Block 0693, lot 015
1036 Polk St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 5
- Units
- 42
- Rooms
- 43 bathrooms
- Building
- 37,687 sq ft
- Lot
- 8,040 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
37 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2022 | Completed final sign-off May 2023 | 1036 Polk St | Axel8 Construction | 503 rehab e bedroom, rehab e bath, install washer and dryer. maher not reqDetails
503 rehab e bedroom, rehab e bath, install washer and dryer. maher not req | $18,000 |
| Jul 18, 2022 | Completed final sign-off Sep 2022 | 1030 Polk St | Blucal | to comply with nov 202291945 & 202292043: remove 500 sqft of double layer 5/8 drywall at ceiling and 100 sqft of 5/8 drywall at south wall. install new doublle layer 5/8 drywall and insulation; tape, texture and paint. nov dated 6/12/2022Details
to comply with nov 202291945 & 202292043: remove 500 sqft of double layer 5/8 drywall at ceiling and 100 sqft of 5/8 drywall at south wall. install new doublle layer 5/8 drywall and insulation; tape, texture and paint. nov dated 6/12/2022 | $25,000 |
| Feb 14, 2022 | Completed final sign-off Jul 2022 | 1036 Polk St | Quintanilla Builders Inc | apt 208. convert (e) living room to bedroom. rehab (e) kitchen, rehab (e) bathroom, install washer/dryer.Details
apt 208. convert (e) living room to bedroom. rehab (e) kitchen, rehab (e) bathroom, install washer/dryer. | $28,000 |
| Oct 31, 2019 | Completed final sign-off Mar 2020 | 1030 Polk St | International Fire Equip | install ul300 fire system. ref app#201907166040Details
install ul300 fire system. ref app#201907166040 | $6,500 |
| Oct 29, 2019 | Completed final sign-off Sep 2020 | 1036 Polk St | Au Electric Corporation/Aec Alarms | upgrade extg fire alarm to comply with sffc 1103.7.6.1 and nfpa 72Details
upgrade extg fire alarm to comply with sffc 1103.7.6.1 and nfpa 72 | $40,000 |
| Oct 22, 2019 | Completed final sign-off Oct 2022 | 1030 Polk St | Pacific Rim Design + Build | revision to pa 2019-0415-8034 add basement storage rooms and lighting for restaurant, no exterior changes. basement is unconditioned storage spaces. exit signs/emer lighting under sep permit.Details
revision to pa 2019-0415-8034 add basement storage rooms and lighting for restaurant, no exterior changes. basement is unconditioned storage spaces. exit signs/emer lighting under sep permit. | $5,000 |
| Jul 16, 2019 | Completed final sign-off Dec 2020 | 1038 Polk St | Huff Construction Company Inc | bar/restaurant build out including boh kitchen equipment, foh bar equipment, walk in refrideration, new lighting and egress signageDetails
bar/restaurant build out including boh kitchen equipment, foh bar equipment, walk in refrideration, new lighting and egress signage | $75,000 |
| May 24, 2019 | Never finaled issued Jul 2019, no final | 1030 Polk St | administrative permit to change from limitted use to full restaurant to add on-site alcohol. ref dph #9581. ref app#201904158034. n/a for maherDetails
administrative permit to change from limitted use to full restaurant to add on-site alcohol. ref dph #9581. ref app#201904158034. n/a for maher | ||
| Apr 15, 2019 | Completed final sign-off Oct 2022 | 1030 Polk St | Pacific Rim Design + Build | change of use: tenant improvement - limited restaurant - new kitchen, new restrooms, new lighting, new customer services counter, new dining area, new side exit door. .Details
change of use: tenant improvement - limited restaurant - new kitchen, new restrooms, new lighting, new customer services counter, new dining area, new side exit door. . | $225,000 |
| Nov 6, 2018 | Completed final sign-off May 2019 | 1036 Polk St | Euro Plumbing Inc, General Contractor | unit 507: convert existing kitchen to bedroom, relocate kitchen, rehabilitate e bathroom, install washer and dryerDetails
unit 507: convert existing kitchen to bedroom, relocate kitchen, rehabilitate e bathroom, install washer and dryer | $37,000 |
| Oct 9, 2018 | Completed final sign-off Mar 2019 | 1036 Polk St | Euro Plumbing Inc, General Contractor | rehabilitate (e) kitchen, bathroom and install w/d. all work in unit 404Details
rehabilitate (e) kitchen, bathroom and install w/d. all work in unit 404 | $28,000 |
| Jun 29, 2018 | Never finaled issued Sep 2018, no final | 1040 Polk St | Bob's Sign | erect electric projecting sign kuma sushi and sakeDetails
