alteration.Details
one kitchen (1) and one bathroom (1) remodel. no structural alteration. | $20,000 |
| Feb 3, 2022 | Completed final sign-off Jun 2022 | 164 Banks St | interior renovation of (e) one kitchen & one bathroom with the (e) space, in-kind. (n) windows replacement will be install in each space & a (n) pati8o door will be install in (e) openings. no change of size or location.(n) cabinets & finishes will be installed. non structural work. all work in kindDetails
interior renovation of (e) one kitchen & one bathroom with the (e) space, in-kind. (n) windows replacement will be install in each space & a (n) pati8o door will be install in (e) openings. no change of size or location.(n) cabinets & finishes will be installed. non structural work. all work in kind | $42,000 |
| Dec 16, 2021 | Completed final sign-off Apr 2022 | 562 Pennsylvania Av | bathroom (1) remodel. no structural work - no wall/framing modifications.Details
bathroom (1) remodel. no structural work - no wall/framing modifications. | $7,000 |
| Nov 10, 2021 | Completed final sign-off Apr 2022 | 560 Pennsylvania Av | bathroom remodel (1) no change to walls.Details
bathroom remodel (1) no change to walls. | $6,000 |
| Aug 18, 2021 | Completed final sign-off Feb 2022 | 744 Harrison St | interior remodel- partial tenant build out. change of use to office @ 2nd floor and retail sales @ 1st flDetails
interior remodel- partial tenant build out. change of use to office @ 2nd floor and retail sales @ 1st fl | $10,000 |
| Jul 14, 2021 | Completed final sign-off Nov 2021 | 40 Landers St | volulntary structural repairs and upgrade to an (e) portion of the house in the rear yard. the construction will focus o n the lower level structural components open to the rear yard that supports 2 levels above. no square footage added.Details
volulntary structural repairs and upgrade to an (e) portion of the house in the rear yard. the construction will focus o n the lower level structural components open to the rear yard that supports 2 levels above. no square footage added. | $10,000 |
| May 28, 2021 | Completed final sign-off Nov 2021 | 60 Marietta Dr | replace side windows (2) same size same location. in kind replacement. max u fact .31Details
replace side windows (2) same size same location. in kind replacement. max u fact .31 | $1,000 |
| May 28, 2021 | Completed final sign-off Oct 2021 | 1478 11th Av | kitchen (1) and bathroom (1) remodel. in kind replacement. (led exit fan) replace furnace in kind. high efficiency.Details
kitchen (1) and bathroom (1) remodel. in kind replacement. (led exit fan) replace furnace in kind. high efficiency. | $18,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 63 Germania St | refinish e stairs level 2/3, remove walll at level 13, replace e gas fireplace with new gas insert at e location, add new window at rear level 3, not visible, kitchen remodel in place level 3, new flooring, new recessed lights, remove e bath lvel 2, remoel e bath level 4Details
refinish e stairs level 2/3, remove walll at level 13, replace e gas fireplace with new gas insert at e location, add new window at rear level 3, not visible, kitchen remodel in place level 3, new flooring, new recessed lights, remove e bath lvel 2, remoel e bath level 4 | $80,000 |
| Apr 7, 2021 | Completed final sign-off Dec 2021 | 60 Marietta Dr | widen opening to dining room (n) kitchen cabs, upgrade kitchen lightingDetails
widen opening to dining room (n) kitchen cabs, upgrade kitchen lighting | $12,000 |
| Feb 18, 2021 | Completed final sign-off Jan 2022 | 1220 Ellis St | interior remodel of unit. install new code compliant electrical breaker box and all electrical fixtures. install new code compliant plumbing fixtures. replace finishes and cabinets. raise extg door header.Details
interior remodel of unit. install new code compliant electrical breaker box and all electrical fixtures. install new code compliant plumbing fixtures. replace finishes and cabinets. raise extg door header. | $90,000 |
| Jan 8, 2021 | Completed final sign-off Jun 2021 | 1336 20th St | kitchen and bathroom remodel in kind.Details
kitchen and bathroom remodel in kind. | $20,000 |
| Nov 24, 2020 | Completed final sign-off Aug 2021 | 2008 Lyon St | interior changes to a single rm within (e) house. (e) office converted to (n) butler's pantry. (n) cabinets, sink w/ gar disp, dw, refrig and wine cooler installed. no new walls will be constructed, no (e) walls removed. 1 (e) window will remain. all work is within (e) envelope. no exterior changesDetails
