Qse Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2026
- Last 24 months
- 8 permits filed
341 permits since 2000: 214 completed, 7 in progress, 55 never finaled, 65 expired or cancelled.
Of the 55 never-finaled permits, 6 are 3 to 5 years old, 16 are 5 to 10 years old, 33 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 341.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2026 | In progress issued Sep 2026 | 617 Irving St | install ada restroom and remove abandoned gas/ water/ elect.Details
install ada restroom and remove abandoned gas/ water/ elect. | $10,000 |
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 1953 Eddy St | red brick unreinforced masonry chimneys have cracked/shifted & must be removed for safety.Details
red brick unreinforced masonry chimneys have cracked/shifted & must be removed for safety. | $5,000 |
| May 29, 2026 | In progress issued Jun 2026 | 102 Greenwood Av | stucco and dryrot repairs, in kind, front of bldg. ~200sqftDetails
stucco and dryrot repairs, in kind, front of bldg. ~200sqft | $9,000 |
| May 27, 2026 | Completed final sign-off Jul 2026 | 1953 Eddy St | voluntary strengthening to existing, 1890's u.r.m. brick foundation. provide a new reinforced concrete foundation cap with 3/4" deep grouted dowels into this urm at 16" o.c. and new 3x6 p.t. sill plates w/ hdg 5/8" ab 32" oc ti fdb, 1/2" 5 ply sheathing to (e) studs & post base and caps.Details
voluntary strengthening to existing, 1890's u.r.m. brick foundation. provide a new reinforced concrete foundation cap with 3/4" deep grouted dowels into this urm at 16" o.c. and new 3x6 p.t. sill plates w/ hdg 5/8" ab 32" oc ti fdb, 1/2" 5 ply sheathing to (e) studs & post base and caps. | $26,600 |
| Jul 1, 2025 | In progress filed Jul 2025, not yet issued | 102 Greenwood Av | voluntary strengthening and additonal clarifications of existing home shoring system for approved permit 202312072097Details
voluntary strengthening and additonal clarifications of existing home shoring system for approved permit 202312072097 | $100,000 |
| Apr 4, 2025 | Completed final sign-off May 2025 | 23 Cresta Vista Dr | voluntary safety upgrade to (e) original 1941 sill plates w/ new 5/8"x12" long anchor bolts and nuts w/plate washers all over along w/ simpson connectors as required for safety and finally add 5ply cdx sheathing around exposed snps w/ 10 de 4"o.c.e.n.Details
voluntary safety upgrade to (e) original 1941 sill plates w/ new 5/8"x12" long anchor bolts and nuts w/plate washers all over along w/ simpson connectors as required for safety and finally add 5ply cdx sheathing around exposed snps w/ 10 de 4"o.c.e.n. | $8,500 |
| Dec 2, 2024 | Completed final sign-off May 2025 | 1220 14th Av | ref. 201605117164, unit #104, 15% replacement of the exterior deck steel guard-rail to be repaired from non-structural rust damage. no changes to designDetails
ref. 201605117164, unit #104, 15% replacement of the exterior deck steel guard-rail to be repaired from non-structural rust damage. no changes to design | $1,000 |
| Oct 18, 2024 | Completed final sign-off May 2025 | 617 Irving St | perform accessibility upgrades per abe report 202307247966 including. relocate hardware on door and install battery operator power actuator.Details
perform accessibility upgrades per abe report 202307247966 including. relocate hardware on door and install battery operator power actuator. | $7,500 |
| Sep 6, 2024 | Completed final sign-off May 2025 | 619 Irving St | install battery operated power assist and actuator for each address. abe #202308168272.Details
install battery operated power assist and actuator for each address. abe #202308168272. | $4,000 |
| Sep 6, 2024 | Completed final sign-off May 2025 | 621 Irving St | install battery operated power assist and actuator for abe #202308168273.Details
install battery operated power assist and actuator for abe #202308168273. | $4,000 |
| Jul 8, 2024 | Expired or cancelled cancelled Jan 2026 | 2262 Pine St | kitchen remodel like in kind: remove and replace broicon granite, countertop with new sink - no new faucets. minor kitchen rehab (e) cabinets and appliances to remain.Details
kitchen remodel like in kind: remove and replace broicon granite, countertop with new sink - no new faucets. minor kitchen rehab (e) cabinets and appliances to remain. | $5,000 |
| Jul 8, 2024 | In progress issued Jul 2024 | 366 15th Av | revise permit# 202404250779 which was a revision to 202303033042: to shore and ugprade entire ground floor to comply with nov# 202422382.Details
revise permit# 202404250779 which was a revision to 202303033042: to shore and ugprade entire ground floor to comply with nov# 202422382. | $150,000 |
