32 permits since 2000 (contractor on 32 permits, authorized agent-others on 4 permits): 25 completed, 6 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 1450 Golden Gate Av | Blucal | unit 303: bathroom remodel, remove tub surround, install new vanity, new faucet, tiles. kitchen remodel, new base sink, cabinets, counter tops, new faucet, and new linoleum in kind.Details
unit 303: bathroom remodel, remove tub surround, install new vanity, new faucet, tiles. kitchen remodel, new base sink, cabinets, counter tops, new faucet, and new linoleum in kind. | $7,000 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 1405 Franklin St | Blucal | unit 402: replace damaged wiring and install new outlets lights, switches, new light fixtures throughout home. new isullation in ceiling and walls. new cabinets in kitchen, new flooring, new baseboard trim. new drywall and paint inpartial bathroom remodel. provide fire rating around new lighting.Details
unit 402: replace damaged wiring and install new outlets lights, switches, new light fixtures throughout home. new isullation in ceiling and walls. new cabinets in kitchen, new flooring, new baseboard trim. new drywall and paint inpartial bathroom remodel. provide fire rating around new lighting. | $110,000 |
| Mar 5, 2026 | Completed final sign-off Mar 2026 | 1405 Franklin St | Blucal | unit 302: install r-19 insulation in ceiling (420 sq ft). r-13 insulation in walls (300 sq ft). install new drywall 5/8 (900 sq ft) and new flooring (600 sq ft); paint all in-kind. all work interior.Details
unit 302: install r-19 insulation in ceiling (420 sq ft). r-13 insulation in walls (300 sq ft). install new drywall 5/8 (900 sq ft) and new flooring (600 sq ft); paint all in-kind. all work interior. | $35,000 |
| Feb 26, 2026 | Completed final sign-off Mar 2026 | 1405 Franklin St | Blucal | #202: in kitchen install 12-19 insolation install 21 sq ft of drywall in hallway, patch the wall around the sub electrical panel from water damaged, interior work onlyDetails
#202: in kitchen install 12-19 insolation install 21 sq ft of drywall in hallway, patch the wall around the sub electrical panel from water damaged, interior work only | $6,500 |
| Feb 5, 2026 | Completed final sign-off Feb 2026 | 1560 Sacramento St | Blucal | in the 3rd hallway, remove 2'x7' repair & install new drywall. unit# 307 remove 30 sq.ft. of damaged wall in closet & install new drywall & baseboard, in room. remove 10 sq.ft. damage wall & install new drywall. will not touch the studs. repair sheet rock only. comply nov 202541717.Details
in the 3rd hallway, remove 2'x7' repair & install new drywall. unit# 307 remove 30 sq.ft. of damaged wall in closet & install new drywall & baseboard, in room. remove 10 sq.ft. damage wall & install new drywall. will not touch the studs. repair sheet rock only. comply nov 202541717. | $7,596 |
| Jun 12, 2025 | Completed final sign-off Jul 2025 | 555 Buena Vista West Av | Blucal | unit 105: comply with nov #202534316 and its entirety. bathroom- remove 6sqft of damaged wall finish. living room-remove 80sqft of damaged wall finish.Details
unit 105: comply with nov #202534316 and its entirety. bathroom- remove 6sqft of damaged wall finish. living room-remove 80sqft of damaged wall finish. | $5,000 |
| Jun 6, 2025 | Completed final sign-off Nov 2025 | 665 Pine St | Blucal | unit 203: demo of sheetrock ceiling and wall, approximately 45 square feet within the bathroom. this work is to comply with nov # 202536067. install approximately 45 square feet of sheetrock to areas removed in bathroom.Details
unit 203: demo of sheetrock ceiling and wall, approximately 45 square feet within the bathroom. this work is to comply with nov # 202536067. install approximately 45 square feet of sheetrock to areas removed in bathroom. | $3,000 |
| Apr 25, 2025 | In progress issued Apr 2025 | 781 Ofarrell St | Blucal | unit #303 - install new subfloor in kind, 4ft by 5ft, due to water damage - 1" plywood w/ 10d @ 4" oc edge and 8" oc field w/ 3x blkg. new tile floor. patch wall in kind, 3ft by 4ft, w/ 5/8" type x gypbd w/ 5d cooler nails @ 4" o.c. remove and reinstall same toilet. maintain all (e) fire rating.Details
unit #303 - install new subfloor in kind, 4ft by 5ft, due to water damage - 1" plywood w/ 10d @ 4" oc edge and 8" oc field w/ 3x blkg. new tile floor. patch wall in kind, 3ft by 4ft, w/ 5/8" type x gypbd w/ 5d cooler nails @ 4" o.c. remove and reinstall same toilet. maintain all (e) fire rating. | $2,500 |
| Mar 11, 2025 | Completed final sign-off Feb 2026 | 801 Hayes St | Blucal | ground floor retail tenant improvement, new restroom, new lighting, new drywall, no exterior changesDetails
ground floor retail tenant improvement, new restroom, new lighting, new drywall, no exterior changes | $75,000 |
