Block 0872, lot 009
78 Buchanan St
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 6
- Units
- 36
- Rooms
- 36 bathrooms
- Building
- 41,040 sq ft
- Lot
- 7,196 sq ft
- Zoning
- RM3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
46 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 25, 2024 | Completed final sign-off May 2026 | 78 Buchanan St | Halyard Inc | upgrade fire alarm system to current codes, nfpa 72 (2022), to comply with sffc section 1103.7.6.1 to provide new low frequency sounders in sleeping areas.Details
upgrade fire alarm system to current codes, nfpa 72 (2022), to comply with sffc section 1103.7.6.1 to provide new low frequency sounders in sleeping areas. | $96,429 |
| Jul 10, 2023 | Expired or cancelled cancelled Jun 2024 | 78 Buchanan St | Au Electric Corporation/Aec Alarms | upgrade existing fa system to compy with sffc 1103.7.6.1 by installing new wireless low frequency sounders & like-for-like replacements for existing smoke detectors, pull stations, horn/strobes in common areas.Details
upgrade existing fa system to compy with sffc 1103.7.6.1 by installing new wireless low frequency sounders & like-for-like replacements for existing smoke detectors, pull stations, horn/strobes in common areas. | $80,000 |
| Apr 7, 2022 | Completed final sign-off May 2023 | 78 Buchanan St | Axa Construction | #205 3rd flr: 1) convert extg dining to living. 2)convert extg living to bedroom 3)rehabilitate extg bathroom 4)install 2nd bathroom. 5)install washer and gas dryer.Details
#205 3rd flr: 1) convert extg dining to living. 2)convert extg living to bedroom 3)rehabilitate extg bathroom 4)install 2nd bathroom. 5)install washer and gas dryer. | $44,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2022 | 78 Buchanan St | Blucal | #504 6th flr: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom 4)install washer and elec dryer.Details
#504 6th flr: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom 4)install washer and elec dryer. | $42,000 |
| Feb 24, 2021 | Never finaled issued Jun 2021, no final | 78 Buchanan St | Aguilera Construction Company | unit #204: convert existing kitchen to study, relocate kitchen. rehabilitate (e) bathroom. install washer/dryer.Details
unit #204: convert existing kitchen to study, relocate kitchen. rehabilitate (e) bathroom. install washer/dryer. | $40,000 |
| Dec 31, 2020 | Never finaled issued Dec 2020, no final | 78 Buchanan St | T M A Construction Services Inc | exploratory demo: explore 1 area on g/f to determine footing depth. explore 3 celings areas to explore beam sizes. remove & replace approx 100sf.Details
exploratory demo: explore 1 area on g/f to determine footing depth. explore 3 celings areas to explore beam sizes. remove & replace approx 100sf. | $2,000 |
| Dec 9, 2020 | Never finaled issued Jan 2021, no final | 78 Buchanan St | Aguilera Construction Company | unit #104: 1)convert extg kitchen to bathroom. 2)relocate kitchen, 3)rehabilitate extg bathroom, 4)install washer and dryer.Details
unit #104: 1)convert extg kitchen to bathroom. 2)relocate kitchen, 3)rehabilitate extg bathroom, 4)install washer and dryer. | $40,000 |
| Sep 24, 2020 | Completed final sign-off Apr 2021 | 78 Buchanan St | Aguilera Construction Company | unit #104: remove and replace bahroom fixtures, kitchen fixtures. remodel kitchen and bathroom in-kin approx. 500 sq ft.Details
unit #104: remove and replace bahroom fixtures, kitchen fixtures. remodel kitchen and bathroom in-kin approx. 500 sq ft. | $30,000 |
| Sep 22, 2020 | Never finaled issued Sep 2020, no final | 78 Buchanan St | Aguilera Construction Company | unit 106. kitchen & bathroom remodel in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixture same location.Details
unit 106. kitchen & bathroom remodel in-kind, approx 500 sq ft. remove and replace kitchen and bathroom fixture same location. | $30,000 |
| Jun 12, 2020 | Never finaled issued Jun 2020, no final | 78 Buchanan St | Holland Brooks Builders Inc | unit #406: provide plumbing and electric for a stacked, ventless washer/dryer (located in existing closet). relocate & replace subpanel from closet.Details
unit #406: provide plumbing and electric for a stacked, ventless washer/dryer (located in existing closet). relocate & replace subpanel from closet. | $15,000 |
| Nov 12, 2019 | Never finaled issued Mar 2020, no final | 78 Buchanan St | Aguilera Construction Company | unit 603 - convert existing dining room to bedroom; convert existing kitchen to bathroom; relocate kitchen, rehabilitate existing bathroom and install washer & dryerDetails