| May 30, 2024 | Completed final sign-off Jun 2024 | 292 30th St | to obtain final inspection for work approved under 201907095463 & 202009053613. all work is completeDetails
to obtain final inspection for work approved under 201907095463 & 202009053613. all work is complete | |
| May 7, 2024 | In progress issued Apr 2025 | 102 Greenwood Av | renovation of extg house within the extg footprint of the home. excavation of basement level to allow for voluntary seismic upgrades & conditioned space on the ground level. nw interior staircase. nw windows to match extg & within the westwood park design guidelines, dormer windows per sf planningDetails
renovation of extg house within the extg footprint of the home. excavation of basement level to allow for voluntary seismic upgrades & conditioned space on the ground level. nw interior staircase. nw windows to match extg & within the westwood park design guidelines, dormer windows per sf planning | $250,000 |
| Mar 29, 2024 | Completed final sign-off Apr 2024 | 133 07th Av | to obtain final inspection for work approved under pa# 201006235156. all work is complete.Details
to obtain final inspection for work approved under pa# 201006235156. all work is complete. | |
| Mar 11, 2024 | Expired or cancelled cancelled Mar 2026 | 326 Cortland Av | this 118 year property line wood framed wall on this west side of this building has termite damage as seen in front where the cermaic tiles fell off showing vs all. we must open up this wall and find out all damage.Details
this 118 year property line wood framed wall on this west side of this building has termite damage as seen in front where the cermaic tiles fell off showing vs all. we must open up this wall and find out all damage. | $5,000 |
| Nov 29, 2023 | Expired or cancelled cancelled Jan 2024 | 328 Cortland Av | all below grade utility pipes coming into the building must be photographed for insurance company and then covered. must remove wood seat/trim, demo concrete (interior) slab, excavate to expose all pipes to photograph and then restore area to original.Details
all below grade utility pipes coming into the building must be photographed for insurance company and then covered. must remove wood seat/trim, demo concrete (interior) slab, excavate to expose all pipes to photograph and then restore area to original. | $900 |
| Oct 12, 2023 | In progress filed Oct 2023, not yet issued | 818 Leavenworth St | install temp 8'ft scaold indoors on upper levelDetails
install temp 8'ft scaold indoors on upper level | $5,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2024 | 818 Leavenworth St | voluntary lateral force-resisiting system alterations also revovating existing restroom to full accessible restroomDetails
voluntary lateral force-resisiting system alterations also revovating existing restroom to full accessible restroom | $25,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 848 Waller St | voluntary lateral force resisting systems alteration on this existing red brick u.r.m foundation with center core anchor bolting and new concrete capping to insure bank and insurance co. happiness to this 125 yr old homw. voluntary seismic upgrade. no exterior work.Details
voluntary lateral force resisting systems alteration on this existing red brick u.r.m foundation with center core anchor bolting and new concrete capping to insure bank and insurance co. happiness to this 125 yr old homw. voluntary seismic upgrade. no exterior work. | $29,000 |
| Mar 10, 2023 | Never finaled issued Jul 2023, no final | 2644 Larkin St | temporary excavation shoring system to alllow construction, ref pa# 202207279411. scope involves constructing an extention of (e) basement & 2nd lvl 1' to 2' below (e) flr lvls. where portions of new foundations are below (e) foundations, new construction will be performed sequentially in hand-dugDetails
temporary excavation shoring system to alllow construction, ref pa# 202207279411. scope involves constructing an extention of (e) basement & 2nd lvl 1' to 2' below (e) flr lvls. where portions of new foundations are below (e) foundations, new construction will be performed sequentially in hand-dug | $22,000 |
| Dec 28, 2022 | In progress issued Mar 2024 | 1924 Pine St | rev to pa202010106289: shoring design of cantilever piers in the non-constrained use has large potential risk as house in fact is constrained & thus we desire a safer design that is conservative.Details
rev to pa202010106289: shoring design of cantilever piers in the non-constrained use has large potential risk as house in fact is constrained & thus we desire a safer design that is conservative. | |
| Aug 11, 2022 | Never finaled issued Aug 2022, no final | 41 05th Av | revision 202107275189. replace e foundation at east wall along garage entryDetails
revision 202107275189. replace e foundation at east wall along garage entry | $5,000 |
