Block 1213, lot 013
500 Stanyan St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 6
- Units
- 36
- Rooms
- 36 bathrooms
- Building
- 29,520 sq ft
- Lot
- 6,046 sq ft
- Zoning
- RH3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 23, 2025 | Completed final sign-off Jun 2026 | 500 Stanyan St | Halyard Inc | fire alarm system upgrade to comply with sffc 1103.7.6.1 in no sprinklered buildingDetails
fire alarm system upgrade to comply with sffc 1103.7.6.1 in no sprinklered building | $5,000 |
| May 7, 2021 | Completed final sign-off Nov 2021 | 500 Stanyan St | Axel8 Construction | unit 105: revsion to pa #202012171242. convert (e) kitchen to bedroom, convert (e) bedroom to kitchen. relocate bathroom. install second bathroom. install washer/ dryer.Details
unit 105: revsion to pa #202012171242. convert (e) kitchen to bedroom, convert (e) bedroom to kitchen. relocate bathroom. install second bathroom. install washer/ dryer. | $18,000 |
| Jan 13, 2021 | Completed final sign-off Mar 2021 | 500 Stanyan St | B-Side Inc. | unit 302. rehab kitchen, replace washer dryer. no structural work, no wall alterationsDetails
unit 302. rehab kitchen, replace washer dryer. no structural work, no wall alterations | $20,000 |
| Dec 17, 2020 | Completed final sign-off Nov 2021 | 500 Stanyan St | Axel8 Construction | unit 105- convert existing kitchen to bedroom; convert (e) bedroom to kitchen; rehabilite (e) bathroom; install washer & dryerDetails
unit 105- convert existing kitchen to bedroom; convert (e) bedroom to kitchen; rehabilite (e) bathroom; install washer & dryer | $42,000 |
| Nov 5, 2020 | Completed final sign-off Jun 2021 | 500 Stanyan St | Axel8 Construction | apt 303: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a.Details
apt 303: convert (e) kitchen to bedroom, relocate kitchen, rehab (e) bathroom, install washer/dryer. maher n/a. | $40,000 |
| Jul 17, 2020 | Never finaled issued Jul 2020, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Feb 25, 2020 | Never finaled issued Mar 2020, no final | 500 Stanyan St | Axel8 Construction | apt #505: revision to app#201910154421 - revise layout.Details
apt #505: revision to app#201910154421 - revise layout. | |
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Oct 28, 2019 | Never finaled issued Oct 2019, no final | 500 Stanyan St | street space onlyDetails
street space only | ||
| Oct 15, 2019 | Completed final sign-off Dec 2020 | 500 Stanyan St | Axel8 Construction | convert e kitchen to bedroom, relocate kitchen, relocate bath, install 2nd bath, install washer dryerDetails
convert e kitchen to bedroom, relocate kitchen, relocate bath, install 2nd bath, install washer dryer | $46,000 |
| Sep 30, 2019 | Never finaled issued Sep 2019, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 500 Stanyan St | Axel8 Construction | 304: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install w/dDetails
304: convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install w/d | $40,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 500 Stanyan St | Axel8 Construction | rehabilitate (e) kitchen & bathroom. install w/d ventless unit 304 - near kitchenDetails
rehabilitate (e) kitchen & bathroom. install w/d ventless unit 304 - near kitchen | $22,000 |
| Jul 31, 2019 | Completed final sign-off Feb 2020 | 500 Stanyan St | Axel8 Construction | apt #504 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom. install w/dDetails
apt #504 - convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom. install w/d | $40,000 |
| Jan 3, 2019 | Completed final sign-off Jun 2019 | 500 Stanyan St | Palmera Construction Co | rehabilitate existing kitchen. rehabilitate existing bathroom. install bedroom. install washer/dryer.Details
rehabilitate existing kitchen. rehabilitate existing bathroom. install bedroom. install washer/dryer. | $33,000 |
| May 7, 2018 | Completed final sign-off Dec 2018 | 500 Stanyan St | Hue & Cry Security System | installation of new fire alarm system with full notification in all sleeping areas, smoker, pulls, remote annuciators with cell communication.Details
installation of new fire alarm system with full notification in all sleeping areas, smoker, pulls, remote annuciators with cell communication. | $57,000 |