interior changes to a single rm within (e) house. (e) office converted to (n) butler's pantry. (n) cabinets, sink w/ gar disp, dw, refrig and wine cooler installed. no new walls will be constructed, no (e) walls removed. 1 (e) window will remain. all work is within (e) envelope. no exterior changes | $22,000 |
| Jun 29, 2020 | Completed final sign-off Mar 2021 | 1534 Stockton St | remove single step at exterior front entry to bar, instll new sloped ramp and power operated door at exterior and interior of front entryDetails
remove single step at exterior front entry to bar, instll new sloped ramp and power operated door at exterior and interior of front entry | $6,000 |
| Jan 16, 2020 | Completed final sign-off Sep 2020 | 1334 Douglass St | interior remodel at ground and 2nd floorDetails
interior remodel at ground and 2nd floor | $30,000 |
| Jul 25, 2019 | Completed final sign-off Sep 2019 | 1965 10th Av | repair extg cantilivered balcony on front of extg 2 family dwelling.extg roof and post to remain. no increase in area. extg canteilevered beams to be replaced with new alaskan yellow cedar port orford cedar glulams.repair railings in original configuration(replaced no more than 50% of extg wood.Details
repair extg cantilivered balcony on front of extg 2 family dwelling.extg roof and post to remain. no increase in area. extg canteilevered beams to be replaced with new alaskan yellow cedar port orford cedar glulams.repair railings in original configuration(replaced no more than 50% of extg wood. | $6,500 |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 194 Noe St | convert existing bedroom to new office. convert existing fau room and closet to new powder room. relocate fau to attic of powder roomDetails
convert existing bedroom to new office. convert existing fau room and closet to new powder room. relocate fau to attic of powder room | $10,000 |
| Mar 29, 2019 | Completed final sign-off Jul 2019 | 1350 California St | unit 206: replace kitchen counter top and plumbing fixtures. replace plumbing, fixtures, and tile at (2) bathrooms.Details
unit 206: replace kitchen counter top and plumbing fixtures. replace plumbing, fixtures, and tile at (2) bathrooms. | $20,000 |
| Feb 13, 2019 | Completed final sign-off Aug 2020 | 670 19th Av | convert 1st fl storage to living space (home office), relocate laundry, kitchen reno, relocate powder room, 1 full bath & install a new full bath @ 3rd floor. new 3rd floor roof deck; replace front windows in-kind, new rear windows & doorsDetails
convert 1st fl storage to living space (home office), relocate laundry, kitchen reno, relocate powder room, 1 full bath & install a new full bath @ 3rd floor. new 3rd floor roof deck; replace front windows in-kind, new rear windows & doors | $125,000 |
| Jan 15, 2019 | Completed final sign-off Jun 2024 | 740 Shotwell St | excavation (e) bldg to add basement(2nd unit), (e) 2 flrs to be remodeld & combined into 1 unit, horizontal addition @ south rear side @ 2nd flr. west rear addition converts (e) roof deck @ 2nd flr into liveable space, vertical addition of roof deck above (n) liveable space. solar panels @ roof.Details
excavation (e) bldg to add basement(2nd unit), (e) 2 flrs to be remodeld & combined into 1 unit, horizontal addition @ south rear side @ 2nd flr. west rear addition converts (e) roof deck @ 2nd flr into liveable space, vertical addition of roof deck above (n) liveable space. solar panels @ roof. | $140,000 |
| Jan 15, 2019 | Completed final sign-off Jun 2024 | 740 Shotwell St | remodel of existing shed structure.Details
remodel of existing shed structure. | $10,000 |
| Jan 10, 2019 | Completed final sign-off May 2019 | 1309 20th St | revision to app#201804237028. add concreate cap to extg foundation at east wall.Details
revision to app#201804237028. add concreate cap to extg foundation at east wall. | |
| Dec 31, 2018 | Completed final sign-off Mar 2019 | 520 Baker St | remodel bathroom - replace tub, toilet, vanity, tileDetails
remodel bathroom - replace tub, toilet, vanity, tile | $7,000 |
| Sep 26, 2018 | Completed final sign-off Mar 2019 | 770 Ofarrell St | alteration & addition of 1 (n) water closet, w/in (e) closet at main level floor. n/a maherDetails
alteration & addition of 1 (n) water closet, w/in (e) closet at main level floor. n/a maher | $7,000 |