| Jul 27, 2022 | Never finaled issued Feb 2023, no final | 2644 Larkin St | expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd flDetails
expand existing basement garage and remodel 1st fl including lower floor level; create new stair from 1st fl to garage; remodel (e) bathroom, convert storage to living area. no work at 2nd & 3rd fl | $105,000 |
| Jul 19, 2022 | Never finaled issued Oct 2022, no final | 4052 18th St | provide concovtric mid-support post/beam to stop joist breaks. provide west side neighbor undermining settlment safety matt slab. provide a front steel monment frame for lateral safetyDetails
provide concovtric mid-support post/beam to stop joist breaks. provide west side neighbor undermining settlment safety matt slab. provide a front steel monment frame for lateral safety | $65,000 |
| Jun 21, 2022 | Completed final sign-off Aug 2022 | 1900 Washington St | add non structural 4" concrete wall protection to existing concrete perimeter wall at south west corner of ground floor where exterior soil backfill placement allows inside air condensation of warm air on cooler concrete.Details
add non structural 4" concrete wall protection to existing concrete perimeter wall at south west corner of ground floor where exterior soil backfill placement allows inside air condensation of warm air on cooler concrete. | $8,000 |
| May 10, 2022 | Expired or cancelled cancelled Oct 2022 | 4619 Lincoln Wy | pa# 2022-0405-1607 for final inspection mistakengly stated "all work is complete" and this is wrong, must repair (e) rear p.t. decking/beam connection corrosion so we can submit speacial inspectionsDetails
pa# 2022-0405-1607 for final inspection mistakengly stated "all work is complete" and this is wrong, must repair (e) rear p.t. decking/beam connection corrosion so we can submit speacial inspections | $5,000 |
| May 2, 2022 | Completed final sign-off Jul 2022 | 4052 18th St | to restore the existing first floor level to its original use as a dwelling. (no other changes) see 2022-00146 prvDetails
to restore the existing first floor level to its original use as a dwelling. (no other changes) see 2022-00146 prv | |
| Mar 24, 2022 | Completed final sign-off Apr 2022 | 4054 18th St | 2019 california (e) building code chapter 5 (bs)503.13 voluntary lateral force resisting system alterations to the existing red brick perimeter and interior fndtn w/possible minor rot repair to sill plans & requires 5/8" no c.c. a.b. typ @ 32" o.c. & stucco protect all perimeter brick in crawlspaceDetails
2019 california (e) building code chapter 5 (bs)503.13 voluntary lateral force resisting system alterations to the existing red brick perimeter and interior fndtn w/possible minor rot repair to sill plans & requires 5/8" no c.c. a.b. typ @ 32" o.c. & stucco protect all perimeter brick in crawlspace | $33,660 |
| Nov 23, 2021 | Completed final sign-off Jan 2022 | 1052 Montgomery St | voluntary lateral force-resisting system alterations to existing east and south concrete footings with addition of 5/8" hd6, anchor bolts in 18" deep epoxy fill hole at 16" o.c. with standard normal sf minor rot repair.Details
voluntary lateral force-resisting system alterations to existing east and south concrete footings with addition of 5/8" hd6, anchor bolts in 18" deep epoxy fill hole at 16" o.c. with standard normal sf minor rot repair. | $7,000 |
| Nov 19, 2021 | Never finaled issued Sep 2022, no final | 1781 Church St | rev to pa201708185327 & 201708185329 affecting 1793 church st only. add steel framing & foundations.Details
rev to pa201708185327 & 201708185329 affecting 1793 church st only. add steel framing & foundations. | $20,000 |
| Aug 6, 2021 | Never finaled issued Aug 2021, no final | 37 05th Av | soil grouting to facilitate work at 41 5th aveDetails
soil grouting to facilitate work at 41 5th ave | $10,000 |
| Jul 27, 2021 | Expired or cancelled withdrawn Dec 2021 | 41 05th Av | shoring for foundatin replacement rev 202105251020Details
shoring for foundatin replacement rev 202105251020 | |
| Jul 27, 2021 | Expired or cancelled expired May 2025 | 41 05th Av | revision to 202102104429: revise detail 1/55 to maintain extg foundation in northwest portion. extend garage approx 8' to west below grade.Details
revision to 202102104429: revise detail 1/55 to maintain extg foundation in northwest portion. extend garage approx 8' to west below grade. | $50,000 |
| Jul 12, 2021 | Completed final sign-off Feb 2022 | 2927 Sacramento St | existing concrete foundation underpinned with red brick unreinforced masonry so building to have voluntary seismic safety improvement using 2019 cebc gs 503.13 upgrade voluntary lateral force system alterationsDetails