unit 603 - convert existing dining room to bedroom; convert existing kitchen to bathroom; relocate kitchen, rehabilitate existing bathroom and install washer & dryer | $40,000 |
| Apr 30, 2019 | Never finaled issued Apr 2019, no final | 78 Buchanan St | street spaceDetails
street space | ||
| Apr 25, 2019 | Completed final sign-off Aug 2019 | 78 Buchanan St | unit #502 - convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install w/d.Details
unit #502 - convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install w/d. | $38,000 | |
| May 4, 2018 | Never finaled issued May 2018, no final | 78 Buchanan St | street spaceDetails
street space | ||
| Aug 24, 2017 | Completed final sign-off Feb 2018 | 78 Buchanan St | Palmera Construction Co | unit 202: rehabilitate existing kitchen, existing bath, install washer and dryer; to comply with nov 201777702 dated 5/15/2017Details
unit 202: rehabilitate existing kitchen, existing bath, install washer and dryer; to comply with nov 201777702 dated 5/15/2017 | $28,000 |
| Mar 1, 2017 | Never finaled issued Mar 2017, no final | 78 Buchanan St | street spaceDetails
street space | ||
| Feb 7, 2017 | Never finaled issued Mar 2017, no final | 78 Buchanan St | D F K Y Construction Inc | apt #601: rehab (e) bathrrom and relocate kitchen to create additonal bedroom. add w/d maher naDetails
apt #601: rehab (e) bathrrom and relocate kitchen to create additonal bedroom. add w/d maher na | $28,000 |
| Nov 3, 2016 | Expired or cancelled cancelled Jan 2026 | 78 Buchanan St | unit #605 - revision to 201607263348 revise to add a hallway closet maher naDetails
unit #605 - revision to 201607263348 revise to add a hallway closet maher na | ||
| Nov 2, 2016 | Completed final sign-off Aug 2017 | 78 Buchanan St | Kin Wo Construction Inc. | 4th floor unit #306 - relocate (e) kitchen into living room, remodel (e) bathroom. convert (e) kitchen to a bedroom. add washer/dryer. add bathroom maher naDetails
4th floor unit #306 - relocate (e) kitchen into living room, remodel (e) bathroom. convert (e) kitchen to a bedroom. add washer/dryer. add bathroom maher na | $45,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 78 Buchanan St | street spaceDetails
street space | ||
| Sep 22, 2016 | Never finaled issued Dec 2016, no final | 78 Buchanan St | A G C I Inc | 4/f #304- remodel existing kitchen, remodel existing bathroom, add a bedroom, add washer & dryer. n/a ordinance #155-13Details
4/f #304- remodel existing kitchen, remodel existing bathroom, add a bedroom, add washer & dryer. n/a ordinance #155-13 | $25,000 |
| Jul 26, 2016 | Never finaled issued Aug 2016, no final | 78 Buchanan St | Cook Construction | remodel #605 at 7/f- remodel existing bathroom, remodel existing kitchen, add bathroom, add washer & dryer. n/a ordinance #155-13Details
remodel #605 at 7/f- remodel existing bathroom, remodel existing kitchen, add bathroom, add washer & dryer. n/a ordinance #155-13 | $30,000 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 78 Buchanan St | Cook Construction | unit 103, 1st floor - remodel (e) bathroom, relocate (e) kitchen and convert kitchen into a bedroom. add washer and dryer. n/a maher ord. # 155-13Details
unit 103, 1st floor - remodel (e) bathroom, relocate (e) kitchen and convert kitchen into a bedroom. add washer and dryer. n/a maher ord. # 155-13 | $40,000 |
| Aug 14, 2015 | Never finaled issued Aug 2015, no final | 78 Buchanan St | B-Side Inc. | unit #404: kitchen and bathroom remodel. no structural. replacing appliances, countertop, cabinets, fixtures in kitchen and fixtures and cabinets in bathroom.Details
unit #404: kitchen and bathroom remodel. no structural. replacing appliances, countertop, cabinets, fixtures in kitchen and fixtures and cabinets in bathroom. | $15,000 |
| Feb 20, 2015 | Completed final sign-off Jun 2015 | 78 Buchanan St | add 10 evacuation plan & maps. maher - not req'dDetails
add 10 evacuation plan & maps. maher - not req'd | $1,500 | |
| Feb 18, 2014 | Completed final sign-off May 2014 | 78 Buchanan St | Malagic Construction | unit 603: replace kitchen counter top, tile kitchen floor, new bath tile & floor tile, no structural work, re-use (e) appliances & fixtures in (e) location.Details
unit 603: replace kitchen counter top, tile kitchen floor, new bath tile & floor tile, no structural work, re-use (e) appliances & fixtures in (e) location. | $3,500 |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 78 Buchanan St | Liberty Fire Systems Inc | add 1 fire spinkler in trash room. compliance with ord 15-133 not required. excavation less than 50 cu yd or no excavation.Details
