Block 0304, lot 026
737 Post St
- City’s use
- Multi-Family Residential
- Built
- 1989
- Stories
- 17
- Building
- 66,645 sq ft
- Lot
- 5,156 sq ft
- Zoning
- RC4
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2026 | Completed final sign-off Nov 2026 | 737 Post St | Blucal | front tower: to comply with nov # 2026662920. installing drywall in ceiling 50 sq ft in front of the elevator on first floor. in-kind repair.Details
front tower: to comply with nov # 2026662920. installing drywall in ceiling 50 sq ft in front of the elevator on first floor. in-kind repair. | $7,000 |
| Apr 1, 2025 | Completed final sign-off Dec 2025 | 737 Post St | Sequoia Construction Services Inc | nov #202431179- repair 1300 sf of eifs system on the 16th fl of southwest facing wall using a swing stage. match existing system per manufacturer specifications.Details
nov #202431179- repair 1300 sf of eifs system on the 16th fl of southwest facing wall using a swing stage. match existing system per manufacturer specifications. | $96,000 |
| Jul 17, 2019 | Never finaled issued Jul 2019, no final | 737 Post St | G A Higgins, Inc | unit #224 & #414: new kitchen countertops, cabinets, new bath countertops, cabinets, new wlec panel. full kitchen and bath remodel in 2 units approx 63 sfDetails
unit #224 & #414: new kitchen countertops, cabinets, new bath countertops, cabinets, new wlec panel. full kitchen and bath remodel in 2 units approx 63 sf | $62,000 |
| Mar 24, 2017 | Completed final sign-off Oct 2017 | 737 Post St | G A Higgins, Inc | to comply with nov# 201768885 for work in units 335 & 515 kitchen remodeled w/o permits all (n) lites are to be ledDetails
to comply with nov# 201768885 for work in units 335 & 515 kitchen remodeled w/o permits all (n) lites are to be led | $1,600 |
| Jan 12, 2016 | Completed final sign-off Jun 2016 | 737 Post St | Red Hawk Fire & Security Ca Llc | basement - add head to fan room - 1 pendant sprinkler, add head to under duct in garage - 1 upright sprinkler per fire marshall, fran sperisen.Details
basement - add head to fan room - 1 pendant sprinkler, add head to under duct in garage - 1 upright sprinkler per fire marshall, fran sperisen. | $4,000 |
| Oct 15, 2012 | Completed final sign-off May 2013 | 737 Post St | Sequoia Construction Services Inc | remove existing waterproof membrane on roof deck, install protector wrap anti-fracture waterproofing membrane, no structural changes, less than 2/12, replace in kind.Details
remove existing waterproof membrane on roof deck, install protector wrap anti-fracture waterproofing membrane, no structural changes, less than 2/12, replace in kind. | $24,318 |
| Mar 11, 2010 | Completed final sign-off Apr 2010 | 737 Post St | On-Site Maintenance | post st tower-unit #214 & 1513-front tower-upgrade kitchen cabinets & counter top. no structural, no electrical, no lighting & no moving or adding wallsDetails
post st tower-unit #214 & 1513-front tower-upgrade kitchen cabinets & counter top. no structural, no electrical, no lighting & no moving or adding walls | $16,800 |
| Mar 11, 2010 | Completed final sign-off Apr 2010 | 737 Post St | On-Site Maintenance | central tower-unit #1726, 1426 & 721-upgrade kitchen cabinets & counter top. no structural, no electrical, no lighting & no moving or adding wallsDetails
central tower-unit #1726, 1426 & 721-upgrade kitchen cabinets & counter top. no structural, no electrical, no lighting & no moving or adding walls | $26,600 |
| Oct 15, 2009 | Completed final sign-off Dec 2009 | 737 Post St | On-Site Maintenance | central tower # 1526 - upgrade kitchen cabinets & counter, no structural & no new lighting.Details
central tower # 1526 - upgrade kitchen cabinets & counter, no structural & no new lighting. | $6,300 |
| May 20, 2003 | Never finaled issued May 2003, no final | 737 Post St | Aquamatic Fire Protection | add & or relocate to accommadate tenant improvement for fire spinklers at 1st floorDetails
add & or relocate to accommadate tenant improvement for fire spinklers at 1st floor | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- On-Site Maintenance (3), G A Higgins, Inc (2), Sequoia Construction Services Inc (2), Aquamatic Fire Protection, Blucal, Red Hawk Fire & Security Ca Llc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.