existing concrete foundation underpinned with red brick unreinforced masonry so building to have voluntary seismic safety improvement using 2019 cebc gs 503.13 upgrade voluntary lateral force system alterations | $50,000 |
| May 25, 2021 | Expired or cancelled expired May 2025 | 41 05th Av | temporary shoring for foundation work under pa 202102104429.Details
temporary shoring for foundation work under pa 202102104429. | $7,580 |
| Apr 20, 2021 | Completed final sign-off Oct 2021 | 604 Waller St | revision to mandatory soft story permit 2018 0914 0226 & 2021 0126 3279. revise lenghth of shear wall in garage- rev .2 onlyDetails
revision to mandatory soft story permit 2018 0914 0226 & 2021 0126 3279. revise lenghth of shear wall in garage- rev .2 only | $1,000 |
| Mar 26, 2021 | Completed final sign-off Dec 2025 | 324 Collingwood St | reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub.Details
reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub. | $25,000 |
| Mar 16, 2021 | Expired or cancelled withdrawn Oct 2021 | 1924 Pine St | geo-grouting(permeation grouting) prior to implementation of foundation replacement under app#202010106289 under review.Details
geo-grouting(permeation grouting) prior to implementation of foundation replacement under app#202010106289 under review. | $25,000 |
| Feb 10, 2021 | Never finaled issued Apr 2021, no final | 41 05th Av | perform voluntary siesmic upgrade of basement level. replace existing foundation and enlarge garage. no change to exterior or flr level above garage.Details
perform voluntary siesmic upgrade of basement level. replace existing foundation and enlarge garage. no change to exterior or flr level above garage. | $137,000 |
| Jan 26, 2021 | Completed final sign-off Oct 2021 | 604 Waller St | revision to pa# 201809140226. replace (e) brick foundation with (n) concrete foundation. change plywood shearwall to strong wall. change hardy frame to plywood shear wall.Details
revision to pa# 201809140226. replace (e) brick foundation with (n) concrete foundation. change plywood shearwall to strong wall. change hardy frame to plywood shear wall. | $100,000 |
| Oct 10, 2020 | Never finaled issued Aug 2022, no final | 1924 Pine St | expanding (e) garage,adding foundation walls and a mat slab foundation for unfinished/unheated basement space, widening the garage door slightly for easier entrance and enclosing an area at the garage/basement level to build a stair between garage and the main floor.Details
expanding (e) garage,adding foundation walls and a mat slab foundation for unfinished/unheated basement space, widening the garage door slightly for easier entrance and enclosing an area at the garage/basement level to build a stair between garage and the main floor. | $99,000 |
| Oct 9, 2020 | Expired or cancelled expired Dec 2024 | 324 Collingwood St | legalize use of space constructed under previous permit, 2018-0516-9323 s1Details
legalize use of space constructed under previous permit, 2018-0516-9323 s1 | $12,000 |
| Sep 30, 2020 | Expired or cancelled cancelled Jan 2026 | 1843 Grant Av | recommencement and completion of work approved under permit application # 201805108759. this job has 10% of workDetails
recommencement and completion of work approved under permit application # 201805108759. this job has 10% of work | $2,000 |
| Sep 5, 2020 | Completed final sign-off Jun 2024 | 292 30th St | revision to pa #201907095463: seismic retrofit per sf ordinance #66-13 seismic strengthening of soft-story wood frame buildings. no change to building footprint or exterior appearances.Details
revision to pa #201907095463: seismic retrofit per sf ordinance #66-13 seismic strengthening of soft-story wood frame buildings. no change to building footprint or exterior appearances. | $80,000 |
| Mar 4, 2020 | Completed final sign-off Jul 2024 | 2120 Chestnut St | (commercial) compliance with mandatory seismic retrofit program per sfebc ch 4d and 2016 cebc app a4. ** maher: n/a **Details
(commercial) compliance with mandatory seismic retrofit program per sfebc ch 4d and 2016 cebc app a4. ** maher: n/a ** | $10,334 |
| Mar 4, 2020 | Completed final sign-off Jul 2024 | 2120 Chestnut St | (residential) compliance with mandatory seismic retrofit program per sfebc ch 4d and 2016 cebc app a4. ** maher: n/a **Details
(residential) compliance with mandatory seismic retrofit program per sfebc ch 4d and 2016 cebc app a4. ** maher: n/a ** | $31,000 |
| Feb 14, 2020 | Never finaled issued Mar 2020, no final | 1273 Rhode Island St | revise pa #202002043522 with new cbc (bd) 503.b voluntary reinforcement of existing concrete retaining walls of the rear building, add drainage; install plywood sheathing in existing perimeter walls on the lower level.Details