| Sep 11, 2018 | Completed final sign-off May 2019 | 1309 20th St | revision to app#201804237028. install a new window in an extg window opening as per extg property line windows. frequently asked questions about repair or replacement no.3. new slider window to be installed in extg window opening.Details
revision to app#201804237028. install a new window in an extg window opening as per extg property line windows. frequently asked questions about repair or replacement no.3. new slider window to be installed in extg window opening. | |
| Sep 6, 2018 | Completed final sign-off Nov 2018 | 3618 22nd St | inkind replacement of 8 sliders on the east side with marvin ultrx integrity and inkind repair/replacement of stucco banding on same side elevation.ref 201804055623.Details
inkind replacement of 8 sliders on the east side with marvin ultrx integrity and inkind repair/replacement of stucco banding on same side elevation.ref 201804055623. | $10,000 |
| Aug 14, 2018 | Completed final sign-off Jan 2019 | 3686 Folsom St | remove (e) lv rm winodw (n) wood (e) opening (n) window shall be marvin wood window w/ exteior alum clading .32 u facotr. pathc (e) cem plaster (n) finished cement plaster at front elevation & entry stair. replace garage door in (e) openingDetails
remove (e) lv rm winodw (n) wood (e) opening (n) window shall be marvin wood window w/ exteior alum clading .32 u facotr. pathc (e) cem plaster (n) finished cement plaster at front elevation & entry stair. replace garage door in (e) opening | $38,000 |
| Jul 3, 2018 | Completed final sign-off Sep 2019 | 2245 Webster St | renew for final inspection: pa# 201303252993 and 201210162113Details
renew for final inspection: pa# 201303252993 and 201210162113 | |
| Jun 1, 2018 | Never finaled issued Jun 2018, no final | 447 Vermont St | revision to pa 2015-1023-0658 si existing framing & foundation conditions corrected on sheets s2 & s3. new post & footing retail 10/s6Details
revision to pa 2015-1023-0658 si existing framing & foundation conditions corrected on sheets s2 & s3. new post & footing retail 10/s6 | |
| May 18, 2018 | Completed final sign-off Aug 2020 | 670 19th Av | one story garage expansion at rear. new rear decks and stairs to yard at 1st and 2nd fl. north side lightwell infillDetails
one story garage expansion at rear. new rear decks and stairs to yard at 1st and 2nd fl. north side lightwell infill | $50,000 |
| Apr 23, 2018 | Completed final sign-off May 2019 | 1309 20th St | renovation of vacant 2-story bld. remove (e) kitchen, stairs, & split bathrm. constr (n) kitchen, bathrom, livingrm, bedrm at 1st flr. constr (n) stairs to 2nd flr for (n) main bedrm & 1/2 bath.Details
renovation of vacant 2-story bld. remove (e) kitchen, stairs, & split bathrm. constr (n) kitchen, bathrom, livingrm, bedrm at 1st flr. constr (n) stairs to 2nd flr for (n) main bedrm & 1/2 bath. | $276,000 |
| Apr 5, 2018 | Completed final sign-off Sep 2018 | 74 Aztec St | bathroom remodelDetails
bathroom remodel | $6,000 |
| Apr 5, 2018 | Completed final sign-off Nov 2018 | 3618 22nd St | at side, replace four visible vinyl windows with 4 new integrity from marvin - ultrex slider windows. no other work.Details
at side, replace four visible vinyl windows with 4 new integrity from marvin - ultrex slider windows. no other work. | $8,000 |
| Jan 3, 2018 | Completed final sign-off Oct 2018 | 1380 Greenwich St | unit 10: kitchen & bathroomremodel - no structural work in same location. nomoving of walls, doors or windows.Details
unit 10: kitchen & bathroomremodel - no structural work in same location. nomoving of walls, doors or windows. | $10,000 |
| Aug 22, 2017 | Completed final sign-off Apr 2019 | 2 Douglass St | revision to pa 201408123601. change to several windows, changes to stairs, miscellaneous minor architectural and structural revisions.Details
revision to pa 201408123601. change to several windows, changes to stairs, miscellaneous minor architectural and structural revisions. | $40,000 |
| Jul 20, 2017 | Never finaled issued Aug 2017, no final | 2249 Webster St | revision to pa #201201172287 - mew elecgtrical & lighting throughout interior remodel. these plans only cover electrical & lighting.Details
revision to pa #201201172287 - mew elecgtrical & lighting throughout interior remodel. these plans only cover electrical & lighting. | $1,500 |
| Jul 19, 2017 | Completed final sign-off Apr 2019 | 2 Douglass St | revision to 201408123601 s1/r1 replace failing foundation as shown on plansDetails
