Aguilera Construction Company
- Based in
- Laguna Niguel
- On San Francisco permits
- Apr 2019 to Jan 2025
- Last 24 months
- 2 permits filed
140 permits since 2000: 71 completed, 3 in progress, 62 never finaled, 4 expired or cancelled.
Of the 62 never-finaled permits, 8 are 3 to 5 years old, 54 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 140.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2025 | Completed final sign-off Jun 2025 | 1438 Green St | remove and replace hardwood floor all unit remove and replace bathroom floor and laundry room paint unit, replace front door 2nd floor, all work is to repair water damageDetails
remove and replace hardwood floor all unit remove and replace bathroom floor and laundry room paint unit, replace front door 2nd floor, all work is to repair water damage | $15,000 |
| Oct 29, 2024 | Completed final sign-off Aug 2025 | 11 Agnon Av | interior remodel that includes removal of interior walls, remove (e) stairs to basement and install (n) stairs, kitchen remodel , bathroom remodel, convert partial basement into 1 bedroom, gym, and playroom. convert bedroom on 1st into master bathroom w/ walk in closet. relocate fau and water heaterDetails
interior remodel that includes removal of interior walls, remove (e) stairs to basement and install (n) stairs, kitchen remodel , bathroom remodel, convert partial basement into 1 bedroom, gym, and playroom. convert bedroom on 1st into master bathroom w/ walk in closet. relocate fau and water heater | $180,000 |
| Oct 2, 2023 | Completed final sign-off Nov 2023 | 181 Bartlett St | reroofingDetails
reroofing | $35,000 |
| Oct 2, 2023 | Completed final sign-off Oct 2023 | 1024 Alabama St | reroofingDetails
reroofing | $6,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 1017 Divisadero St | deferred mep submittal for pa# 202110070016. gas furnace installation.Details
deferred mep submittal for pa# 202110070016. gas furnace installation. | $8,000 |
| Aug 10, 2023 | In progress issued Mar 2024 | 833 22nd St | upgrade (e) commercial entry per ordinance 51-16 be program to comply w/accessible entrance program abe 202002111973 new power door openerDetails
upgrade (e) commercial entry per ordinance 51-16 be program to comply w/accessible entrance program abe 202002111973 new power door opener | $5,000 |
| Aug 10, 2023 | In progress issued Mar 2024 | 1005 Minnesota St | upgrade (e) commercial entry per ordinance 51-16 be program to comply w/accessible entrance program abe 202002111975 new interior landingDetails
upgrade (e) commercial entry per ordinance 51-16 be program to comply w/accessible entrance program abe 202002111975 new interior landing | $1,000 |
| Aug 9, 2023 | In progress issued Mar 2024 | 1001 Minnesota St | upgrade existing commercial entries per ordinance 51-16 abe program to comply w/accessible entrance program. modify threshold, remove hold-open. abe202002051721.Details
upgrade existing commercial entries per ordinance 51-16 abe program to comply w/accessible entrance program. modify threshold, remove hold-open. abe202002051721. | $500 |
| Jun 26, 2023 | Completed final sign-off Dec 2023 | 1017 Divisadero St | revision to pa# 2021-1007-0016, revise service counter layout.Details
revision to pa# 2021-1007-0016, revise service counter layout. | |
| May 23, 2023 | Completed final sign-off Jun 2023 | 214 Mallorca Wy | reroofing.Details
reroofing. | $9,000 |
| May 3, 2023 | Completed final sign-off Aug 2023 | 1655 Chestnut St | one non structural bath remodel. remove and replace bathroom fixtures same location vanity and tub, toiletDetails
one non structural bath remodel. remove and replace bathroom fixtures same location vanity and tub, toilet | $6,000 |
| Jan 24, 2023 | Never finaled issued Jan 2023, no final | 1334 South Van Ness Av | close up hole with drywall due to electrical work repairs 100 sqft approx. on one bedroom wall within unit. electrical under separate electrical permit.Details