revise pa #202002043522 with new cbc (bd) 503.b voluntary reinforcement of existing concrete retaining walls of the rear building, add drainage; install plywood sheathing in existing perimeter walls on the lower level. | $70,000 |
| Feb 12, 2020 | Completed final sign-off Feb 2020 | 1400 Greenwich St | to obtain final inspection approved under pa# 9616012. all work is complete.Details
to obtain final inspection approved under pa# 9616012. all work is complete. | |
| Feb 5, 2020 | Expired or cancelled cancelled Mar 2021 | 26 Eagle St | repair rear foundation that has failed. add pier and grade beam foundation at rear. all work with in extg foot print.Details
repair rear foundation that has failed. add pier and grade beam foundation at rear. all work with in extg foot print. | $30,000 |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 1273 Rhode Island St | strengthen (e) perimeter sill plates w/ (n) 5/8" diameter 13" long epoxy anchor bolts in 3/4" diameter x9" deep clean epoxy filled holes typical at 16" o.c. all around (e) house for safetyDetails
strengthen (e) perimeter sill plates w/ (n) 5/8" diameter 13" long epoxy anchor bolts in 3/4" diameter x9" deep clean epoxy filled holes typical at 16" o.c. all around (e) house for safety | $5,000 |
| Jan 17, 2020 | Completed final sign-off Feb 2021 | 1848 Page St | revision to 201712085950 revise ordinary moment frame column connectionDetails
revision to 201712085950 revise ordinary moment frame column connection | |
| Jul 18, 2019 | Completed final sign-off Nov 2019 | 1140 Hyde St | revision to 201709066972 revise ordinary moment frame @ garage entry to hardy panelsDetails
revision to 201709066972 revise ordinary moment frame @ garage entry to hardy panels | |
| Jul 15, 2019 | Completed final sign-off Sep 2019 | 2737 Sutter St | the rear wall of his extg bldg soft story app#201810123089 has termit damage that is to be repaired here for the safety of tenants.Details
the rear wall of his extg bldg soft story app#201810123089 has termit damage that is to be repaired here for the safety of tenants. | $5,000 |
| Jul 9, 2019 | Completed final sign-off Jun 2024 | 292 30th St | to comply with nov 201813631: seismic retrofit per 2016 cebcDetails
to comply with nov 201813631: seismic retrofit per 2016 cebc | $80,000 |
| Jul 5, 2019 | Never finaled issued Jul 2019, no final | 1924 Pine St | rev to pa201907014856. voluntary seismi improvement per 2016cebc[bs]403.9. for the removal of the older year 1900 red brick foundation with a new redundatutly conservative dutile reinforced concrete foundation as shows on plans.Details
rev to pa201907014856. voluntary seismi improvement per 2016cebc[bs]403.9. for the removal of the older year 1900 red brick foundation with a new redundatutly conservative dutile reinforced concrete foundation as shows on plans. | $65,000 |
| Jul 1, 2019 | Expired or cancelled cancelled Jul 2019 | 1924 Pine St | voluntary structural strengthening. install new 5/8" diameter x 18" long epoxy a.b. in 3/4" diameter x 12" min deep holes typacal all around garage / foundation at 32" o.c max at porperty line w/ access to make more safe.Details
voluntary structural strengthening. install new 5/8" diameter x 18" long epoxy a.b. in 3/4" diameter x 12" min deep holes typacal all around garage / foundation at 32" o.c max at porperty line w/ access to make more safe. | $4,000 |
| Apr 16, 2019 | Completed final sign-off Apr 2019 | 291 Richland Av | voluntary improvement to (e) exposed open basement foundation elements with n 5/8" x 18" hdg a,b,@16" o.c. to 3x6 p.t. sill plates & add simpson a34 zmax connectors to each studDetails
voluntary improvement to (e) exposed open basement foundation elements with n 5/8" x 18" hdg a,b,@16" o.c. to 3x6 p.t. sill plates & add simpson a34 zmax connectors to each stud | $3,740 |
| Mar 11, 2019 | Expired or cancelled suspend Aug 2025 | 3251 Scott St | reroofingDetails
reroofing | $50,000 |
| Mar 4, 2019 | Completed final sign-off Apr 2019 | 370 11th Av | 2016 cebc section lbs7 403.9 voluntary seismic improvement to extg unreinforced brick masonry perimeter foundation to provide new reinforced concrete masonry continuous foundation with 5/8" and a.b. at 16" o.c. all around.Details
2016 cebc section lbs7 403.9 voluntary seismic improvement to extg unreinforced brick masonry perimeter foundation to provide new reinforced concrete masonry continuous foundation with 5/8" and a.b. at 16" o.c. all around. | $25,000 |
| Feb 15, 2019 | Completed final sign-off Oct 2020 | 2523 Steiner St | revision to 201811135678. add drainage and waterproofing plans and vertical/lateral shoring along with adding voluntary seismic improvements for extra safetyDetails
revision to 201811135678. add drainage and waterproofing plans and vertical/lateral shoring along with adding voluntary seismic improvements for extra safety | |