revision to 201408123601 s1/r1 replace failing foundation as shown on plans | $40,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 347 Prague St | kitchen remodel including relocating extg cabinets, minor changes to plmg. removal of load bearing wall, construction of load bearing beam, electrical and mechanical work.Details
kitchen remodel including relocating extg cabinets, minor changes to plmg. removal of load bearing wall, construction of load bearing beam, electrical and mechanical work. | $22,000 |
| Apr 14, 2017 | Completed final sign-off Sep 2019 | 2247 Webster St | foundation upgrade along northern property lineDetails
foundation upgrade along northern property line | |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 2249 Webster St | revision to previously permit per app#201508255205. change in bathdroom layout at 1st and 3rd floors, modified roof skylights, new 1st floor doors, new garage floor slab elevation.Details
revision to previously permit per app#201508255205. change in bathdroom layout at 1st and 3rd floors, modified roof skylights, new 1st floor doors, new garage floor slab elevation. | |
| Mar 3, 2017 | Completed final sign-off Mar 2018 | 782 Wisconsin St | install new underground 4-inch fire service off of 4-inch main on wisconsin st for fire sprinkler system installed under appl. # 2016/12/20/5449.Details
install new underground 4-inch fire service off of 4-inch main on wisconsin st for fire sprinkler system installed under appl. # 2016/12/20/5449. | $12,000 |
| Feb 2, 2017 | Completed final sign-off Jan 2019 | 782 Wisconsin St | revision to 201506017698, addition of rated fire pump room, miscellaneous updates to details; modification to 4th floor guardrail.Details
revision to 201506017698, addition of rated fire pump room, miscellaneous updates to details; modification to 4th floor guardrail. | $5,000 |
| Mar 23, 2016 | Completed final sign-off Dec 2016 | 639 12th Av | 2nd flr: demo (e)kitchen & powder rm, install new kitchen & powder rm within (e)spaces,3rd flr: demo (e) en suite bathrm, install a new bathrm in space. all construction is within (e)bldg envelope.no new addition or sq.ft. will be added.Details
2nd flr: demo (e)kitchen & powder rm, install new kitchen & powder rm within (e)spaces,3rd flr: demo (e) en suite bathrm, install a new bathrm in space. all construction is within (e)bldg envelope.no new addition or sq.ft. will be added. | $35,200 |
| Mar 4, 2016 | Completed final sign-off Jun 2016 | 31 Granada Av | voluntary basement walls strengthening.Details
voluntary basement walls strengthening. | $78,600 |
| Nov 17, 2015 | Completed final sign-off Mar 2016 | 83 Park St | at e 3rd floor dwelling unit, remove e partitions, plumbing fixtures and cabinetry a e kitchen and baths. provide new cabinetry, plumbing, fixtures, light fixtures at e kitchen and baths. provide and replace light fixtures in hallway, living room, dining roomDetails
at e 3rd floor dwelling unit, remove e partitions, plumbing fixtures and cabinetry a e kitchen and baths. provide new cabinetry, plumbing, fixtures, light fixtures at e kitchen and baths. provide and replace light fixtures in hallway, living room, dining room | $80,465 |
| Oct 23, 2015 | Never finaled issued Oct 2016, no final | 447 Vermont St | interior remodel and addition at rear of existing residence, replace bath at 1st floor. remodel kitchen and add powder rm at 2/f. add 2 baths at 3/f remodel bedrm at 1/f. add 2 bedrms at 3/f by remodeling existing habitable space. for previous work at stair to 3rd floor see permit #2011-0603-7402.Details
interior remodel and addition at rear of existing residence, replace bath at 1st floor. remodel kitchen and add powder rm at 2/f. add 2 baths at 3/f remodel bedrm at 1/f. add 2 bedrms at 3/f by remodeling existing habitable space. for previous work at stair to 3rd floor see permit #2011-0603-7402. | $448,000 |
| Aug 7, 2015 | Completed final sign-off Oct 2019 | 10 Romain St | 3rd floor addition & renovation of (e) 2nd floor, (n) kitchen, (1)(n) bathroom.Details
3rd floor addition & renovation of (e) 2nd floor, (n) kitchen, (1)(n) bathroom. | $250,000 |
| Aug 3, 2015 | Completed final sign-off Nov 2015 | 347 Prague St | provide bath in garage including non load bearing walls, plumb, ele, hvac. replace elec service panel with larger 150 amp serviceDetails
provide bath in garage including non load bearing walls, plumb, ele, hvac. replace elec service panel with larger 150 amp service | $24,000 |
| Jul 15, 2015 | Completed final sign-off Sep 2015 | 639 12th Av | remove existing deck, replace with new deck.Details
remove existing deck, replace with new deck. | $8,000 |
