Block 1269, lot 008
833 Ashbury St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 10,680 sq ft
- Lot
- 6,375 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 30, 2023 | Completed final sign-off Dec 2023 | 833 Ashbury St | Blucal | remove (e) sheet rock in unit 8 bedroom wall & ceiling, total 32 sqft. install new sheetrock, patch and paint, remove 1 kitchen wall cabinet and sink cabinet in unit #10. remove kitchen wall shet rock total 32 sqft. install new sheet rock in kind in kitchen reinstall cabinetsDetails
remove (e) sheet rock in unit 8 bedroom wall & ceiling, total 32 sqft. install new sheetrock, patch and paint, remove 1 kitchen wall cabinet and sink cabinet in unit #10. remove kitchen wall shet rock total 32 sqft. install new sheet rock in kind in kitchen reinstall cabinets | $5,000 |
| Dec 8, 2022 | Completed final sign-off Oct 2023 | 833 Ashbury St | California Multihousing Services Inc. | unit 1, 1st fl - interior remodel of bedroom kitchen and bathDetails
unit 1, 1st fl - interior remodel of bedroom kitchen and bath | $32,000 |
| Jul 13, 2021 | Completed final sign-off Feb 2022 | 833 Ashbury St | West Peak Construction | apt # 6 - remodel bedroom kitchen & bathroom.Details
apt # 6 - remodel bedroom kitchen & bathroom. | $62,000 |
| Jun 18, 2018 | Completed final sign-off Jul 2018 | 833 Ashbury St | Sequoia Construction Services Inc | reroofingDetails
reroofing | $49,875 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 833 Ashbury St | F.C. Kairuz Construction | renew for final 201502239032, 201509288215, 201509288213Details
renew for final 201502239032, 201509288215, 201509288213 | |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 833 Ashbury St | F.C. Kairuz Construction | renew for final 201408073272, 201408073273, 201608245857Details
renew for final 201408073272, 201408073273, 201608245857 | |
| Sep 14, 2017 | Never finaled filed Sep 2017, never issued | 833 Ashbury St | remove 7 front wood windows at 3rd floor (unit #5) and replace with aluminum wood/clad. change from double-hung to casement operation (will maintain existing profile/look). no other work proposed.Details
remove 7 front wood windows at 3rd floor (unit #5) and replace with aluminum wood/clad. change from double-hung to casement operation (will maintain existing profile/look). no other work proposed. | $16,000 | |
| Jul 21, 2017 | Never finaled issued Jul 2017, no final | 833 Ashbury St | street spaceDetails
street space | ||
| Oct 21, 2016 | Never finaled issued Oct 2016, no final | 833 Ashbury St | additional street spaceDetails
additional street space | ||
| Sep 1, 2016 | Completed final sign-off Feb 2017 | 833 Ashbury St | Theodore Design & Constr | soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4 and other rational design.Details
soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4 and other rational design. | $35,000 |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 833 Ashbury St | Theodore Design & Constr | make some excavations around 4 footings for soil landing in preparation for soft-story. engineering, check (e) shearwalals for plywood (non-destructuve). discovery only.Details
make some excavations around 4 footings for soil landing in preparation for soft-story. engineering, check (e) shearwalals for plywood (non-destructuve). discovery only. | $1,000 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 833 Ashbury St | street spaceDetails
street space | ||
| Apr 22, 2016 | Never finaled issued Apr 2016, no final | 833 Ashbury St | street space permitDetails
street space permit | ||
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 833 Ashbury St | Bandini Builders | interior remodel unit 7 at 2nd fl.relocate kitchen and dining rm, remodel bath,Details
interior remodel unit 7 at 2nd fl.relocate kitchen and dining rm, remodel bath, | $25,000 |
| Feb 18, 2016 | Never finaled issued Feb 2016, no final | 833 Ashbury St | street spaceDetails
street space | ||
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 833 Ashbury St | street spaceDetails
street space | ||
| Oct 2, 2015 | Never finaled issued Oct 2015, no final | 833 Ashbury St | street spaceDetails
street space | ||
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 833 Ashbury St | Bandini Builders | unit 8: remodel kitchen and bathroomDetails
unit 8: remodel kitchen and bathroom | $32,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 833 Ashbury St | Bandini Builders | unit 2: remodel kitchen and bathroomDetails
unit 2: remodel kitchen and bathroom | $32,000 |
| Feb 23, 2015 | Never finaled issued Mar 2015, no final | 833 Ashbury St | Bandini Builders | #9 & #12- interior remodel, relocate kitchen & remodel restroom.Details
#9 & #12- interior remodel, relocate kitchen & remodel restroom. | $28,000 |
| Jan 26, 2015 | Expired or cancelled cancelled Jan 2026 | 833 Ashbury St | interior remodel to unit #5. attic development, add study room, full bathroom.Details
interior remodel to unit #5. attic development, add study room, full bathroom. | $27,000 | |
| Sep 18, 2014 | Never finaled issued Sep 2014, no final | 833 Ashbury St | street space permitDetails
street space permit | ||
| Aug 7, 2014 | Never finaled issued Aug 2014, no final | 833 Ashbury St | unit 5: remodel kitchen, bath, infill door openingsDetails
unit 5: remodel kitchen, bath, infill door openings | $28,000 | |
| Aug 7, 2014 | Never finaled issued Aug 2014, no final | 833 Ashbury St | unit 4: remodel kitchen, bath, infill door openingsDetails
unit 4: remodel kitchen, bath, infill door openings | $28,000 | |
| Dec 29, 2009 | Expired or cancelled expired Jul 2011 | 833 Ashbury St | Martinez Construction A Partnership | renew app #200811035749. work not started.Details
renew app #200811035749. work not started. | |
| Mar 2, 2009 | Expired or cancelled expired Jul 2011 | 833 Ashbury St | change in p.a.#2008/1103/5749 to measurement of location of property line in relation to rear property. wall location to remain the same as exsisting wall location. (remove dimension on neigbor's property side)Details
change in p.a.#2008/1103/5749 to measurement of location of property line in relation to rear property. wall location to remain the same as exsisting wall location. (remove dimension on neigbor's property side) | ||
| Nov 3, 2008 | Expired or cancelled expired Apr 2010 | 833 Ashbury St | replace/rebuild rear retaining wall along rear property line as per plan.Details
replace/rebuild rear retaining wall along rear property line as per plan. | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bandini Builders (4), F.C. Kairuz Construction (2), Theodore Design & Constr (2), Blucal, California Multihousing Services Inc., Martinez Construction A Partnership, Sequoia Construction Services Inc, West Peak Construction
- Engineers
- James Li
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.