| Jan 22, 2019 | Completed final sign-off Mar 2019 | 2020 Lawton St | to comply with nov201801881. ref exploratory pa201901039597. found balcony tension kittredge lag bolts looses from cyclic loading and pulled out thus balcony to be replace with hand rail safety use with stainless steel thru-bolts and wood wood upgrades.Details
to comply with nov201801881. ref exploratory pa201901039597. found balcony tension kittredge lag bolts looses from cyclic loading and pulled out thus balcony to be replace with hand rail safety use with stainless steel thru-bolts and wood wood upgrades. | $20,000 |
| Jan 16, 2019 | Expired or cancelled cancelled Nov 2019 | 629 Haight St | simpson a35 z max connecting and 5/8" epoxy anchor bolt @ 16" o.c. over concrete grout solid 8" min embedment.Details
simpson a35 z max connecting and 5/8" epoxy anchor bolt @ 16" o.c. over concrete grout solid 8" min embedment. | $5,000 |
| Jan 3, 2019 | Completed final sign-off Mar 2019 | 2020 Lawton St | front balcony failure (nov 201801881) requires scaffold placement on the front sidewalk and stucco demo for discavery of any and all issues to be repairdDetails
front balcony failure (nov 201801881) requires scaffold placement on the front sidewalk and stucco demo for discavery of any and all issues to be repaird | $10,000 |
| Jan 2, 2019 | Completed final sign-off Feb 2020 | 786 Clayton St | for better seismic safety & upgraded drawings per correction notice & report upgraded and complete drawings. reference application #201806152019Details
for better seismic safety & upgraded drawings per correction notice & report upgraded and complete drawings. reference application #201806152019 | $1,000 |
| Dec 4, 2018 | Completed final sign-off Jan 2019 | 1350 04th Av | 2016 iebc cbst 403.9 voluntary seismic inprovement old rotten 4x12 redwood sill places over concrete footing to be replaced with (n) 3x6 pt simpson plates & 5/8" h.d.g @ 16"oc in 3/4" x8 deep epoxy filled clean holes w/3"x3" plain washold dgg & comont grout for tight ti in still plans placementDetails
2016 iebc cbst 403.9 voluntary seismic inprovement old rotten 4x12 redwood sill places over concrete footing to be replaced with (n) 3x6 pt simpson plates & 5/8" h.d.g @ 16"oc in 3/4" x8 deep epoxy filled clean holes w/3"x3" plain washold dgg & comont grout for tight ti in still plans placement | $5,000 |
| Nov 21, 2018 | Completed final sign-off Feb 2020 | 786 Clayton St | bolting foundation, replace old mudsills w/new 3x6 pt. 5/8 hdg. all in rear epoxied at 16" oc. 8" min embedment in existing foundation w/3x3 washers.Details
bolting foundation, replace old mudsills w/new 3x6 pt. 5/8 hdg. all in rear epoxied at 16" oc. 8" min embedment in existing foundation w/3x3 washers. | $10,000 |
| Oct 23, 2018 | Completed final sign-off Dec 2018 | 1220 14th Av | re pa# 201805118947; for 3 columns to be replaced is now 5 concrete colums to be replaced due to corrosion of rrebar and weak concrete thereDetails
re pa# 201805118947; for 3 columns to be replaced is now 5 concrete colums to be replaced due to corrosion of rrebar and weak concrete there | $20,000 |
| Oct 9, 2018 | Completed final sign-off Dec 2018 | 1240 07th Av | rev to pa# 201612296138; moving shearwall on other side of stud wall.Details
rev to pa# 201612296138; moving shearwall on other side of stud wall. | |
| Jul 19, 2018 | Completed final sign-off Nov 2020 | 154 10th St | soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4 | $49,000 |
| Jul 2, 2018 | Completed final sign-off Oct 2018 | 98 Ina Ct | place new concrete retaining wall against existing wood retaining wall for sfdbi nov #200340475, clean up and safetyDetails
place new concrete retaining wall against existing wood retaining wall for sfdbi nov #200340475, clean up and safety | $20,000 |
| Jun 15, 2018 | Completed final sign-off Feb 2020 | 786 Clayton St | enlarge extg garage at the basement to 3 car parking. enlarge garage door to 9'-8"excavation not to exceed 8 ft in depthDetails
enlarge extg garage at the basement to 3 car parking. enlarge garage door to 9'-8"excavation not to exceed 8 ft in depth | $100,000 |
| Jun 8, 2018 | Completed final sign-off Jul 2018 | 1868 Vallejo St | revision to soft story pa #201708164945. provide (n) shearwall in place of moment frame, keep (e) brick footing at (n) shearwalls at exterior property line wall, provide (n) concrete cap at shearwalls on (e) brick, provide (n) shearwall at back wall.Details
revision to soft story pa #201708164945. provide (n) shearwall in place of moment frame, keep (e) brick footing at (n) shearwalls at exterior property line wall, provide (n) concrete cap at shearwalls on (e) brick, provide (n) shearwall at back wall. | |
