Block 1025, lot 032
2927 Sacramento St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 9,720 sq ft
- Lot
- 3,981 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2026 | Completed final sign-off May 2026 | 2927 Sacramento St | Hue & Cry Security System | as-built to fire alarm permit 201910285738. added 4 pull stations.Details
as-built to fire alarm permit 201910285738. added 4 pull stations. | |
| Jan 30, 2025 | Completed final sign-off Mar 2025 | 2927 Sacramento St | Markoff Structural Pest Control | markoff structural pest control termite report 18130 item#3. repair rear stairs less than 50%Details
markoff structural pest control termite report 18130 item#3. repair rear stairs less than 50% | $29,000 |
| Apr 1, 2022 | Completed final sign-off Aug 2022 | 2927 Sacramento St | Brighter Bay Builders Inc | unit 9: convert existing kitchen to bedroom. relocate kitchen. convert existing dining room to bathroom. install washer and dryer.Details
unit 9: convert existing kitchen to bedroom. relocate kitchen. convert existing dining room to bathroom. install washer and dryer. | $22,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 2927 Sacramento St | Aguilera Construction Company | unit #10: rehab(e) kitchen & (e) bathroom. install washer and dryer.Details
unit #10: rehab(e) kitchen & (e) bathroom. install washer and dryer. | $28,000 |
| Jul 12, 2021 | Completed final sign-off Feb 2022 | 2927 Sacramento St | Qse Construction | existing concrete foundation underpinned with red brick unreinforced masonry so building to have voluntary seismic safety improvement using 2019 cebc gs 503.13 upgrade voluntary lateral force system alterationsDetails
existing concrete foundation underpinned with red brick unreinforced masonry so building to have voluntary seismic safety improvement using 2019 cebc gs 503.13 upgrade voluntary lateral force system alterations | $50,000 |
| Nov 19, 2020 | Never finaled issued Mar 2021, no final | 2927 Sacramento St | Aguilera Construction Company | unit #5: revision to no plan pa# 202008262640: convert (e) kitchen to office. relocate kitchen and bathroom. install washer/dryer.Details
unit #5: revision to no plan pa# 202008262640: convert (e) kitchen to office. relocate kitchen and bathroom. install washer/dryer. | $40,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 2927 Sacramento St | Aguilera Construction Company | unit 5: remove/replace bathroom & kitchen fixtures same location, kitchen & bathroom remodel in-kind approximately 500 sq. ft.Details
unit 5: remove/replace bathroom & kitchen fixtures same location, kitchen & bathroom remodel in-kind approximately 500 sq. ft. | $30,000 |
| Mar 10, 2020 | Completed final sign-off Sep 2020 | 2927 Sacramento St | Aguilera Construction Company | unit 3: kitchen remodel and bathroom remodel 200 sqftDetails
unit 3: kitchen remodel and bathroom remodel 200 sqft | $20,000 |
| Jan 8, 2020 | Completed final sign-off Jun 2020 | 2927 Sacramento St | Aguilera Construction Company | unit # 12: remodel kitchen and bathroom in kind. no structural work. approx 200 sq ft.Details
unit # 12: remodel kitchen and bathroom in kind. no structural work. approx 200 sq ft. | $35,000 |
| Oct 28, 2019 | Completed final sign-off May 2026 | 2927 Sacramento St | Hue & Cry Security System | voluntary upgrade of fire alarm system like for like with additions of low frequency sounders to meet code 1103.7.6.1 for sleeping areasDetails
voluntary upgrade of fire alarm system like for like with additions of low frequency sounders to meet code 1103.7.6.1 for sleeping areas | $62,000 |
| Apr 16, 2019 | Never finaled issued Apr 2019, no final | 2927 Sacramento St | B-Side Inc. | unit 1: retile bathroom. install washer/dryer in existing closet, kitchen, counter top, kitchen cabinets, gfci in kitchen.Details
unit 1: retile bathroom. install washer/dryer in existing closet, kitchen, counter top, kitchen cabinets, gfci in kitchen. | $8,000 |
| Apr 16, 2019 | Never finaled issued Apr 2019, no final | 2927 Sacramento St | B-Side Inc. | unit 8: retile bathroom. install washer/dryer in existing closet, kitchen, counter top, kitchen cabinets, gfci in kitchen.Details
unit 8: retile bathroom. install washer/dryer in existing closet, kitchen, counter top, kitchen cabinets, gfci in kitchen. | $8,000 |
| Mar 29, 2019 | Never finaled issued Mar 2019, no final | 2927 Sacramento St | unit 7. install tile in bathroom floor. install washer dryer, install countertop, install kitchen cabinets. all electrical.Details
unit 7. install tile in bathroom floor. install washer dryer, install countertop, install kitchen cabinets. all electrical. | $18,000 | |
| Nov 6, 2017 | Never finaled issued Nov 2017, no final | 2927 Sacramento St | street spaceDetails
street space | ||
| Aug 29, 2014 | Completed final sign-off Feb 2015 | 2927 Sacramento St | Fred Pavlow Co. Inc Dba Add-A-Garage | soft story seismic retrofit to comply with sf ab 107, per fema p-807. maher n/aDetails
soft story seismic retrofit to comply with sf ab 107, per fema p-807. maher n/a | $25,000 |
| Sep 23, 2008 | Completed final sign-off Sep 2008 | 2927 Sacramento St | Tara Pro-Painting Inc | to repair/replace-rotted siding and framing as needed in-kind. on stairwell side wall 2 levels. to install insulation before siding. waterproof & paint approx 400 sq feet. not visible from street. r-13 insulation in wall.Details
to repair/replace-rotted siding and framing as needed in-kind. on stairwell side wall 2 levels. to install insulation before siding. waterproof & paint approx 400 sq feet. not visible from street. r-13 insulation in wall. | $12,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.