| Jun 3, 2015 | Completed final sign-off Dec 2015 | 3395 Balboa St | seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4Details
seismic retrofit at garage level walls per sf ordinance 66-13.. sfbc chapter 34b and 2012 iebc appendix a-4 | $90,864 |
| Jun 1, 2015 | Completed final sign-off Jan 2019 | 782 Wisconsin St | vertical addition to 1 story rear unit of 2 unit condo bldg, kitchen remodel.Details
vertical addition to 1 story rear unit of 2 unit condo bldg, kitchen remodel. | $150,000 |
| Apr 29, 2015 | Never finaled issued Apr 2015, no final | 74 Aztec St | to obtain final inspection for work under approved pa# 201305076339. all work is comlpeteDetails
to obtain final inspection for work under approved pa# 201305076339. all work is comlpete | |
| Apr 23, 2015 | Expired or cancelled cancelled Oct 2017 | 2 Romain St | a new vertical addition to (e) 2 story single family res'd. add a 3rd level to an (e) 2 level house. constructed over a porton of the (e) roof. the (n) 3rd level will have a home office, multi purpose rm. a media area & bathrm. a roof deck will also be constructed. a (n) interior stairs will be addDetails
a new vertical addition to (e) 2 story single family res'd. add a 3rd level to an (e) 2 level house. constructed over a porton of the (e) roof. the (n) 3rd level will have a home office, multi purpose rm. a media area & bathrm. a roof deck will also be constructed. a (n) interior stairs will be add | $230,000 |
| Mar 30, 2015 | Completed final sign-off Dec 2015 | 714 Broderick St | bathroom on 3rd floor - removed all existing plumbing fixture,light fixtures, tile. install new plumbing fixtures and tiles. no wall to be changed.Details
bathroom on 3rd floor - removed all existing plumbing fixture,light fixtures, tile. install new plumbing fixtures and tiles. no wall to be changed. | $7,000 |
| Mar 25, 2015 | Completed final sign-off May 2015 | 560 Greenwich St | repair (e) roof deck, size about 16 x 18 less than 50% in kindDetails
repair (e) roof deck, size about 16 x 18 less than 50% in kind | $6,000 |
| Mar 23, 2015 | Completed final sign-off Jan 2018 | 955 Natoma St | replacement of footings along perimeter of bld maher - not req'dDetails
replacement of footings along perimeter of bld maher - not req'd | $30,000 |
| Mar 6, 2015 | Completed final sign-off Oct 2019 | 321 Chenery St | remove & replace (e)rear structure, deck & stairs with new horizontal two story addition, deck & stairs. relocate (e) 3rd flr. one bedroom unit to 1st flr. infill at ground flr level, remodel garage & ground flr level. remodel kitchen & 2nd flr bath.Details
remove & replace (e)rear structure, deck & stairs with new horizontal two story addition, deck & stairs. relocate (e) 3rd flr. one bedroom unit to 1st flr. infill at ground flr level, remodel garage & ground flr level. remodel kitchen & 2nd flr bath. | $200,000 |
| Jan 9, 2015 | Completed final sign-off Jan 2016 | 2237 15th Av | 1st floor: demolish (e) fmaily room, bathroom and mud room to construct 2 new bedrooms, one den, one full bathroom and laundry/mudroom per plan. new rear deck less than 24" at rear. 2nd floor: remove door to (e) interior stair. add a new balcony and stairway at the rear per plan show.Details
1st floor: demolish (e) fmaily room, bathroom and mud room to construct 2 new bedrooms, one den, one full bathroom and laundry/mudroom per plan. new rear deck less than 24" at rear. 2nd floor: remove door to (e) interior stair. add a new balcony and stairway at the rear per plan show. | $80,000 |
| Dec 10, 2014 | Completed final sign-off Dec 2015 | 544 Waller St | unit #1: renovate condo, joining ground & 1st flr adding bedroom & 2 baths; add new windows and doors to rear elevation. maher ord n/a.Details
unit #1: renovate condo, joining ground & 1st flr adding bedroom & 2 baths; add new windows and doors to rear elevation. maher ord n/a. | $195,000 |
| Nov 4, 2014 | Completed final sign-off Sep 2018 | 1380 Greenwich St | interior improvements as per plan -to storage area of lower level of in type 1a portion of bldg, revision to storage layout, including new closets, relocating & windening stair, lighting & receptacle revisions. no change to use or exiting. no exterior work.Details
interior improvements as per plan -to storage area of lower level of in type 1a portion of bldg, revision to storage layout, including new closets, relocating & windening stair, lighting & receptacle revisions. no change to use or exiting. no exterior work. | $17,000 |