close up hole with drywall due to electrical work repairs 100 sqft approx. on one bedroom wall within unit. electrical under separate electrical permit. | $5,000 |
| Dec 14, 2022 | Completed final sign-off Dec 2024 | 2627 Mission St | upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program; abe 2022-0705-2337Details
upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program; abe 2022-0705-2337 | $1,000 |
| Dec 14, 2022 | Completed final sign-off Dec 2024 | 2619 Mission St | upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program; abe 2019-1204-9254Details
upgrade (e) commercial entry per ordinance 51-16 abe program; to comply with accessible business entrance program; abe 2019-1204-9254 | $8,000 |
| Nov 21, 2022 | Completed final sign-off Dec 2022 | 2030 Franklin St | reroofingDetails
reroofing | $40,000 |
| Nov 17, 2022 | Completed final sign-off Mar 2024 | 900 Valencia St | upgrade (e) commercial entry per ordinance 51-16 abe program; to compy with accessible entrance program - abe 202206291965. install power door operator; replace door hardware to compliance.Details
upgrade (e) commercial entry per ordinance 51-16 abe program; to compy with accessible entrance program - abe 202206291965. install power door operator; replace door hardware to compliance. | $5,000 |
| Nov 17, 2022 | Completed final sign-off Feb 2024 | 914 Valencia St | upgrade (e) commercial entry per ordinance 51-16 abe program; to compy with accessible entrance program - abe 202206291965. install power door operator; replace door hardware to compliance.Details
upgrade (e) commercial entry per ordinance 51-16 abe program; to compy with accessible entrance program - abe 202206291965. install power door operator; replace door hardware to compliance. | $5,000 |
| Nov 16, 2022 | Expired or cancelled cancelled Oct 2025 | 500 Ellis St | to comply accessible business entrance program per ordinance 51-16. re-slope interior landing. abe #201812173067Details
to comply accessible business entrance program per ordinance 51-16. re-slope interior landing. abe #201812173067 | $3,000 |
| Nov 16, 2022 | Expired or cancelled cancelled Oct 2025 | 512 Ellis St | to comply accessible business entrance program per ordinance 51-16. re-slope interior landing, install new power doors, replace door with 36" door & side lite. remove security gate. abe #201812173066Details
to comply accessible business entrance program per ordinance 51-16. re-slope interior landing, install new power doors, replace door with 36" door & side lite. remove security gate. abe #201812173066 | $6,000 |
| Oct 12, 2022 | Completed final sign-off Nov 2022 | 800 Powell St | reroofingDetails
reroofing | $60,000 |
| Apr 15, 2022 | Completed final sign-off Aug 2022 | 1599 Green St | apt 103. install one new clothes washer/dryer. note: no wall demoDetails
apt 103. install one new clothes washer/dryer. note: no wall demo | $4,000 |
| Apr 7, 2022 | Completed final sign-off Aug 2022 | 660 Clipper St | #209. washer and dryer installationDetails
#209. washer and dryer installation | $5,000 |
| Mar 25, 2022 | Never finaled issued Apr 2022, no final | 701 Taylor St | unit #210: rehabilitate (e) kitchen & bathroom. install washer / dryer.Details
unit #210: rehabilitate (e) kitchen & bathroom. install washer / dryer. | $40,000 |
| Mar 24, 2022 | Never finaled issued Apr 2022, no final | 816 Geary St | rehab existing kitchen, install washer and dryer...Details
rehab existing kitchen, install washer and dryer... | $20,000 |
| Mar 22, 2022 | Completed final sign-off Jul 2022 | 2038 Divisadero St | unit #201: install 1 (n) clothes washer / dryer. no wall demo.Details
unit #201: install 1 (n) clothes washer / dryer. no wall demo. | $2,200 |
| Mar 22, 2022 | Never finaled issued Apr 2022, no final | 825 Pine St | unit #8: install 1 (n) clothes washer / dryer. demo as showed, construct new partition/non structural.Details
