A G C I Inc
- Based in
- Greenbrae
- On San Francisco permits
- Nov 2014 to Feb 2021
- Last 24 months
- 0 permits filed
26 permits since 2000: 23 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2021 | Completed final sign-off Apr 2024 | 500 46th Av | remodel (10x12) 1 kitchen, alteration to wall between living room. remove non-load bearing wall between kitchen and dining room.Details
remodel (10x12) 1 kitchen, alteration to wall between living room. remove non-load bearing wall between kitchen and dining room. | $14,500 |
| Sep 12, 2019 | Completed final sign-off Jan 2020 | 830 Victoria St | replacce (5) windows. (1) front window to be all wood, (4) side windows to be fiberglass elevate. repair stucco throughout in kind. replace t1-11 siding with shingle siding @ one-story extension over garage.Details
replacce (5) windows. (1) front window to be all wood, (4) side windows to be fiberglass elevate. repair stucco throughout in kind. replace t1-11 siding with shingle siding @ one-story extension over garage. | $40,000 |
| May 2, 2019 | Completed final sign-off Nov 2019 | 2898 Jackson St | rehabilitate (e) kitchen, rehabilitate(e) bathrooms, install washer & dryer (unit 500)Details
rehabilitate (e) kitchen, rehabilitate(e) bathrooms, install washer & dryer (unit 500) | $42,000 |
| Apr 12, 2019 | Completed final sign-off Nov 2019 | 2898 Jackson St | unit 201 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathrooms, install w/d.additional 1 bedroomDetails
unit 201 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathrooms, install w/d.additional 1 bedroom | $46,000 |
| Mar 20, 2019 | Completed final sign-off Aug 2019 | 3820 Scott St | #304 - rehabilitate e bathroom, add washer dryer, rehabilitate e kitchenDetails
#304 - rehabilitate e bathroom, add washer dryer, rehabilitate e kitchen | $22,000 |
| Mar 1, 2019 | Completed final sign-off Jan 2020 | 830 Victoria St | reconfigure (e) 2nd fl bathroom, construct (n) bathroom & laundry room within bedroom #4 @ 2nd floorDetails
reconfigure (e) 2nd fl bathroom, construct (n) bathroom & laundry room within bedroom #4 @ 2nd floor | $30,000 |
| Feb 4, 2019 | Completed final sign-off Jan 2020 | 830 Victoria St | remove 2 bearing walls @ kitchen, close up (e) door replace kitchen window w/ext door, construct landing & stair. 2 dining room, windows w/sliding patio door. construct landing w/stair @ rear yard deck = below 10 ft high, not to extend beyond (e) rear wall of bldgDetails
remove 2 bearing walls @ kitchen, close up (e) door replace kitchen window w/ext door, construct landing & stair. 2 dining room, windows w/sliding patio door. construct landing w/stair @ rear yard deck = below 10 ft high, not to extend beyond (e) rear wall of bldg | $12,000 |
| Nov 16, 2018 | Completed final sign-off May 2019 | 737 Pine St | apt #35: convert (e) kitchen to bedroom. relocate kitchen, rehabilitate (e) bathroom, install washer/dryer. maher n/a.Details
apt #35: convert (e) kitchen to bedroom. relocate kitchen, rehabilitate (e) bathroom, install washer/dryer. maher n/a. | $40,000 |
| Sep 6, 2018 | Completed final sign-off Feb 2019 | 737 Pine St | unit #26 -rehabilitate (e) kitchen, bathroom. install 2nd bathroom, install w/d, convert dining area into bedroom. n/a for maher.Details
unit #26 -rehabilitate (e) kitchen, bathroom. install 2nd bathroom, install w/d, convert dining area into bedroom. n/a for maher. | $45,000 |
| Jun 20, 2018 | Completed final sign-off Oct 2018 | 1547 Clay St | unit #205: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maherDetails
unit #205: 1)rehabilitate extg kitchen. 2)rehabilitate extg bathroom. 3)install washer and dryer. n/a for maher | $32,000 |
| Oct 26, 2017 | Completed final sign-off Jun 2018 | 1360 Taylor St | #6- rehabilitate (e) kitchen & bathroom, convert dining to bedroom, install 2nd bathroom, install washer & dryer.Details
#6- rehabilitate (e) kitchen & bathroom, convert dining to bedroom, install 2nd bathroom, install washer & dryer. | $37,000 |
| Jul 3, 2017 | Completed final sign-off Aug 2017 | 758 Haight St | to comply with phsyical inspection report cc-8188.Details