| Mar 3, 2025 | In progress issued Mar 2025 | 1025 Post St | Blucal | unit #41 repair in kind broken bathtub. this including installing a new bathtub, repair some shower tile, connecting the drain line. unit #31 repair sheetrock in the ceiling which is the unit belowDetails
unit #41 repair in kind broken bathtub. this including installing a new bathtub, repair some shower tile, connecting the drain line. unit #31 repair sheetrock in the ceiling which is the unit below | $4,500 |
| Nov 13, 2024 | Completed final sign-off Apr 2025 | 320 Turk St | Blucal | to comply with nov 202430328: remove and replace lobby ceiling 96 sqft walls 106 sqft. 2nd floor hallway remove and replace ceiling 35 sqft walls 162 sqft. unit 102: demo 3rd floor hallway ceiling 12 sqft wall 63 sqft bathroom demo walls. units 102 and 202.Details
to comply with nov 202430328: remove and replace lobby ceiling 96 sqft walls 106 sqft. 2nd floor hallway remove and replace ceiling 35 sqft walls 162 sqft. unit 102: demo 3rd floor hallway ceiling 12 sqft wall 63 sqft bathroom demo walls. units 102 and 202. | $77,000 |
| Aug 14, 2024 | Completed final sign-off Sep 2025 | 563 Webster St | Blucal | units b,c,d,e,f- units b,d,f to include kitchen and bath remodel to include remove partition wall at living room and kitchen and add pony wall with mep trade work. repair roof and ceiling for units e and f. all work is due to fire damage. no exterior work.Details
units b,c,d,e,f- units b,d,f to include kitchen and bath remodel to include remove partition wall at living room and kitchen and add pony wall with mep trade work. repair roof and ceiling for units e and f. all work is due to fire damage. no exterior work. | $110,000 |
| May 2, 2024 | In progress issued May 2024 | 784 Geary St | Blucal | remove approx 80 sq ft of impacted drywall ceiling in commercial space to inspect framing & patch back (maintain fire rating (if any))Details
remove approx 80 sq ft of impacted drywall ceiling in commercial space to inspect framing & patch back (maintain fire rating (if any)) | $3,500 |
| May 2, 2024 | In progress issued May 2024 | 786 Geary St | Blucal | unit 204: remove approx 30 sq ft of plaster around the bathroom window to inspect framing & patch back (maintain fire rating (if any)). unit 204Details
unit 204: remove approx 30 sq ft of plaster around the bathroom window to inspect framing & patch back (maintain fire rating (if any)). unit 204 | $2,500 |
| May 2, 2024 | In progress issued May 2024 | 786 Geary St | Blucal | unit 203: remove impacted drywall: 1 ft around the window and 1 ft x 12 ft of impacted drywall ceiling to inspect framing & patch back (maintain fire rating (if any))Details
unit 203: remove impacted drywall: 1 ft around the window and 1 ft x 12 ft of impacted drywall ceiling to inspect framing & patch back (maintain fire rating (if any)) | $2,500 |
| Oct 30, 2023 | Completed final sign-off Dec 2023 | 833 Ashbury St | Blucal | remove (e) sheet rock in unit 8 bedroom wall & ceiling, total 32 sqft. install new sheetrock, patch and paint, remove 1 kitchen wall cabinet and sink cabinet in unit #10. remove kitchen wall shet rock total 32 sqft. install new sheet rock in kind in kitchen reinstall cabinetsDetails
remove (e) sheet rock in unit 8 bedroom wall & ceiling, total 32 sqft. install new sheetrock, patch and paint, remove 1 kitchen wall cabinet and sink cabinet in unit #10. remove kitchen wall shet rock total 32 sqft. install new sheet rock in kind in kitchen reinstall cabinets | $5,000 |
| Sep 27, 2023 | Completed final sign-off Sep 2024 | 805 Hayes St | Blucal | remove fire damaged finishes from 4 units, flooring, ceiling, walls and trim, base to partially comply with nov# 202313616. this permit is for remediation work only per sfbid site visit. additonal permit required to restore units to pre-fire damage condition.Details
remove fire damaged finishes from 4 units, flooring, ceiling, walls and trim, base to partially comply with nov# 202313616. this permit is for remediation work only per sfbid site visit. additonal permit required to restore units to pre-fire damage condition. | $135,000 |
| Sep 6, 2023 | Completed final sign-off Nov 2023 | 685 Mcallister St | Blucal | unit 106 renovation- required kitchen and bath to sf code. new cabinets, new appliances in kitchen, full bathroom renovation. new bathtub new sink. kitchen and bathroom in kind. approx. 65 sq ft. for kitchen and bath.Details
unit 106 renovation- required kitchen and bath to sf code. new cabinets, new appliances in kitchen, full bathroom renovation. new bathtub new sink. kitchen and bathroom in kind. approx. 65 sq ft. for kitchen and bath. | $49,000 |
| Jul 26, 2023 | Completed final sign-off Jun 2024 | 990 Geary St | Blucal | 4/f-5/f: tocomply with nov 202306594. repair to fire damaged units at units 405, 406, 407, 505, 506, 507, and corridors at 4th & 5th fl unitsDetails
4/f-5/f: tocomply with nov 202306594. repair to fire damaged units at units 405, 406, 407, 505, 506, 507, and corridors at 4th & 5th fl units | $150,000 |
