Permit GraphShortlistSan Francisco building permits since 2000

Block 1552, lot 025

828 Balboa St

City’s use
Single Family Residential
Built
1914
Stories
2
Units
1
Rooms
8 bathrooms
Building
2,550 sq ft
Lot
2,495 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

7 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 31, 2017Completed
final sign-off Mar 2018
828 Balboa StQse Construction2016 iebc section 403.9 voluntary structural (seismic) improvements for the safety of these homeowners here with front u.r.m. stair upgrading and rear tall post upgrades using steel and concrete.
Details
Permit
201710312792
Status
complete
Filed
Oct 31, 2017
Permit issued
Nov 1, 2017
Final sign-off
Mar 7, 2018
Declared cost
$18,500
Address
828 Balboa St

2016 iebc section 403.9 voluntary structural (seismic) improvements for the safety of these homeowners here with front u.r.m. stair upgrading and rear tall post upgrades using steel and concrete.

Open the permit page

$18,500
Sep 20, 2017Completed
final sign-off Oct 2017
828 Balboa StQse Constructionsiesmic improvement with the anchor bolting/earthquake safety upgrade of all wood sill plates w/ anchor bolts min 5/8" sq ft hdg ab @32" oc in 3/4" x 12" epoxy holes at garage area.
Details
Permit
201709209146
Status
complete
Filed
Sep 20, 2017
Permit issued
Sep 20, 2017
Final sign-off
Oct 20, 2017
Declared cost
$3,000
Address
828 Balboa St

siesmic improvement with the anchor bolting/earthquake safety upgrade of all wood sill plates w/ anchor bolts min 5/8" sq ft hdg ab @32" oc in 3/4" x 12" epoxy holes at garage area.

Open the permit page

$3,000
Aug 4, 2011Completed
final sign-off Oct 2011
828 Balboa StW.K. Construction Companyrepair dry rot and stucco at front of the house, no structural work
Details
Permit
201108041752
Status
complete
Filed
Aug 4, 2011
Permit issued
Aug 4, 2011
Final sign-off
Oct 24, 2011
Declared cost
$7,500
Address
828 Balboa St

repair dry rot and stucco at front of the house, no structural work

Open the permit page

$7,500
Aug 4, 2011Completed
final sign-off Oct 2011
828 Balboa StW.K. Construction Companyper inspector's request to pa 201107069591 the scope of work has increased from3 to 7 windows, windows face the street, no structural work, replace in kind, u factor .4
Details
Permit
201108041751
Status
complete
Filed
Aug 4, 2011
Permit issued
Aug 4, 2011
Final sign-off
Oct 24, 2011
Address
828 Balboa St

per inspector's request to pa 201107069591 the scope of work has increased from3 to 7 windows, windows face the street, no structural work, replace in kind, u factor .4

Open the permit page

Jul 6, 2011Completed
final sign-off Oct 2011
828 Balboa StW.K. Construction Companyreplace 3 anderson window at front of the house (wood windows) max u factor .40 in kind replacement. no change to wall & door.
Details
Permit
201107069591
Status
complete
Filed
Jul 6, 2011
Permit issued
Jul 6, 2011
Final sign-off
Oct 24, 2011
Declared cost
$9,000
Address
828 Balboa St

replace 3 anderson window at front of the house (wood windows) max u factor .40 in kind replacement. no change to wall & door.

Open the permit page

$9,000
Sep 22, 2009Completed
final sign-off Dec 2009
828 Balboa StW.K. Construction Companyrepair middle light well next to stairway and replace dry rot 2x4 woods. install 3/4 cdx plywood and roofing membrane. area 3'x8' long. repair & replace in kind.
Details
Permit
200909227345
Status
complete
Filed
Sep 22, 2009
Permit issued
Sep 22, 2009
Final sign-off
Dec 16, 2009
Declared cost
$4,000
Address
828 Balboa St

repair middle light well next to stairway and replace dry rot 2x4 woods. install 3/4 cdx plywood and roofing membrane. area 3'x8' long. repair & replace in kind.

Open the permit page

$4,000
Mar 5, 2008Never finaled
issued Mar 2008, no final
828 Balboa Ststreet space & sidewalk permit only.
Details
Permit
M110705
Status
issued
Filed
Mar 5, 2008
Permit issued
Mar 5, 2008
Address
828 Balboa St

street space & sidewalk permit only.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
W.K. Construction Company (4), Qse Construction (2)
Engineers
Thomas Lutge

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.