| Oct 27, 2014 | Completed final sign-off Jan 2018 | 955 Natoma St | vertical addition: 4th floor lounge addition. compliance w/ ordinance no. 155-13 is not required. ref pa# 2013/07/26/2927.Details
vertical addition: 4th floor lounge addition. compliance w/ ordinance no. 155-13 is not required. ref pa# 2013/07/26/2927. | $80,000 |
| Oct 7, 2014 | Completed final sign-off Aug 2015 | 2230 15th St | interior remodel of unit #2230. work includes remodeling of (e) kitchen and bathroom. add half bath per plan. open up the wall between kitchen and living.Details
interior remodel of unit #2230. work includes remodeling of (e) kitchen and bathroom. add half bath per plan. open up the wall between kitchen and living. | $80,100 |
| Sep 11, 2014 | Completed final sign-off May 2015 | 3618 22nd St | soft story seismic strengthening o ftarget story per sf ordinance 66-13, sfbc chater 34b, 2012 iebc appendix a-4.Details
soft story seismic strengthening o ftarget story per sf ordinance 66-13, sfbc chater 34b, 2012 iebc appendix a-4. | $86,200 |
| Aug 12, 2014 | Completed final sign-off Apr 2019 | 2 Douglass St | interior remodel of (e) single fam dwelling,gr: reconfigure interior partitions to add (1) bedrm. relocate (2)(e) bathrms & (e) laundry rm. 2/f: remove & reconfigure interior partitions to expand(e) kitchen. remove(e) exterior windows & (e) doors at sides & rear of bldg & replace w/(n) windows & (n)Details
interior remodel of (e) single fam dwelling,gr: reconfigure interior partitions to add (1) bedrm. relocate (2)(e) bathrms & (e) laundry rm. 2/f: remove & reconfigure interior partitions to expand(e) kitchen. remove(e) exterior windows & (e) doors at sides & rear of bldg & replace w/(n) windows & (n) | $255,000 |
| Jul 21, 2014 | Completed final sign-off Jun 2015 | 3776 20th St | remodel bathroom. no structural work to be changed. to comply with cec150(k )10Details
remodel bathroom. no structural work to be changed. to comply with cec150(k )10 | $8,000 |
| Jul 16, 2014 | Completed final sign-off Jul 2015 | 224 Castenada Av | interior remodeling: remodel kitchen in same location on 2nd floor. add door to bath room on 3rd floor. replace extg door to bedroom with double door. add a storage room in (e) garage.Details
interior remodeling: remodel kitchen in same location on 2nd floor. add door to bath room on 3rd floor. replace extg door to bedroom with double door. add a storage room in (e) garage. | $39,000 |
| Jul 10, 2014 | Completed final sign-off Dec 2015 | 714 Broderick St | install new elevator to serve all 4 floors of 2 unit home. work includes surrounding structural conditions and removal of one bathroom.Details
install new elevator to serve all 4 floors of 2 unit home. work includes surrounding structural conditions and removal of one bathroom. | $40,000 |
| Jun 19, 2014 | Completed final sign-off Jan 2015 | 2237 15th Av | demolition of existing kitchen and bath on second floor. relocation of kitchen and add home office. remodel existing bathroom. replace existing windows per plan and all windows are not visible from street. relocation and install new furnace. relocate existing water heater.Details
demolition of existing kitchen and bath on second floor. relocation of kitchen and add home office. remodel existing bathroom. replace existing windows per plan and all windows are not visible from street. relocation and install new furnace. relocate existing water heater. | $58,000 |
| Jun 16, 2014 | Completed final sign-off Dec 2015 | 714 Broderick St | installation of a portable theraputic spa in (e) sitting room and storage space. move (e) electrical panel. build ramp and deck up to top spa.Details
installation of a portable theraputic spa in (e) sitting room and storage space. move (e) electrical panel. build ramp and deck up to top spa. | $60,000 |
| May 9, 2014 | Completed final sign-off Dec 2014 | 2955 22nd St | interior remodel of (e) sunroom @ rear of house, new windows & doors @ rear sunroom, exterior stairs, powder room to full bathroom. no added sq footage, no increase to footprint, no work on front facade.Details
interior remodel of (e) sunroom @ rear of house, new windows & doors @ rear sunroom, exterior stairs, powder room to full bathroom. no added sq footage, no increase to footprint, no work on front facade. | $50,000 |
| Apr 9, 2014 | Completed final sign-off Apr 2014 | 62 Webster St | rev. to pa#201306200049 install 2 cbx 8.2 metal chanel instead of 3. install 1 x 1 footing and 4 x 4 post to support the existing joist.Details
