Block 0650, lot 010
1924 Pine St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,429 sq ft
- Lot
- 3,152 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 28, 2022 | In progress issued Mar 2024 | 1924 Pine St | Qse Construction | rev to pa202010106289: shoring design of cantilever piers in the non-constrained use has large potential risk as house in fact is constrained & thus we desire a safer design that is conservative.Details
rev to pa202010106289: shoring design of cantilever piers in the non-constrained use has large potential risk as house in fact is constrained & thus we desire a safer design that is conservative. | |
| Dec 19, 2022 | Never finaled issued Dec 2022, no final | 1924 Pine St | Mission Bay Construction Services Inc. | install (3) new gas fireplace inserts in (e) fireplace boxes. run (n) gas lines. not to install in bedrooms, fireplace shall be direct-vent, gas vent per cmc802.6 & sfmc 802.6.2.Details
install (3) new gas fireplace inserts in (e) fireplace boxes. run (n) gas lines. not to install in bedrooms, fireplace shall be direct-vent, gas vent per cmc802.6 & sfmc 802.6.2. | $15,000 |
| Mar 16, 2021 | Expired or cancelled withdrawn Oct 2021 | 1924 Pine St | Qse Construction | geo-grouting(permeation grouting) prior to implementation of foundation replacement under app#202010106289 under review.Details
geo-grouting(permeation grouting) prior to implementation of foundation replacement under app#202010106289 under review. | $25,000 |
| Oct 10, 2020 | Never finaled issued Aug 2022, no final | 1924 Pine St | Qse Construction | expanding (e) garage,adding foundation walls and a mat slab foundation for unfinished/unheated basement space, widening the garage door slightly for easier entrance and enclosing an area at the garage/basement level to build a stair between garage and the main floor.Details
expanding (e) garage,adding foundation walls and a mat slab foundation for unfinished/unheated basement space, widening the garage door slightly for easier entrance and enclosing an area at the garage/basement level to build a stair between garage and the main floor. | $99,000 |
| Jul 5, 2019 | Never finaled issued Jul 2019, no final | 1924 Pine St | Qse Construction | rev to pa201907014856. voluntary seismi improvement per 2016cebc[bs]403.9. for the removal of the older year 1900 red brick foundation with a new redundatutly conservative dutile reinforced concrete foundation as shows on plans.Details
rev to pa201907014856. voluntary seismi improvement per 2016cebc[bs]403.9. for the removal of the older year 1900 red brick foundation with a new redundatutly conservative dutile reinforced concrete foundation as shows on plans. | $65,000 |
| Jul 1, 2019 | Expired or cancelled cancelled Jul 2019 | 1924 Pine St | Qse Construction | voluntary structural strengthening. install new 5/8" diameter x 18" long epoxy a.b. in 3/4" diameter x 12" min deep holes typacal all around garage / foundation at 32" o.c max at porperty line w/ access to make more safe.Details
voluntary structural strengthening. install new 5/8" diameter x 18" long epoxy a.b. in 3/4" diameter x 12" min deep holes typacal all around garage / foundation at 32" o.c max at porperty line w/ access to make more safe. | $4,000 |
| Dec 10, 2013 | Completed final sign-off Feb 2015 | 1924 Pine St | Royal Lyon Construction | remove non-load bearing wall and stairs between kitchen and billiard room. build out new kitchen, laundry room, and master bathroom. add new spiral stair. new door, windows, and one skylight. new electrical and light fixtures.no work visible from the streetDetails
remove non-load bearing wall and stairs between kitchen and billiard room. build out new kitchen, laundry room, and master bathroom. add new spiral stair. new door, windows, and one skylight. new electrical and light fixtures.no work visible from the street | $70,000 |
| Jan 12, 2011 | Never finaled issued Jan 2011, no final | 1924 Pine St | streetspaceDetails
streetspace | ||
| Jun 15, 2010 | Expired or cancelled cancelled Dec 2010 | 1924 Pine St | Professional Concrete Work | garage extension / (n) garage ret. wall. all work to be within bldg. footprint.Details
garage extension / (n) garage ret. wall. all work to be within bldg. footprint. | $40,000 |
| May 12, 2010 | Completed final sign-off Dec 2010 | 1924 Pine St | Phase 2 Builders | remove non-load bearing wall between living room & dining room, re-configure doorways between hall & living, hall & dining. flush frame beam in media room. re-configure entires to media & master bedrooms. renovate 2nd floor bathroom, install new lights & attic furnaceDetails
remove non-load bearing wall between living room & dining room, re-configure doorways between hall & living, hall & dining. flush frame beam in media room. re-configure entires to media & master bedrooms. renovate 2nd floor bathroom, install new lights & attic furnace | $32,500 |
| Jul 16, 2003 | Completed final sign-off Aug 2003 | 1924 Pine St | renew 200110312154 for final inspection.Details
renew 200110312154 for final inspection. | ||
| Feb 11, 2002 | Expired or cancelled expired Jan 2003 | 1924 Pine St | S.F.A-1 Roofing & Maintenance | reroofingDetails
reroofing | $9,500 |
| Oct 31, 2001 | Expired or cancelled expired Oct 2003 | 1924 Pine St | geo grout interitions (non hazardouz-toxic) to provide temporary shoring for adjacent property (1926Details
geo grout interitions (non hazardouz-toxic) to provide temporary shoring for adjacent property (1926 | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.