add 1 fire spinkler in trash room. compliance with ord 15-133 not required. excavation less than 50 cu yd or no excavation. | $500 |
| Sep 13, 2013 | Completed final sign-off Mar 2014 | 78 Buchanan St | D S Management Inc Dba Metrocon Builders | unit #501 - add/remove interior non-bearing walls, relocate kitchen to (e) closet, remodel (e) bathroom, convert (e) kitchen to (n) bathroom, convert (e) dining room into (n) den, new lighting plan for modified spaces.Details
unit #501 - add/remove interior non-bearing walls, relocate kitchen to (e) closet, remodel (e) bathroom, convert (e) kitchen to (n) bathroom, convert (e) dining room into (n) den, new lighting plan for modified spaces. | $35,000 |
| Sep 13, 2013 | Completed final sign-off Apr 2014 | 78 Buchanan St | D S Management Inc Dba Metrocon Builders | unit #203: remove/add interior non-bearing walls, remodel (e) kitchen /bath. convert (e) dining to (n) bedroom, add (n) bathroom, add (n) washer/dryer, new lighting plan for modified spaces.Details
unit #203: remove/add interior non-bearing walls, remodel (e) kitchen /bath. convert (e) dining to (n) bedroom, add (n) bathroom, add (n) washer/dryer, new lighting plan for modified spaces. | $40,000 |
| Aug 13, 2013 | Completed final sign-off Jun 2014 | 78 Buchanan St | D S Management Inc Dba Metrocon Builders | #503- remove/add interior non-bearing walls, remodel (e) kitchen & bath, add (n) bathroom, convert (e) dining into (n) bedroom, add (n) washer/dryer.Details
#503- remove/add interior non-bearing walls, remodel (e) kitchen & bath, add (n) bathroom, convert (e) dining into (n) bedroom, add (n) washer/dryer. | $39,000 |
| Jul 15, 2013 | Completed final sign-off Mar 2014 | 78 Buchanan St | Pre Wire Electrical, D S Management Inc Dba Metrocon Builders | unit #506:remove /add interior non bearing walls. relocate extg kitchen to extg bedroom, add new washer/dryer. relocate extg bedroom to extg kichn. new lighting plan for modified spaces. remodel extg bathroom. add new bathroom.Details
unit #506:remove /add interior non bearing walls. relocate extg kitchen to extg bedroom, add new washer/dryer. relocate extg bedroom to extg kichn. new lighting plan for modified spaces. remodel extg bathroom. add new bathroom. | $56,700 |
| Apr 5, 2013 | Expired or cancelled cancelled Jan 2014 | 78 Buchanan St | unit #302-remodel kitchen, add new bathroom, remodel (e) bathroom. convert living room into bedroom. new lighting. add washer & dryerDetails
unit #302-remodel kitchen, add new bathroom, remodel (e) bathroom. convert living room into bedroom. new lighting. add washer & dryer | $45,000 | |
| Apr 2, 2013 | Expired or cancelled cancelled Jan 2026 | 78 Buchanan St | Schoepp Construction Inc | all work in unit #302 - new lignhting, add washer & dryer unit, remodel kitchen & bath, add new bathroom, convert living room into a new bedroom.Details
all work in unit #302 - new lignhting, add washer & dryer unit, remodel kitchen & bath, add new bathroom, convert living room into a new bedroom. | $30,000 |
| Feb 8, 2013 | Expired or cancelled expired Nov 2015 | 78 Buchanan St | Schoepp Construction Inc | unit 305. revision to 201301248729. add new bath, new washer dryer, new lighting, remodel kitchen, convert living room into bedroom, remove/add int. walls.Details
unit 305. revision to 201301248729. add new bath, new washer dryer, new lighting, remodel kitchen, convert living room into bedroom, remove/add int. walls. | $25,000 |
| Jan 24, 2013 | Expired or cancelled expired Nov 2015 | 78 Buchanan St | Schoepp Construction Inc | all work in unit305. remove/add interior walls. convert e dining into new bedroom. add new bath and washer dryer.Details
all work in unit305. remove/add interior walls. convert e dining into new bedroom. add new bath and washer dryer. | $12,000 |
| Dec 20, 2012 | Completed final sign-off Jan 2014 | 78 Buchanan St | Schoepp Construction Inc | unit #602. revision to pa# 201211063575. comply with add interior walls, convert (e) dining room to (n) bedroom, new lighting.Details
unit #602. revision to pa# 201211063575. comply with add interior walls, convert (e) dining room to (n) bedroom, new lighting. | $19,000 |
| Dec 20, 2012 | Completed final sign-off Jul 2014 | 78 Buchanan St | Schoepp Construction Inc | unit #303. revision to pa# 201211063575. comply with nov#201279721. move interior walls, convert (e) dining room to (n) bedroom, new lighting. including demo work.Details