| Jun 30, 2023 | Completed final sign-off Feb 2024 | 990 Geary St | Blucal | (unit# 408) removal of kitchen cabinets, bathroom sink, bathroom cabinet, bathroom wainscot tile 100 sq ft, sheetrock 400 sq ft in bathroom, kitchen, and entry hall. install new material in kind.Details
(unit# 408) removal of kitchen cabinets, bathroom sink, bathroom cabinet, bathroom wainscot tile 100 sq ft, sheetrock 400 sq ft in bathroom, kitchen, and entry hall. install new material in kind. | $14,000 |
| Jun 30, 2023 | Completed final sign-off Aug 2023 | 990 Geary St | Blucal | remove damaged ceiling and walls sheetrock. in five (5) fire damaged units and 4th and 5th floor corridor fire damaged areas.Details
remove damaged ceiling and walls sheetrock. in five (5) fire damaged units and 4th and 5th floor corridor fire damaged areas. | $20,000 |
| Jun 27, 2023 | Never finaled issued Jun 2023, no final | 990 Geary St | Blucal | unit 408: removal of 180 sq ft of sheet rock repair wall and ceiling bathroom/kitchen. total 180 sq. ft. of sheet rock and paint. patch back in kind.Details
unit 408: removal of 180 sq ft of sheet rock repair wall and ceiling bathroom/kitchen. total 180 sq. ft. of sheet rock and paint. patch back in kind. | $10,000 |
| Apr 6, 2023 | Completed final sign-off Oct 2023 | 2242 Polk St | Blucal | apt 413: install new sheetrock- install new cabinets. install tile in bathroom repair electrical wires if needed it. paint. flooring. like for like to restore to original condition due to fire damageDetails
apt 413: install new sheetrock- install new cabinets. install tile in bathroom repair electrical wires if needed it. paint. flooring. like for like to restore to original condition due to fire damage | $80,000 |
| Jul 18, 2022 | Completed final sign-off Sep 2022 | 1030 Polk St | Blucal | to comply with nov 202291945 & 202292043: remove 500 sqft of double layer 5/8 drywall at ceiling and 100 sqft of 5/8 drywall at south wall. install new doublle layer 5/8 drywall and insulation; tape, texture and paint. nov dated 6/12/2022Details
to comply with nov 202291945 & 202292043: remove 500 sqft of double layer 5/8 drywall at ceiling and 100 sqft of 5/8 drywall at south wall. install new doublle layer 5/8 drywall and insulation; tape, texture and paint. nov dated 6/12/2022 | $25,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2022 | 78 Buchanan St | Blucal | #504 6th flr: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom 4)install washer and elec dryer.Details
#504 6th flr: 1) convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom 4)install washer and elec dryer. | $42,000 |
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 3862 California St | Blucal | unit#4 kitchen & bath remodel. no structural work. no walls to be removed.Details
unit#4 kitchen & bath remodel. no structural work. no walls to be removed. | $46,000 |
| Apr 6, 2018 | Completed final sign-off May 2018 | 2323 Franklin St | Blucal | unit # 301 ,remodel master bath & guest room like for like, repalce (2) shower valves, replace (1) shower pan, replace angle stops repalce toilets, replace vanity sink, cabinets, master bath size 5x8 guest bath size 5x8Details
unit # 301 ,remodel master bath & guest room like for like, repalce (2) shower valves, replace (1) shower pan, replace angle stops repalce toilets, replace vanity sink, cabinets, master bath size 5x8 guest bath size 5x8 | $12,000 |
| Feb 23, 2018 | Completed final sign-off Jul 2018 | 348 Duncan St | Blucal | unit #1: interior remodel - relocate bedroom door. install washer/dryer in bathroomDetails
unit #1: interior remodel - relocate bedroom door. install washer/dryer in bathroom | $4,500 |
| Feb 14, 2018 | Completed final sign-off Jul 2018 | 1405 Franklin St | Blucal | unit #601: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #601: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $28,000 |
| Feb 14, 2018 | Completed final sign-off Jul 2018 | 1405 Franklin St | Blucal | unit #301: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer.Details
unit #301: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. | $28,000 |
| Jan 18, 2018 | Completed final sign-off Jul 2018 | 1405 Franklin St | Blucal | unit 202 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryerDetails
unit 202 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate existing bathroom, install washer & dryer | $34,000 |
| Jan 3, 2018 | Completed final sign-off Feb 2018 | 200 Arguello Bl | Blucal | kitchen/bath remodel. new cabinet/countertops, add dw, replace oven vent hood with mw vent combo. replace range with gas, tile surround in shower, flooring, relocate elec subpanel, led surf mount light to lv rm,bathDetails
kitchen/bath remodel. new cabinet/countertops, add dw, replace oven vent hood with mw vent combo. replace range with gas, tile surround in shower, flooring, relocate elec subpanel, led surf mount light to lv rm,bath | $40,000 |