| May 16, 2018 | Never finaled issued Jun 2020, no final | 324 Collingwood St | add a garage under (e) house. (e) residence to remain unchanged.Details
add a garage under (e) house. (e) residence to remain unchanged. | $40,000 |
| May 11, 2018 | Completed final sign-off Aug 2018 | 1220 14th Av | 3 exiting concrete columns to be shored and upgraded with new ductile epoxy coated rebar as allowed with a bs 403.9 voluntary seilsmic improvment per 2016 cebcDetails
3 exiting concrete columns to be shored and upgraded with new ductile epoxy coated rebar as allowed with a bs 403.9 voluntary seilsmic improvment per 2016 cebc | $30,000 |
| May 10, 2018 | Never finaled issued May 2018, no final | 1843 Grant Av | revision of app#2018-03-22-4366 with 2016 cebc 403.9 voluntary seismic improvements by adding new shear walls, safer concrete garage floor and voluntary upgrading roof joists as desiredDetails
revision of app#2018-03-22-4366 with 2016 cebc 403.9 voluntary seismic improvements by adding new shear walls, safer concrete garage floor and voluntary upgrading roof joists as desired | $25,000 |
| May 1, 2018 | Never finaled issued May 2018, no final | 1220 14th Av | previous permit 201511303697 for new handrails for units 202, 203, 205, 302, 304, 305. did not hot dip galvanize these new steel rails and now these handrails are to be galvanized . remove, galvanize, reinstall 6 railings.Details
previous permit 201511303697 for new handrails for units 202, 203, 205, 302, 304, 305. did not hot dip galvanize these new steel rails and now these handrails are to be galvanized . remove, galvanize, reinstall 6 railings. | $20,000 |
| Apr 19, 2018 | Completed final sign-off May 2018 | 1855 20th Av | voluntary seismic improvement with simpson post ties and post base connections along with new 5/8" h.d.g. , anchor bolts @ 16" o.c. and 12" embedment in epoxy filled holes thru new p.t. 3x blockingDetails
voluntary seismic improvement with simpson post ties and post base connections along with new 5/8" h.d.g. , anchor bolts @ 16" o.c. and 12" embedment in epoxy filled holes thru new p.t. 3x blocking | $14,400 |
| Apr 18, 2018 | Completed final sign-off Apr 2018 | 1606 33rd Av | Details
| $3,000 |
| Apr 17, 2018 | Completed final sign-off Jun 2019 | 2123 Market St | voluntary structural improvement to existing building. limited to the area below the 1st fl of the e 2 story wood framed building. no alteration to exterior of building.Details
voluntary structural improvement to existing building. limited to the area below the 1st fl of the e 2 story wood framed building. no alteration to exterior of building. | $20,000 |
| Mar 22, 2018 | Never finaled issued Mar 2018, no final | 1843 Grant Av | voluntary foundation sill plate anchor bolting w/new 5/8" on center x 12" lonhg h.d. galv. anchor bolts 32" on center all around and 3"x3" x 1/4" thick plate washers & nuts to each anchor bolt.Details
voluntary foundation sill plate anchor bolting w/new 5/8" on center x 12" lonhg h.d. galv. anchor bolts 32" on center all around and 3"x3" x 1/4" thick plate washers & nuts to each anchor bolt. | $8,000 |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 2161 Turk Bl | revision to 201707192330 revision to plywood shear walls and holdowns; soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
revision to 201707192330 revision to plywood shear walls and holdowns; soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | |
| Feb 23, 2018 | Expired or cancelled cancelled Jan 2026 | 2123 Market St | 2016 cebc chapter 4 {bs}403.9 voluntary seismic improvements. anchor bolt foundation, place post ties and provide shearwalls to this subject basement/crawlspaceDetails
2016 cebc chapter 4 {bs}403.9 voluntary seismic improvements. anchor bolt foundation, place post ties and provide shearwalls to this subject basement/crawlspace | $10,000 |
| Dec 20, 2017 | Completed final sign-off Feb 2018 | 472 03rd St | volunatry seismic improvement per 2016 cebc section bs 403.96. provide new archor bolting with 5/8" at center a.b at 32" oc. 8" embedement. all around perimeter and provide new simpson post base connections with rot repaira. all over crawl space. maher na.Details
volunatry seismic improvement per 2016 cebc section bs 403.96. provide new archor bolting with 5/8" at center a.b at 32" oc. 8" embedement. all around perimeter and provide new simpson post base connections with rot repaira. all over crawl space. maher na. | $15,888 |
| Dec 20, 2017 | Expired or cancelled cancelled Jan 2026 | 472 03rd St | in order to provide for a safe structural sidewalk here we must place a safety barricade and figure out what this existing sidewalk is made ofDetails
in order to provide for a safe structural sidewalk here we must place a safety barricade and figure out what this existing sidewalk is made of | $8,880 |