unit #8: install 1 (n) clothes washer / dryer. demo as showed, construct new partition/non structural. | $2,200 |
| Mar 22, 2022 | Completed final sign-off Jul 2022 | 737 Pine St | unit #31: install 1 (n) clothes washer & dryer. no wall demo. ventlessDetails
unit #31: install 1 (n) clothes washer & dryer. no wall demo. ventless | $2,200 |
| Mar 14, 2022 | Never finaled issued Apr 2022, no final | 1599 Green St | 4th flr #302 - install new washer/elec dryer. no wall demo.Details
4th flr #302 - install new washer/elec dryer. no wall demo. | $4,500 |
| Feb 23, 2022 | Completed final sign-off Nov 2025 | 2600 Van Ness Av | legalize a dwelling unit on the first floor of an existing 32 unit, 6 story residential building, per section 207.3 (ord. 43-14). all work located within existing building envelope at first floor. egress for existing units to be maintained.Details
legalize a dwelling unit on the first floor of an existing 32 unit, 6 story residential building, per section 207.3 (ord. 43-14). all work located within existing building envelope at first floor. egress for existing units to be maintained. | $90,000 |
| Nov 22, 2021 | Completed final sign-off Apr 2022 | 2927 Sacramento St | unit #10: rehab(e) kitchen & (e) bathroom. install washer and dryer.Details
unit #10: rehab(e) kitchen & (e) bathroom. install washer and dryer. | $28,000 |
| Nov 9, 2021 | Completed final sign-off Apr 2022 | 3416 22nd St | tenant improvement: installation of new plumbing and electrical fixtures for hair salon and new washer and dryer.Details
tenant improvement: installation of new plumbing and electrical fixtures for hair salon and new washer and dryer. | $20,000 |
| Oct 19, 2021 | Completed final sign-off Nov 2021 | 2117 Bush St | remove and replace rotten wood on back deck in kind. less than 50%Details
remove and replace rotten wood on back deck in kind. less than 50% | $4,000 |
| Oct 7, 2021 | Completed final sign-off Dec 2023 | 1017 Divisadero St | new cannabis retail store, change of use. mep under separate permit.Details
new cannabis retail store, change of use. mep under separate permit. | $50,000 |
| Sep 29, 2021 | Completed final sign-off Sep 2021 | 1720 Golden Gate Av | apt 21: remove and replace bathroom fixtures same location, remove and replace laundry same location. bathroom and laundry remodel.Details
apt 21: remove and replace bathroom fixtures same location, remove and replace laundry same location. bathroom and laundry remodel. | $12,000 |
| Jul 20, 2021 | Never finaled issued Jul 2021, no final | 947 Bush St | apt 321: remoe and replace kitchen cabinets in-kind, same location. maher n/a.Details
apt 321: remoe and replace kitchen cabinets in-kind, same location. maher n/a. | $20,000 |
| Jun 22, 2021 | Never finaled issued Jun 2021, no final | 1332 South Van Ness Av | close up hole with drywall due to electrical repairs 100 sq.ft. approx. on one bedroom wall within unit. electrical work under separate electrical permit.Details
close up hole with drywall due to electrical repairs 100 sq.ft. approx. on one bedroom wall within unit. electrical work under separate electrical permit. | $5,000 |
| May 28, 2021 | Never finaled issued Jun 2021, no final | 994 Guerrero St | demolition of e restroom and construction of new ada compliant single occupancy restroom. install hookup up for washer and gas dryer. gas dryer install under sep permit.Details
demolition of e restroom and construction of new ada compliant single occupancy restroom. install hookup up for washer and gas dryer. gas dryer install under sep permit. | $12,000 |
| May 21, 2021 | Never finaled issued May 2021, no final | 690 Mission St | t.i. for window replacement in an existing storefront system. scope of work is limited to replacing existing fixed glazing within the storefront with aluminum clad sliding wood windows. door moved/widened. no structural work is involved.Details