rev. to pa#201306200049 install 2 cbx 8.2 metal chanel instead of 3. install 1 x 1 footing and 4 x 4 post to support the existing joist. | |
| Mar 11, 2014 | Completed final sign-off May 2015 | 3747 20th St | two bathrooms remodel, re-tiling, changing fixtures.Details
two bathrooms remodel, re-tiling, changing fixtures. | $15,800 |
| Feb 20, 2014 | Completed final sign-off Jun 2014 | 101 Madrone Av | remodel 2 bathrooms on 2/f & 3/f, no wall to be changed, lighting to comply with cec 150(k)Details
remodel 2 bathrooms on 2/f & 3/f, no wall to be changed, lighting to comply with cec 150(k) | $15,000 |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 1924 Pine St | remove non-load bearing wall and stairs between kitchen and billiard room. build out new kitchen, laundry room, and master bathroom. add new spiral stair. new door, windows, and one skylight. new electrical and light fixtures.no work visible from the streetDetails
remove non-load bearing wall and stairs between kitchen and billiard room. build out new kitchen, laundry room, and master bathroom. add new spiral stair. new door, windows, and one skylight. new electrical and light fixtures.no work visible from the street | $70,000 |
| Nov 19, 2013 | Never finaled issued Dec 2013, no final | 2247 Webster St | document replaced foundation on south side of property shared with 2245 webster. reference permit #201210162113 and 201303252993 for permit for 2245 webster street.Details
document replaced foundation on south side of property shared with 2245 webster. reference permit #201210162113 and 201303252993 for permit for 2245 webster street. | |
| Nov 12, 2013 | Completed final sign-off Feb 2014 | 640 Victoria St | remove (e) tile, plumbing fixtures, light fixtures, install new tiles, plumbing & light fixtures. no wall to be changed.Details
remove (e) tile, plumbing fixtures, light fixtures, install new tiles, plumbing & light fixtures. no wall to be changed. | $6,000 |
| Aug 29, 2013 | Completed final sign-off Apr 2015 | 1759 14th Av | structural revision to pa# 2011-0907-4046/s1-due to insufficient (e) footings rebuild 1st floor framing (deck only)Details
structural revision to pa# 2011-0907-4046/s1-due to insufficient (e) footings rebuild 1st floor framing (deck only) | $10,000 |
| Jul 26, 2013 | Completed final sign-off Jan 2018 | 955 Natoma St | change of use from f-1 to r-3. 3rd floor vertical addition. 1st & 2nd floors alteration. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use from f-1 to r-3. 3rd floor vertical addition. 1st & 2nd floors alteration. ** maher: compliance with ordinance no# 155-13 not required ** | $350,000 |
| Jul 8, 2013 | Expired or cancelled expired Mar 2017 | 3686 Folsom St | renovate (e) kitchen, remove (e) cabinets, sink, remove 2 (e) skylights & 1 window. install new cabinets, appliances, sinks, lighting, electrical outlets & finishes. install 1 new skylight & 1 new window in (e) opening. (n) wood, (e) vinylDetails
renovate (e) kitchen, remove (e) cabinets, sink, remove 2 (e) skylights & 1 window. install new cabinets, appliances, sinks, lighting, electrical outlets & finishes. install 1 new skylight & 1 new window in (e) opening. (n) wood, (e) vinyl | $32,000 |
| Jun 20, 2013 | Completed final sign-off Apr 2014 | 62 Webster St | revision to pa# 201303071696; relocate 1st fl bath, install new interior stair to basement level.Details
revision to pa# 201303071696; relocate 1st fl bath, install new interior stair to basement level. | $15,000 |
| May 7, 2013 | Completed final sign-off May 2015 | 74 Aztec St | convert single car garage to family rm, double car garage to remain, const interior stairs from 1st to 2nd level, add a shower stall to (e) bath on lower level, move garage door locations, install (n) windows on lower level, install replacement windows on 2nd level, install (n) rooftop deckDetails
convert single car garage to family rm, double car garage to remain, const interior stairs from 1st to 2nd level, add a shower stall to (e) bath on lower level, move garage door locations, install (n) windows on lower level, install replacement windows on 2nd level, install (n) rooftop deck | $92,000 |
| Mar 25, 2013 | Expired or cancelled expired Apr 2019 | 2245 Webster St | addition of garage door & ramp and curb cut, fill in (e) side yard on all 3 levels approx614 sq ft)full interior remodel struct. upgrade new rear facade, new kitchen, new bathrms (2.5) new finishes thruout, new elect. thruout. repair (e) staircase. replace stair to garage, new doors & windowsDetails