to comply with phsyical inspection report cc-8188. | $10,000 |
| Jun 23, 2017 | Never finaled issued Jul 2017, no final | 1370 Taylor St | unit #10: convert (e) kitchen to storage, relocate kitchen, convert (e) living rm to bedroom, relocate living room, convert (e) playroom to bedroom, rehabilitate (e) bathrooms, convert (e) great rm to master bedroom, relocate washer dryer.Details
unit #10: convert (e) kitchen to storage, relocate kitchen, convert (e) living rm to bedroom, relocate living room, convert (e) playroom to bedroom, rehabilitate (e) bathrooms, convert (e) great rm to master bedroom, relocate washer dryer. | $49,000 |
| Jun 14, 2017 | Completed final sign-off Sep 2017 | 3157 Baker St | revision to 201705227260. kitchen and batroom renovationDetails
revision to 201705227260. kitchen and batroom renovation | |
| May 22, 2017 | Completed final sign-off Sep 2017 | 3157 Baker St | remodel (1) kitchen like for like, remodel (2) bathrooms like for likeDetails
remodel (1) kitchen like for like, remodel (2) bathrooms like for like | $35,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2017 | 1281 Vallejo St | unit 1: small interior renovation. move kitchen at living room. remove partitions only. no structural changes.Details
unit 1: small interior renovation. move kitchen at living room. remove partitions only. no structural changes. | $30,000 |
| Dec 20, 2016 | Completed final sign-off Apr 2017 | 407 Pennsylvania Av | to comply with physical inspection report #cc-8138Details
to comply with physical inspection report #cc-8138 | $7,500 |
| Dec 15, 2016 | Completed final sign-off Apr 2017 | 407 Pennsylvania Av | renew for final 201207245571Details
renew for final 201207245571 | |
| Dec 1, 2016 | Completed final sign-off Apr 2018 | 151 Bernard St | revision to 201411252632 s1 - alteration of foundations and of floor above storageDetails
revision to 201411252632 s1 - alteration of foundations and of floor above storage | $3,000 |
| Nov 7, 2016 | Expired or cancelled cancelled Mar 2017 | 255 Paris St | complete kitchen remodeling. add dishwasher.Details
complete kitchen remodeling. add dishwasher. | $12,000 |
| Sep 22, 2016 | Never finaled issued Dec 2016, no final | 78 Buchanan St | 4/f #304- remodel existing kitchen, remodel existing bathroom, add a bedroom, add washer & dryer. n/a ordinance #155-13Details
4/f #304- remodel existing kitchen, remodel existing bathroom, add a bedroom, add washer & dryer. n/a ordinance #155-13 | $25,000 |
| Jul 14, 2016 | Completed final sign-off Dec 2016 | 1801 Gough St | remodel unit 401, 5th floor - remodel (e) bathroom, relocate kitchen, convert (e) dining room into bedroom, add bathroom, add washer & dryer.Details
remodel unit 401, 5th floor - remodel (e) bathroom, relocate kitchen, convert (e) dining room into bedroom, add bathroom, add washer & dryer. | $60,000 |
| Apr 19, 2016 | Completed final sign-off Aug 2016 | 2055 Polk St | apt #2: remodel apartment interior. relocate wall and kitchen to add new bedroom, alter exit window at bedroom. no change in exit or increase in occupied area.Details
apt #2: remodel apartment interior. relocate wall and kitchen to add new bedroom, alter exit window at bedroom. no change in exit or increase in occupied area. | $15,000 |
| Feb 19, 2016 | Completed final sign-off Aug 2016 | 500 Stanyan St | unit #203 remodel at 3rd floor. remodel extg bathroom . convert extg kitchen into bedroom. relocate extg kitchen and add washer and dryer.Details
unit #203 remodel at 3rd floor. remodel extg bathroom . convert extg kitchen into bedroom. relocate extg kitchen and add washer and dryer. | $35,000 |
| Nov 12, 2015 | Completed final sign-off Feb 2016 | 2055 Polk St | apartment 9 remove wall and add beam. relocate kitchen. add bedroom.Details
apartment 9 remove wall and add beam. relocate kitchen. add bedroom. | $25,000 |
| Nov 26, 2014 | Completed final sign-off Apr 2018 | 151 Bernard St | complete remodel: doing a new top floor. turning the basement into living space.Details
complete remodel: doing a new top floor. turning the basement into living space. | $270,000 |