t.i. for window replacement in an existing storefront system. scope of work is limited to replacing existing fixed glazing within the storefront with aluminum clad sliding wood windows. door moved/widened. no structural work is involved. | $30,000 |
| Apr 23, 2021 | Completed final sign-off Oct 2021 | 947 Bush St | no new wall and no (e) wall relocation. remove and replace bathroom and kitchen fixtures same locaton. new lightinhg shall comply with cec 150.0 (k) 3 (k) 5Details
no new wall and no (e) wall relocation. remove and replace bathroom and kitchen fixtures same locaton. new lightinhg shall comply with cec 150.0 (k) 3 (k) 5 | $25,000 |
| Apr 23, 2021 | Completed final sign-off Oct 2021 | 520 Buchanan St | remove and replace bathroom fixtures same location. remove and replace kitchen same location. kitchen and bathroom remodel in kind approx 400 sf.Details
remove and replace bathroom fixtures same location. remove and replace kitchen same location. kitchen and bathroom remodel in kind approx 400 sf. | $30,000 |
| Apr 22, 2021 | Completed final sign-off Sep 2021 | 1720 Golden Gate Av | remove and replace kitchen cabinets. same locationDetails
remove and replace kitchen cabinets. same location | $25,000 |
| Apr 22, 2021 | Never finaled issued Apr 2021, no final | 520 Buchanan St | remove and replace bathroom fixtures same location. remove and replace kitchen fixtures same location. kitchen and bath remodel in kind approx 400 sfDetails
remove and replace bathroom fixtures same location. remove and replace kitchen fixtures same location. kitchen and bath remodel in kind approx 400 sf | $36,000 |
| Apr 20, 2021 | Completed final sign-off Dec 2021 | 415 Buchanan St | #g: 1)convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extisting bathroom. 4)install washer and dryer.Details
#g: 1)convert existing kitchen to study. 2)relocate kitchen. 3)rehabilitate extisting bathroom. 4)install washer and dryer. | $40,000 |
| Apr 19, 2021 | Never finaled issued Jun 2021, no final | 415 Buchanan St | unit z 1)revision to app#202009224680. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryerDetails
unit z 1)revision to app#202009224680. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer | $32,000 |
| Apr 19, 2021 | Never finaled issued Aug 2021, no final | 415 Buchanan St | unit s 1)revision to app#202009224679. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryerDetails
unit s 1)revision to app#202009224679. 2)rehabilitate existing kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer | $32,000 |
| Apr 7, 2021 | Never finaled issued May 2022, no final | 1240 Hayes St | unit 12: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. revision to no-plan pa 202101082294.Details
unit 12: convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. revision to no-plan pa 202101082294. | $40,000 |
| Mar 12, 2021 | Completed final sign-off Oct 2021 | 520 Buchanan St | unit #17: convert existing kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.Details
unit #17: convert existing kitchen to study. relocate kitchen. rehabilitate existing bathroom. install washer & dryer. | $40,000 |
| Mar 10, 2021 | Completed final sign-off Dec 2021 | 947 Bush St | #320: kitchen & bathroom remodel in kind approx 400 sq ft. remove & replace kitchen and bathroom fixtures in same location. no layout change.Details
#320: kitchen & bathroom remodel in kind approx 400 sq ft. remove & replace kitchen and bathroom fixtures in same location. no layout change. | $30,000 |
| Mar 9, 2021 | Never finaled issued Mar 2021, no final | 635 Ellis St | unit #1: kitchen and bathroom remodel in kind. remove & replace kitchen & bathroom fixtures. approx 500 sqft.Details
unit #1: kitchen and bathroom remodel in kind. remove & replace kitchen & bathroom fixtures. approx 500 sqft. | $30,000 |
| Feb 24, 2021 | Never finaled issued Jun 2021, no final | 78 Buchanan St | unit #204: convert existing kitchen to study, relocate kitchen. rehabilitate (e) bathroom. install washer/dryer.Details