| Feb 23, 2018 | Never finaled issued Feb 2018, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Jan 25, 2018 | Expired or cancelled cancelled Jan 2026 | 500 Stanyan St | revision to pa 2017-1121-4599 unit 602 layout change to kitchen and bedroomDetails
revision to pa 2017-1121-4599 unit 602 layout change to kitchen and bedroom | ||
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Nov 21, 2017 | Completed final sign-off Apr 2018 | 500 Stanyan St | Brighter Bay Builders Inc | convert e kitchen to bedroom, relocate kitchen, rehabilitate existing bath, install washer dryer - unit # 602Details
convert e kitchen to bedroom, relocate kitchen, rehabilitate existing bath, install washer dryer - unit # 602 | $30,000 |
| Mar 14, 2017 | Completed final sign-off Jul 2017 | 500 Stanyan St | D F K Y Construction Inc | unit 403, 5th floor convert existing kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom; install washer & dryerDetails
unit 403, 5th floor convert existing kitchen to bedroom; relocate kitchen, rehabilitate (e) bathroom; install washer & dryer | $36,000 |
| Dec 23, 2016 | Never finaled issued Dec 2016, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Nov 22, 2016 | Completed final sign-off Aug 2017 | 500 Stanyan St | Kin Wo Construction Inc. | remodel unit 305, 4th floor - relocate (e) kitchen, relocate (e) bathroom, add bathroom, add washer/dryer, convert (e) kitchen to bedroomDetails
remodel unit 305, 4th floor - relocate (e) kitchen, relocate (e) bathroom, add bathroom, add washer/dryer, convert (e) kitchen to bedroom | $38,000 |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 500 Stanyan St | street spaceDetails
street space | ||
| Aug 31, 2016 | Expired or cancelled cancelled Jan 2026 | 500 Stanyan St | revision to ref pa 201608044214; relocate (e) kitchen to convert existing kitchen area to bedroom in unit #103 (exterior facing windows with egrees dimensions per cbc 1029Details
revision to ref pa 201608044214; relocate (e) kitchen to convert existing kitchen area to bedroom in unit #103 (exterior facing windows with egrees dimensions per cbc 1029 | $10,000 | |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 500 Stanyan St | street space permitDetails
street space permit | ||
| Aug 4, 2016 | Completed final sign-off Feb 2017 | 500 Stanyan St | Kwan Wo Ironworks Inc | unit #103 on the 2nd floor - remodel existing bathroom, existing kitchen, add washer & dryer. n/a maher ordinanceDetails
unit #103 on the 2nd floor - remodel existing bathroom, existing kitchen, add washer & dryer. n/a maher ordinance | $24,000 |
| Jul 11, 2016 | Completed final sign-off Mar 2017 | 500 Stanyan St | Architectural Fenestration & Restoration | replace 226 windows w/new pella architectural series aluminum clad wood windows, will include flush ogee lugs w. upper sash.Details
replace 226 windows w/new pella architectural series aluminum clad wood windows, will include flush ogee lugs w. upper sash. | $226,000 |
| Feb 19, 2016 | Completed final sign-off Aug 2016 | 500 Stanyan St | A G C I Inc | unit #203 remodel at 3rd floor. remodel extg bathroom . convert extg kitchen into bedroom. relocate extg kitchen and add washer and dryer.Details
unit #203 remodel at 3rd floor. remodel extg bathroom . convert extg kitchen into bedroom. relocate extg kitchen and add washer and dryer. | $35,000 |
| Aug 14, 2015 | Expired or cancelled cancelled Jan 2026 | 500 Stanyan St | unit 402, interior renovation of (e) unitwithin (e) building to include: relocation & remodel of 9e) kitchen and (e) bathroom; addition of washer & ventless dryerDetails
unit 402, interior renovation of (e) unitwithin (e) building to include: relocation & remodel of 9e) kitchen and (e) bathroom; addition of washer & ventless dryer | $50,000 | |
| May 29, 2014 | Completed final sign-off Oct 2014 | 500 Stanyan St | B-Side Inc. | interior remodel for unit 601, add a new laundry room, remove (e) non-bearing wall, remodel (e) kitchen fixture and cabinets, remodel (e) bathroom. plumbling and electrical under separate permit. maher n/a.Details
interior remodel for unit 601, add a new laundry room, remove (e) non-bearing wall, remodel (e) kitchen fixture and cabinets, remodel (e) bathroom. plumbling and electrical under separate permit. maher n/a. | $20,000 |
| Apr 7, 2014 | Completed final sign-off May 2014 | 500 Stanyan St | B-Side Inc. | work in unit 603: countertop replacement, bathroom tile replacement.Details