| Dec 8, 2017 | Completed final sign-off Feb 2021 | 1848 Page St | compliance with mandatory seismic retrofit program per 2016 sfebc chapter 4d & 2016 cebc appendix a-4.Details
compliance with mandatory seismic retrofit program per 2016 sfebc chapter 4d & 2016 cebc appendix a-4. | $70,000 |
| Nov 9, 2017 | Completed final sign-off Dec 2017 | 120 Guerrero St | to obtain final inspecion for work approved under pa #201606018899. all work is complete.Details
to obtain final inspecion for work approved under pa #201606018899. all work is complete. | |
| Nov 8, 2017 | Completed final sign-off Dec 2017 | 120 Guerrero St | to obtain a final inspection for work approved under pa# 201512215612, all work is completeDetails
to obtain a final inspection for work approved under pa# 201512215612, all work is complete | |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 825 24th Av | voluntary seismic improvement to (e) ground floor garage w/ 5/8" x12" long epoxy a.b. @ 32 o.c. using 63" plate washers and nuts along with placing simpson connection at existing post/beam joist and plywood sheath walls. front and back onlyDetails
voluntary seismic improvement to (e) ground floor garage w/ 5/8" x12" long epoxy a.b. @ 32 o.c. using 63" plate washers and nuts along with placing simpson connection at existing post/beam joist and plywood sheath walls. front and back only | $6,000 |
| Oct 31, 2017 | Completed final sign-off Mar 2018 | 828 Balboa St | 2016 iebc section 403.9 voluntary structural (seismic) improvements for the safety of these homeowners here with front u.r.m. stair upgrading and rear tall post upgrades using steel and concrete.Details
2016 iebc section 403.9 voluntary structural (seismic) improvements for the safety of these homeowners here with front u.r.m. stair upgrading and rear tall post upgrades using steel and concrete. | $18,500 |
| Oct 13, 2017 | Completed final sign-off Apr 2019 | 2340 Vallejo St | soft story retrofit per sfebc chapter 4d, engineering criteria. 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, engineering criteria. 2016 cebc appendix a-4. | $25,000 |
| Oct 4, 2017 | Never finaled issued Oct 2017, no final | 1240 07th Av | to obtain final inspection for work approved under pa #201104264809. all work is complete.Details
to obtain final inspection for work approved under pa #201104264809. all work is complete. | |
| Sep 27, 2017 | Completed final sign-off Jan 2020 | 451 38th Av | replacing extg footing with new footingDetails
replacing extg footing with new footing | $50,000 |
| Sep 20, 2017 | Completed final sign-off Oct 2017 | 828 Balboa St | siesmic improvement with the anchor bolting/earthquake safety upgrade of all wood sill plates w/ anchor bolts min 5/8" sq ft hdg ab @32" oc in 3/4" x 12" epoxy holes at garage area.Details
siesmic improvement with the anchor bolting/earthquake safety upgrade of all wood sill plates w/ anchor bolts min 5/8" sq ft hdg ab @32" oc in 3/4" x 12" epoxy holes at garage area. | $3,000 |
| Sep 15, 2017 | Completed final sign-off Oct 2018 | 3310 16th St | soft story retrofit per sfebc chapter 4d, engineering criteria:Details
soft story retrofit per sfebc chapter 4d, engineering criteria: | $50,000 |
| Sep 13, 2017 | Completed final sign-off Oct 2018 | 260 Carl St | compliance with mandatory soft story retrofit program, cebc 2016 app a4 & sfebc 2016 chp 4d.Details
compliance with mandatory soft story retrofit program, cebc 2016 app a4 & sfebc 2016 chp 4d. | $50,000 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 812 Church St | 2016 cebc voluntary structural improvements for safety of tenants as desired with front stair unreinforced masonry upgrade and rear tall posts upgrade with new conc grade beams and 3/4 at center diag. rodsDetails
2016 cebc voluntary structural improvements for safety of tenants as desired with front stair unreinforced masonry upgrade and rear tall posts upgrade with new conc grade beams and 3/4 at center diag. rods | $30,000 |
| Sep 6, 2017 | Completed final sign-off Apr 2019 | 3191 Washington St | compliance w/ mandatory seismic retrofit program per 2016 sfebc sec 4d & 2016 cebc appx a-4Details
compliance w/ mandatory seismic retrofit program per 2016 sfebc sec 4d & 2016 cebc appx a-4 | $65,000 |
| Sep 6, 2017 | Completed final sign-off Nov 2019 | 1140 Hyde St | compliance w/ mandatory soft story retrofit program, cebc 2016 app a-4 & sfebc 2016 chp 4dDetails
compliance w/ mandatory soft story retrofit program, cebc 2016 app a-4 & sfebc 2016 chp 4d | $50,000 |
| Aug 18, 2017 | Never finaled issued Apr 2021, no final | 1781 Church St | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ** maher: n/a **Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ** maher: n/a ** | $100,000 |