unit #204: convert existing kitchen to study, relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. | $40,000 |
| Feb 24, 2021 | Never finaled issued Jan 2022, no final | 1240 Hayes St | unit #5: convert existing kitchen to study, relocate kitchen. rehabilitate (e) bathroom. install washer/dryer.Details
unit #5: convert existing kitchen to study, relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. | $40,000 |
| Jan 29, 2021 | Never finaled issued Sep 2021, no final | 1500 Mission St | security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a **Details
security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a ** | $2,000 |
| Jan 29, 2021 | Never finaled issued Sep 2021, no final | 1500 Mission St | garage improvements to the vehicular entry and vehicle valet pick-up & drop-off area for the existing mixed-use project. ** maher: n/a **Details
garage improvements to the vehicular entry and vehicle valet pick-up & drop-off area for the existing mixed-use project. ** maher: n/a ** | $100,000 |
| Jan 27, 2021 | Never finaled issued Apr 2021, no final | 1458 Union St | unit 1458b - 2nd flr: revision to no plan pa 202011128681: convert (e) kitchen to study (no sleeping allowed). relocate kitchen. rehabilitate (e) bathroom. install washer and dryer.Details
unit 1458b - 2nd flr: revision to no plan pa 202011128681: convert (e) kitchen to study (no sleeping allowed). relocate kitchen. rehabilitate (e) bathroom. install washer and dryer. | $40,000 |
| Jan 12, 2021 | Completed final sign-off Mar 2021 | 947 Bush St | unit #9: remove and replace kitchen cabinet same place in kindDetails
unit #9: remove and replace kitchen cabinet same place in kind | $7,000 |
| Jan 8, 2021 | Never finaled issued Jan 2021, no final | 1240 Hayes St | # 5 - remove & replace bathroom fixture, same location; remove and replace kitchen fixture, same location; kitchen and bathroom remodel in kind approx 500 sf. no moving wallsDetails
# 5 - remove & replace bathroom fixture, same location; remove and replace kitchen fixture, same location; kitchen and bathroom remodel in kind approx 500 sf. no moving walls | $30,000 |
| Jan 8, 2021 | Never finaled issued Jan 2021, no final | 1240 Hayes St | # 12 - remove & replace bathroom fixture, same location; remove and replace kitchen fixture, same location; kitchen and bathroom remodel in kind approx 500 sf. no moving wallsDetails
# 12 - remove & replace bathroom fixture, same location; remove and replace kitchen fixture, same location; kitchen and bathroom remodel in kind approx 500 sf. no moving walls | $30,000 |
| Jan 8, 2021 | Never finaled issued Jan 2021, no final | 1240 Hayes St | # 10 - remove & replace bathroom fixture, same location; remove and replace kitchen fixture, same location; kitchen and bathroom remodel in kind approx 500 sf. no moving wallsDetails
# 10 - remove & replace bathroom fixture, same location; remove and replace kitchen fixture, same location; kitchen and bathroom remodel in kind approx 500 sf. no moving walls | $30,000 |
| Jan 7, 2021 | Never finaled issued Mar 2021, no final | 845 Pine St | #23 2nd flr: convert (e) kitchen to study (no sleeping allowed). relocate kitchen. rehabilitate (e) bathrooms. install washer and dryer. must comply with sffc 1103.7.6.1 fire alarm under separate permit.Details
#23 2nd flr: convert (e) kitchen to study (no sleeping allowed). relocate kitchen. rehabilitate (e) bathrooms. install washer and dryer. must comply with sffc 1103.7.6.1 fire alarm under separate permit. | $45,000 |
| Dec 30, 2020 | Never finaled issued Aug 2021, no final | 845 Pine St | unit 24: convert existing kitchen to study(no sleeping allowed), relocate kitchen, rehabilitate existing bathroom, install washer/dryer.Details
unit 24: convert existing kitchen to study(no sleeping allowed), relocate kitchen, rehabilitate existing bathroom, install washer/dryer. | $40,000 |
| Dec 16, 2020 | Never finaled issued Apr 2021, no final | 755 O'farrell St | unit #37 - 3rd flr - rehabilitate existing kitchen & bathroom. install washer & dryer.Details