erect electric projecting sign kuma sushi and sake | $3,000 |
| Jun 29, 2018 | Never finaled issued Sep 2018, no final | 1040 Polk St | Bob's Sign | erect electric wall sign kuma sushi and sakeDetails
erect electric wall sign kuma sushi and sake | $3,000 |
| May 30, 2018 | Completed final sign-off Dec 2020 | 1038 Polk St | warm shell interior improvement to vacant tenant space mechanical, electrical, plumbing under seperate permitDetails
warm shell interior improvement to vacant tenant space mechanical, electrical, plumbing under seperate permit | $23,175 | |
| Apr 27, 2018 | Completed final sign-off Jan 2020 | 1030 Polk St | ada bathroom upgrades; demo non-structural interior partitions to merge 3 street level spaces into 1 for a ti under separate permit. construct 1-hr rated partition to divide another tenant space.Details
ada bathroom upgrades; demo non-structural interior partitions to merge 3 street level spaces into 1 for a ti under separate permit. construct 1-hr rated partition to divide another tenant space. | $80,000 | |
| Nov 14, 2016 | Completed final sign-off Jun 2018 | 1040 Polk St | Sweitzer Fixtures Llc | ti including, interior partition walls, electrical, mechanical & lumbing to be submitted under separate permit. lighting location for ref only. no exterior work.Details
ti including, interior partition walls, electrical, mechanical & lumbing to be submitted under separate permit. lighting location for ref only. no exterior work. | $90,000 |
| Oct 25, 2016 | Never finaled issued Oct 2016, no final | 1030 Polk St | street spaceDetails
street space | ||
| Aug 19, 2016 | Never finaled issued Aug 2016, no final | 1030 Polk St | street spaceDetails
street space | ||
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 1036 Polk St | Boss Construction Inc. | unit #302 & #302a - revision to ref pa 2015 0213 8346: revise kitchen layout - note: this applicaion will increase # of unit from 37 to 38 - maher naDetails
unit #302 & #302a - revision to ref pa 2015 0213 8346: revise kitchen layout - note: this applicaion will increase # of unit from 37 to 38 - maher na | |
| Jun 28, 2016 | Completed final sign-off Mar 2017 | 1036 Polk St | Boss Construction Inc. | unit #408 & #408a - revision to ref pa 201512225755: revise kitchen layout - note: this application will increase # 0f units from (e) 36 to 37 - maher naDetails
unit #408 & #408a - revision to ref pa 201512225755: revise kitchen layout - note: this application will increase # 0f units from (e) 36 to 37 - maher na | |
| Feb 22, 2016 | Never finaled issued Jun 2016, no final | 1030 Polk St | remodel of (e) shell retail units @ street level. ada bathroom remodel & replacement of (e) non-historic storefront system. new carpet, paint & lighting in residential corridors. new residential security gate. demo non structural interior partitions. maher naDetails
remodel of (e) shell retail units @ street level. ada bathroom remodel & replacement of (e) non-historic storefront system. new carpet, paint & lighting in residential corridors. new residential security gate. demo non structural interior partitions. maher na | $175,000 | |
| Feb 19, 2016 | Never finaled issued Mar 2016, no final | 1030 Polk St | Palmera Construction Co | unit #305 remodel at 3rd floor. remodel extg bathroom . relocate and remodel extg kitchen. add washer and dryer. n/a for maherDetails
unit #305 remodel at 3rd floor. remodel extg bathroom . relocate and remodel extg kitchen. add washer and dryer. n/a for maher | $25,000 |
| Dec 22, 2015 | Completed final sign-off Mar 2017 | 1036 Polk St | Boss Construction Inc. | apt 408 & 408a: 2interior alteration, convert 2 bedroom apartment into a studio and 1 bedroom apartment. 408a: add a kitchen, bath. 408: remodel (e) kitchen and bath. 408/408a add laundry box to each unit.Details
apt 408 & 408a: 2interior alteration, convert 2 bedroom apartment into a studio and 1 bedroom apartment. 408a: add a kitchen, bath. 408: remodel (e) kitchen and bath. 408/408a add laundry box to each unit. | $40,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2016 | 1036 Polk St | Palmera Construction Co | unit 405: remodel bathroom and kitchen. add washer and dryer. remove wall between kitchen and living room. maher n/a.Details