addition of garage door & ramp and curb cut, fill in (e) side yard on all 3 levels approx614 sq ft)full interior remodel struct. upgrade new rear facade, new kitchen, new bathrms (2.5) new finishes thruout, new elect. thruout. repair (e) staircase. replace stair to garage, new doors & windows | $180,000 |
| Mar 22, 2013 | Completed final sign-off Jan 2014 | 140 Cerritos Av | remodel existing basement floor include new family room, new bath, laundry room, new hall & replace existing stairs to 1st floor at existing location with longer run to achieve shorter risers & deeper treads.Details
remodel existing basement floor include new family room, new bath, laundry room, new hall & replace existing stairs to 1st floor at existing location with longer run to achieve shorter risers & deeper treads. | $85,000 |
| Mar 15, 2013 | Completed final sign-off Apr 2014 | 760 Noe St | replace (e) fire escape w/new spiral stairs and new deck landing at rear yard.Details
replace (e) fire escape w/new spiral stairs and new deck landing at rear yard. | $8,000 |
| Mar 7, 2013 | Completed final sign-off Apr 2014 | 62 Webster St | basement conversion to conditioned living space (578 sf). install (1) new full bath & laundry. install new patio slab & stair to rear yard. install 6 new windows & 2 ext doors at rear. (not visible from street)Details
basement conversion to conditioned living space (578 sf). install (1) new full bath & laundry. install new patio slab & stair to rear yard. install 6 new windows & 2 ext doors at rear. (not visible from street) | $85,000 |
| Feb 19, 2013 | Completed final sign-off Jan 2016 | 871 Lawton St | remodel including: new 1/f coat closet, 376 sq. ft. 2/f rear addition & deck, new interior stairway wall openings, 2/f kitchen remodel, remodel 2/f powder room. new pocket doors at 2nd floor storage room; replace (e) windows & sliding glass doors at 2nd & 3rd floor, 142 sq.ft. 3rd floor front additnDetails
remodel including: new 1/f coat closet, 376 sq. ft. 2/f rear addition & deck, new interior stairway wall openings, 2/f kitchen remodel, remodel 2/f powder room. new pocket doors at 2nd floor storage room; replace (e) windows & sliding glass doors at 2nd & 3rd floor, 142 sq.ft. 3rd floor front additn | $125,000 |
| Feb 15, 2013 | Completed final sign-off Jun 2013 | 4087 17th St | change (e) laundry room to bathroom, change (e) bathroom to laundry & relocate closet. lighting to comply cec 180 (k).Details
change (e) laundry room to bathroom, change (e) bathroom to laundry & relocate closet. lighting to comply cec 180 (k). | $12,000 |
| Feb 5, 2013 | Completed final sign-off Sep 2013 | 67 Madrone Av | revision to appl #2012.0525.1278 - structural revision @ rear wall foundation.Details
revision to appl #2012.0525.1278 - structural revision @ rear wall foundation. | |
| Nov 15, 2012 | Completed final sign-off Feb 2013 | 482 Bright St | revision to 2o1208076743. keep (e) double hung window at rear rather than replace with tilt-turn unit. minor electrical changesDetails
revision to 2o1208076743. keep (e) double hung window at rear rather than replace with tilt-turn unit. minor electrical changes | |
| Nov 8, 2012 | Completed final sign-off Apr 2013 | 601 Moraga St | paint & repair drywall upstairs, insulate, install & replace drywall downstairs, repair, replace windows, replace lighting fixtures.Details
paint & repair drywall upstairs, insulate, install & replace drywall downstairs, repair, replace windows, replace lighting fixtures. | $18,000 |
| Oct 16, 2012 | Completed final sign-off Apr 2019 | 2245 Webster St | interior remodel to include 3 new bathrooms, new kitchen, new plumbing and electrical throughout, new mechanical, nw foundation. foundation to be lowered to create 8'6 clr headroom in basement. new exercise room in basementDetails
interior remodel to include 3 new bathrooms, new kitchen, new plumbing and electrical throughout, new mechanical, nw foundation. foundation to be lowered to create 8'6 clr headroom in basement. new exercise room in basement | $230,000 |
| Oct 15, 2012 | Completed final sign-off Feb 2013 | 779 10th Av | removed (e) plumbing fixtures, light fixtures, tile wall and floor. install new plumbing fixtures tile wall and floor. no structure wall to be move. not visible from street.Details
removed (e) plumbing fixtures, light fixtures, tile wall and floor. install new plumbing fixtures tile wall and floor. no structure wall to be move. not visible from street. | $6,000 |