unit #37 - 3rd flr - rehabilitate existing kitchen & bathroom. install washer & dryer. | $35,000 |
| Dec 11, 2020 | Never finaled issued Mar 2021, no final | 845 Pine St | unit a: revision to pa# 202008272731. convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathrooms. install washer/dryer.Details
unit a: revision to pa# 202008272731. convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathrooms. install washer/dryer. | $46,000 |
| Dec 10, 2020 | Never finaled issued Apr 2021, no final | 845 Pine St | unit #31: convert (e) kitchen to bedroom, relocate kitchen, rehablitte (e) bathrooms, install washer and dryerDetails
unit #31: convert (e) kitchen to bedroom, relocate kitchen, rehablitte (e) bathrooms, install washer and dryer | $42,000 |
| Dec 9, 2020 | Never finaled issued Jan 2021, no final | 78 Buchanan St | unit #104: 1)convert extg kitchen to bathroom. 2)relocate kitchen, 3)rehabilitate extg bathroom, 4)install washer and dryer.Details
unit #104: 1)convert extg kitchen to bathroom. 2)relocate kitchen, 3)rehabilitate extg bathroom, 4)install washer and dryer. | $40,000 |
| Dec 8, 2020 | Never finaled issued Mar 2021, no final | 845 Pine St | unit #4: convert existing kitchen to study. relocate kitchen. rehabilitate existing bathrooms. install washer/dryer.Details
unit #4: convert existing kitchen to study. relocate kitchen. rehabilitate existing bathrooms. install washer/dryer. | $48,000 |
| Dec 8, 2020 | Completed final sign-off Aug 2021 | 845 Pine St | unit 44, 4/f: (1) convert (e) kitchen to bedroom. (2) relocate kitchen. (3) rehabilitate (e) bathrooms. (4) install washer and dryers.Details
unit 44, 4/f: (1) convert (e) kitchen to bedroom. (2) relocate kitchen. (3) rehabilitate (e) bathrooms. (4) install washer and dryers. | $48,000 |
| Dec 3, 2020 | Completed final sign-off Aug 2021 | 845 Pine St | unit#33:kitchen and bathroom remodel in kind approx. 500 sq ft.Details
unit#33:kitchen and bathroom remodel in kind approx. 500 sq ft. | $30,000 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 1240 Hayes St | unit#2: kitchen and bathroom remodel in kind approx. 400 sq ft.Details
unit#2: kitchen and bathroom remodel in kind approx. 400 sq ft. | $30,000 |
| Nov 25, 2020 | Never finaled issued Jun 2021, no final | 100 Lake St | unit # 1a: 1. convert existing kitchen to bedroom 2. relocate kitchen 3. rehabilitate existing bathroom 4. install washer and dryerDetails
unit # 1a: 1. convert existing kitchen to bedroom 2. relocate kitchen 3. rehabilitate existing bathroom 4. install washer and dryer | $40,000 |
| Nov 19, 2020 | Never finaled issued Apr 2021, no final | 415 Buchanan St | unit# n: revision to no plan pa#202008272736: convert existing kitchen to study room. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer.Details
unit# n: revision to no plan pa#202008272736: convert existing kitchen to study room. relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. | $38,000 |
| Nov 19, 2020 | Never finaled issued Mar 2021, no final | 2927 Sacramento St | unit #5: revision to no plan pa# 202008262640: convert (e) kitchen to office. relocate kitchen and bathroom. install washer/dryer.Details
unit #5: revision to no plan pa# 202008262640: convert (e) kitchen to office. relocate kitchen and bathroom. install washer/dryer. | $40,000 |
| Nov 18, 2020 | Never finaled issued Nov 2020, no final | 845 Pine St | remove and replace bathroom fixture same location, remove and replace kitchen fixtures, same location, kitchen and bathroom remodel in kind approx 500 sqft.Details
remove and replace bathroom fixture same location, remove and replace kitchen fixtures, same location, kitchen and bathroom remodel in kind approx 500 sqft. | $30,000 |
| Nov 18, 2020 | Never finaled issued Nov 2020, no final | 355 Fulton St | remove and replace kitchen cabinets same location in kind approx 110 sqftDetails