unit 405: remodel bathroom and kitchen. add washer and dryer. remove wall between kitchen and living room. maher n/a. | $25,000 |
| Jul 21, 2015 | Never finaled issued Jul 2015, no final | 1036 Polk St | B-Side Inc. | unit # 401: kitchen cabinet replacement. no electrical or plumbing. no structural n/a maher ord. # 155-13Details
unit # 401: kitchen cabinet replacement. no electrical or plumbing. no structural n/a maher ord. # 155-13 | $2,000 |
| Feb 13, 2015 | Completed final sign-off Mar 2017 | 1036 Polk St | Boss Construction Inc. | apt 302/302a: convert 2 bedroom apartment into a studio & one bedroom apartment; 302a: add a kitchen, bath and w/d; 302: remodel (e) kitchen and bath add new laundry w/d; maher n/aDetails
apt 302/302a: convert 2 bedroom apartment into a studio & one bedroom apartment; 302a: add a kitchen, bath and w/d; 302: remodel (e) kitchen and bath add new laundry w/d; maher n/a | $30,000 |
| Jan 17, 2014 | Completed final sign-off Jun 2014 | 1042 Polk St | L & Q Construction Inc. | revision to appl #2014.0117.6590 - relocation of refrigerators & counter, reconfiguration. compliance with ordinance #155-13 not required. excavation <50 cu. yd.Details
revision to appl #2014.0117.6590 - relocation of refrigerators & counter, reconfiguration. compliance with ordinance #155-13 not required. excavation <50 cu. yd. | |
| Oct 25, 2013 | Completed final sign-off Jun 2014 | 1042 Polk St | L & Q Construction Inc. | new grocery market in existing commercial spaceDetails
new grocery market in existing commercial space | $70,000 |
| Sep 19, 2011 | Never finaled issued Sep 2011, no final | 1030 Polk St | street space & mta parking meterDetails
street space & mta parking meter | ||
| Sep 3, 2010 | Completed final sign-off Sep 2010 | 1030 Polk St | revision to appl.#201007156736. provide disabled access automatic door opener in lieu of level landing @ door (ab-012).Details
revision to appl.#201007156736. provide disabled access automatic door opener in lieu of level landing @ door (ab-012). | $3,800 | |
| Jul 15, 2010 | Completed final sign-off Sep 2010 | 1030 Polk St | replace partitions to existing retail storeDetails
replace partitions to existing retail store | $25,000 | |
| Mar 6, 2009 | Expired or cancelled revoked Apr 2009 | 1040 Polk St | Sign & Sign Again | as per nov#complaint#10008 remove existing money mart sign located at front of bldg. at 2nd story.Details
as per nov#complaint#10008 remove existing money mart sign located at front of bldg. at 2nd story. | $500 |
| Mar 14, 2008 | Expired or cancelled cancelled Jan 2026 | 1030 Polk St | Don Meyers | erect non-electric, non illuminated single faced wall sign (7'x10').Details
erect non-electric, non illuminated single faced wall sign (7'x10'). | $2,000 |
| Feb 5, 2002 | Completed final sign-off Aug 2014 | 1030 Polk St | Hon's Construction Inc. | seissmic retrofit - bolt plus w/ irregularity corrected procedureDetails
seissmic retrofit - bolt plus w/ irregularity corrected procedure | |
| Jan 10, 2002 | Completed final sign-off Aug 2014 | 1030 Polk St | Hon's Construction Inc. | seismic retrofit-bolt-plus with irregularity corrected procedure design of 2000/0224/2727.Details
seismic retrofit-bolt-plus with irregularity corrected procedure design of 2000/0224/2727. | |
| Jun 22, 2001 | Never finaled issued Jun 2001, no final | 1030 Polk St | street space permitDetails
street space permit | ||
| Feb 24, 2000 | Completed final sign-off Aug 2014 | 1030 Polk St | seismic retrofit-bolt plus w/irregularity corrected procedure-install steel frames, foundations, waDetails
seismic retrofit-bolt plus w/irregularity corrected procedure-install steel frames, foundations, wa | $565,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Boss Construction Inc. (4), Bob's Sign (2), Euro Plumbing Inc, General Contractor (2), Hon's Construction Inc. (2), L & Q Construction Inc. (2), Pacific Rim Design + Build (2), Palmera Construction Co (2), Au Electric Corporation/Aec Alarms, Axel8 Construction, B-Side Inc., Blucal, Don Meyers, Huff Construction Company Inc, International Fire Equip, Quintanilla Builders Inc, Sign & Sign Again, Sweitzer Fixtures Llc
- Architects
- John T. Hood (4), Christopher Sullivan (3)
- Engineers
- Joe Kon, Joe Win Kon, Meng Hsiu Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.