unit #303. revision to pa# 201211063575. comply with nov#201279721. move interior walls, convert (e) dining room to (n) bedroom, new lighting. including demo work. | $19,000 |
| Dec 7, 2012 | Completed final sign-off Jan 2014 | 78 Buchanan St | Schoepp Construction Inc | revision to 201209109269 at 2nd fl.#201; relocate kitchen, add new bath, convert dining room into new den; new lighting; comply with nov #201279721Details
revision to 201209109269 at 2nd fl.#201; relocate kitchen, add new bath, convert dining room into new den; new lighting; comply with nov #201279721 | $8,000 |
| Nov 20, 2012 | Completed final sign-off Jan 2014 | 78 Buchanan St | Schoepp Construction Inc | revision to pa#201209109269. remodel 2nd floor bathroom, toilet, sink, vanity.Details
revision to pa#201209109269. remodel 2nd floor bathroom, toilet, sink, vanity. | |
| Nov 6, 2012 | Completed final sign-off Jan 2014 | 78 Buchanan St | Schoepp Construction Inc | unit 602: remodel apt. bathroom/kitchen, toilet, tub, vanity, cabinets, countertops, sink. no lighting changeDetails
unit 602: remodel apt. bathroom/kitchen, toilet, tub, vanity, cabinets, countertops, sink. no lighting change | $10,000 |
| Nov 6, 2012 | Completed final sign-off Jul 2014 | 78 Buchanan St | Schoepp Construction Inc | unit 303: remodel apt. bathroom/kitchen, toilet, tub, vanity, cabinets, countertops, sink. no lightingDetails
unit 303: remodel apt. bathroom/kitchen, toilet, tub, vanity, cabinets, countertops, sink. no lighting | $10,000 |
| Sep 10, 2012 | Completed final sign-off Jan 2014 | 78 Buchanan St | Schoepp Construction Inc | unit #201-remodel kitchen & bathroom-replace sink, vanity, toilet in bathroom, countertops, cabinets & sink in kitchen. no range & exhaustDetails
unit #201-remodel kitchen & bathroom-replace sink, vanity, toilet in bathroom, countertops, cabinets & sink in kitchen. no range & exhaust | $12,000 |
| Aug 8, 2007 | Completed final sign-off Oct 2007 | 78 Buchanan St | Mec Construction | nov 200703144: unit106, kitchen and bathr remodel. upgrade electrical to code. upgrade appliance, patch and paint walls and ceilings.unit 204: same scope of work 402:new vinyl window replacement in bathroom. 605: kitchen remodel,new tile and appliances,patch and paint walls and ceilingsDetails
nov 200703144: unit106, kitchen and bathr remodel. upgrade electrical to code. upgrade appliance, patch and paint walls and ceilings.unit 204: same scope of work 402:new vinyl window replacement in bathroom. 605: kitchen remodel,new tile and appliances,patch and paint walls and ceilings | $40,750 |
| Jul 27, 2007 | Expired or cancelled expired Jan 2009 | 78 Buchanan St | Mec Construction | nov# 200710117-404 kitchen and bathroom remodel. upgrade electrical to code, upgrade appliances and fixtures. patch and paint walls & ceilings, new tile and bathroom fixtures #302-kitchen remodel. upgrade electrical to code, new fixtures and appliances. new tile & patch, paint wallsDetails
nov# 200710117-404 kitchen and bathroom remodel. upgrade electrical to code, upgrade appliances and fixtures. patch and paint walls & ceilings, new tile and bathroom fixtures #302-kitchen remodel. upgrade electrical to code, new fixtures and appliances. new tile & patch, paint walls | $30,000 |
| Oct 5, 2006 | Completed final sign-off Feb 2007 | 78 Buchanan St | to comply with nov #200672184. work include providing laundry room ventilation, replaceing various wndw frames and glass or latches. repair fire escape ladder, replace smoke detector in #601. repair outlets in #103 and #202Details
to comply with nov #200672184. work include providing laundry room ventilation, replaceing various wndw frames and glass or latches. repair fire escape ladder, replace smoke detector in #601. repair outlets in #103 and #202 | $5,000 | |
| Sep 29, 2006 | Completed final sign-off Oct 2007 | 78 Buchanan St | in response to nov #200674030. this permit is to remodel kitchen & bath in units #101, 103, 104, 206, 303, 304, 306, 501, 602 also to install (n) shower valves in units #201,503 & 505/ also a (n) boiler serving the bldg. & a (n) bathroom window in unit #506Details
in response to nov #200674030. this permit is to remodel kitchen & bath in units #101, 103, 104, 206, 303, 304, 306, 501, 602 also to install (n) shower valves in units #201,503 & 505/ also a (n) boiler serving the bldg. & a (n) bathroom window in unit #506 | $107,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.