remove and replace kitchen cabinets same location in kind approx 110 sqft | $5,000 |
| Nov 12, 2020 | Never finaled issued Nov 2020, no final | 1458 Union St | unit #1458b: remove and replace bathroom fixtures, same location. remove and replace kitchen fixtures, same location. kitchen and bathroom remodel in kind approx. 350 sq ftDetails
unit #1458b: remove and replace bathroom fixtures, same location. remove and replace kitchen fixtures, same location. kitchen and bathroom remodel in kind approx. 350 sq ft | $35,000 |
| Nov 12, 2020 | Never finaled issued Nov 2020, no final | 1460 Union St | unit #1460d: remove and replace bathroom fixtures, same location. remove and replace kitchen fixtures, same location. kitchen and bathroom remodel in kind approx. 350 sq ftDetails
unit #1460d: remove and replace bathroom fixtures, same location. remove and replace kitchen fixtures, same location. kitchen and bathroom remodel in kind approx. 350 sq ft | $30,000 |
| Nov 10, 2020 | Never finaled issued Nov 2020, no final | 488 Folsom St | install pocket door at den per plan.Details
install pocket door at den per plan. | $5,000 |
| Nov 9, 2020 | Completed final sign-off Apr 2021 | 1720 Golden Gate Av | repair and rebuild egress deck as needed in-kindDetails
repair and rebuild egress deck as needed in-kind | $30,000 |
| Sep 24, 2020 | Completed final sign-off Apr 2021 | 78 Buchanan St | unit #104: remove and replace bahroom fixtures, kitchen fixtures. remodel kitchen and bathroom in-kin approx. 500 sq ft.Details
unit #104: remove and replace bahroom fixtures, kitchen fixtures. remodel kitchen and bathroom in-kin approx. 500 sq ft. | $30,000 |
| Sep 22, 2020 | Never finaled issued Sep 2020, no final | 415 Buchanan St | apt s: r/r bathroom & kitchen remodel, new fixtures in same location.Details
apt s: r/r bathroom & kitchen remodel, new fixtures in same location. | $30,000 |
| Sep 22, 2020 | Completed final sign-off Dec 2020 | 415 Buchanan St | apt b1: repair floor: remove and replce in-kind. approx 800sf.Details
apt b1: repair floor: remove and replce in-kind. approx 800sf. | $12,000 |
| Sep 22, 2020 | Never finaled issued Sep 2020, no final | 78 Buchanan St | unit 106. kitchen & bathroom remodel in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixture same location.Details
unit 106. kitchen & bathroom remodel in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixture same location. | $30,000 |
| Sep 22, 2020 | Never finaled issued Sep 2020, no final | 1454 Union St | unit 1406c. kitchen & bathroom remodel in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixture same location.Details
unit 1406c. kitchen & bathroom remodel in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixture same location. | $30,000 |
| Sep 22, 2020 | Never finaled issued Sep 2020, no final | 415 Buchanan St | apt z: r/r bathroom & kitchen remodel, new fixtures in same location.Details
apt z: r/r bathroom & kitchen remodel, new fixtures in same location. | $30,000 |
| Aug 31, 2020 | Completed final sign-off Oct 2020 | 488 Folsom St | repair and patch ceilingDetails
repair and patch ceiling | $12,000 |
| Aug 31, 2020 | Completed final sign-off Dec 2020 | 57 Taylor St | unit 434 - remove and replace bathroom fixtures - same location; remove and replace kitchen fixtures - same location; kitchen & bathroom remodel in kind approx 500 sfDetails
unit 434 - remove and replace bathroom fixtures - same location; remove and replace kitchen fixtures - same location; kitchen & bathroom remodel in kind approx 500 sf | $30,000 |
| Aug 31, 2020 | Never finaled issued Aug 2020, no final | 488 Folsom St | install pocket door to den/office. in kind non structuralDetails
install pocket door to den/office. in kind non structural | $5,000 |
| Aug 27, 2020 | Never finaled issued Aug 2020, no final | 318 Turk St | unit 301. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations.Details
unit 301. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations. | $30,000 |