work in unit 603: countertop replacement, bathroom tile replacement. | $5,000 |
| Jan 21, 2014 | Completed final sign-off Jul 2014 | 500 Stanyan St | B-Side Inc. | unit #605 - remove/add interior non-bearing walls, remodel bath & add (n) bath. relocate kitchen, convert (e) into (n) bedroom, add washer/dryer, new lighting ot modified spacesDetails
unit #605 - remove/add interior non-bearing walls, remodel bath & add (n) bath. relocate kitchen, convert (e) into (n) bedroom, add washer/dryer, new lighting ot modified spaces | $50,000 |
| Jan 7, 2014 | Completed final sign-off May 2014 | 500 Stanyan St | B-Side Inc. | unit #604 - remove/add interior walls, remodel bath, relocate kitchen into (n) bedroom, add washer/dryer unit, new lighting to modified spaces.Details
unit #604 - remove/add interior walls, remodel bath, relocate kitchen into (n) bedroom, add washer/dryer unit, new lighting to modified spaces. | $40,000 |
| Feb 14, 2013 | Completed final sign-off Jun 2013 | 500 Stanyan St | Schoepp Construction Inc | all work in unit #101 - new toilet & sink fixtures in (e) bath. add washer/dryer unit.Details
all work in unit #101 - new toilet & sink fixtures in (e) bath. add washer/dryer unit. | $1,500 |
| Feb 1, 2013 | Never finaled issued Feb 2013, no final | 500 Stanyan St | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 21, 2012 | Completed final sign-off Jun 2013 | 500 Stanyan St | Schoepp Construction Inc | remove & replace counter top & sink only in apt 101 in kitchen only. no cabinets, no lighting change. no windows or doors.Details
remove & replace counter top & sink only in apt 101 in kitchen only. no cabinets, no lighting change. no windows or doors. | $3,000 |
| Sep 7, 2012 | Completed final sign-off Nov 2012 | 500 Stanyan St | Schoepp Construction Inc | remodel & replace cabs, counter top, sink (kitchen), vanity, sink (bath), no lighting. no range, no exhaust fan.Details
remodel & replace cabs, counter top, sink (kitchen), vanity, sink (bath), no lighting. no range, no exhaust fan. | $10,000 |
| Aug 2, 2012 | Completed final sign-off Aug 2013 | 500 Stanyan St | Schoepp Construction Inc | #501: remodel kitchen/bath- countertops, cabinets, sink @ kitchen. toilet, sink, vanity @ bath. no lighting change.Details
#501: remodel kitchen/bath- countertops, cabinets, sink @ kitchen. toilet, sink, vanity @ bath. no lighting change. | $15,000 |
| May 2, 2011 | Completed final sign-off May 2011 | 500 Stanyan St | Doorman Property Management | removal of non-bearing partion in garage.Details
removal of non-bearing partion in garage. | $800 |
| Mar 28, 2008 | Completed final sign-off Jun 2008 | 500 Stanyan St | C 3 Remodel Inc | work @ unit# 306 only. refer to nov# 200841233, to comply with his nov# 200343705 & nov# 200841233 dated 09/08/2003 & 02/14/2008. repair fire proofing with approved materials 1 hour rated fire wall. above gas meter approx 8 sq. ft. @ laundry room.Details
work @ unit# 306 only. refer to nov# 200841233, to comply with his nov# 200343705 & nov# 200841233 dated 09/08/2003 & 02/14/2008. repair fire proofing with approved materials 1 hour rated fire wall. above gas meter approx 8 sq. ft. @ laundry room. | $2,000 |
| Feb 18, 2005 | Completed final sign-off Aug 2005 | 500 Stanyan St | Renaissance Renovations | renew permit 200207030604 to comply w/bid nov & legalize remodel in 6 units started w/out permitDetails
renew permit 200207030604 to comply w/bid nov & legalize remodel in 6 units started w/out permit | |
| Jul 3, 2002 | Expired or cancelled expired Jan 2004 | 500 Stanyan St | Renaissance Renovations | remove some walls, non bearing replace kitchen cabinets per plan no structural nov 2002292698Details
remove some walls, non bearing replace kitchen cabinets per plan no structural nov 2002292698 | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (8), B-Side Inc. (5), Schoepp Construction Inc (4), Renaissance Renovations (2), A G C I Inc, Architectural Fenestration & Restoration, Brighter Bay Builders Inc, C 3 Remodel Inc, D F K Y Construction Inc, Doorman Property Management, Halyard Inc, Hue & Cry Security System, Kin Wo Construction Inc., Kwan Wo Ironworks Inc, Palmera Construction Co
- Architects
- Joe Kon (2)
- Engineers
- Daniel Barringer (3), Joe Win Kon (3), Joe Kon
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.