| Aug 27, 2020 | Completed final sign-off Apr 2021 | 845 Pine St | unit a. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations.Details
unit a. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations. | $30,000 |
| Aug 27, 2020 | Never finaled issued Aug 2020, no final | 415 Buchanan St | unit n. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations.Details
unit n. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bath fixtures in at same locations. | $30,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 845 Pine St | unit 44: remove/replace bathroom & kitchen fixtures same location, kitchen & bathroom remodel in-kind approximately 500 sq. ft.Details
unit 44: remove/replace bathroom & kitchen fixtures same location, kitchen & bathroom remodel in-kind approximately 500 sq. ft. | $30,000 |
| Aug 26, 2020 | Completed final sign-off Aug 2021 | 2927 Sacramento St | unit 5: remove/replace bathroom & kitchen fixtures same location, kitchen & bathroom remodel in-kind approximately 500 sq. ft.Details
unit 5: remove/replace bathroom & kitchen fixtures same location, kitchen & bathroom remodel in-kind approximately 500 sq. ft. | $30,000 |
| Aug 25, 2020 | Never finaled issued Aug 2020, no final | 845 Pine St | unit 4. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixtures at same locations.Details
unit 4. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixtures at same locations. | $30,000 |
| Aug 25, 2020 | Never finaled issued Aug 2020, no final | 845 Pine St | unit 3. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixtures at same locations.Details
unit 3. kitchen and bathroom remodel, in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixtures at same locations. | $30,000 |
| Aug 19, 2020 | Completed final sign-off Sep 2020 | 350 Judah St | demo ceiling and dry wall repair - retail space.Details
demo ceiling and dry wall repair - retail space. | $25,000 |
| Aug 19, 2020 | Completed final sign-off Oct 2020 | 488 Folsom St | demo ceiling and dry wall repair - retail space.Details
demo ceiling and dry wall repair - retail space. | $25,000 |
| Jul 28, 2020 | Never finaled issued Jul 2020, no final | 1720 Golden Gate Av | remove & replace bathroom fixtures same location. remove & replace kitchen fixtures same location. kitchen & bathroom remodel inkind. remove & replace (3) exterior windows back inkindDetails
remove & replace bathroom fixtures same location. remove & replace kitchen fixtures same location. kitchen & bathroom remodel inkind. remove & replace (3) exterior windows back inkind | $45,000 |
| Jul 28, 2020 | Completed final sign-off Aug 2020 | 240 St Josephs Av | reroofingDetails
reroofing | $35,000 |
| Jul 14, 2020 | Never finaled issued Jul 2020, no final | 5519 Mission St | unit#107: bathroom remodel in kind. remove & replace fixtures same location. approx 36 sq feet. no exterior workDetails
unit#107: bathroom remodel in kind. remove & replace fixtures same location. approx 36 sq feet. no exterior work | $20,000 |
| Jul 14, 2020 | Completed final sign-off Dec 2020 | 318 Turk St | unit#106: kitchen & bath remodel in kind. remove & replace bathroom fixtures same location. remove & replace kitchen fixtures same location approx 200 sq ft.no exterior work. **maher n/a**Details
unit#106: kitchen & bath remodel in kind. remove & replace bathroom fixtures same location. remove & replace kitchen fixtures same location approx 200 sq ft.no exterior work. **maher n/a** | $35,000 |
| Jul 14, 2020 | Never finaled issued Jul 2020, no final | 100 Broderick St | unit #206: kitchen & bath remodle in kind. remove & replace fixture & cabinets in kitchen. remove & replace fixture in bathroom same location. approx 200 sq feet. no exterior workDetails
unit #206: kitchen & bath remodle in kind. remove & replace fixture & cabinets in kitchen. remove & replace fixture in bathroom same location. approx 200 sq feet. no exterior work | $35,000 |