Block 0640, lot 004
1801 Gough St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 5
- Units
- 41
- Rooms
- 42 bathrooms
- Building
- 39,660 sq ft
- Lot
- 9,577 sq ft
- Zoning
- RM3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
47 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 2, 2025 | Completed final sign-off Dec 2025 | 1801 Gough St | Rain Defense | recommencement and completion of work approved under pa # 202209122241.Details
recommencement and completion of work approved under pa # 202209122241. | $28,500 |
| Mar 28, 2024 | In progress filed Mar 2024, not yet issued | 1801 Gough St | Halyard Inc | upgrade fire alarm system to current codes, nfpa 72(2022) to comply with sffc 1103.7.6.1 to provide low freq sounders in sleeping areas.Details
upgrade fire alarm system to current codes, nfpa 72(2022) to comply with sffc 1103.7.6.1 to provide low freq sounders in sleeping areas. | $99,254 |
| Sep 12, 2022 | Expired or cancelled expired Dec 2025 | 1801 Gough St | Rain Defense | remove (e) deck and fencing, repair parapet wall, replace roof over top deck replace decking and fenceDetails
remove (e) deck and fencing, repair parapet wall, replace roof over top deck replace decking and fence | $30,000 |
| Jul 26, 2021 | Completed final sign-off Jan 2022 | 1801 Gough St | Axel8 Construction | unit #501. 1. convert existing kitchen to bath. 2. convert existing dining to bedroom 3. relocate kitchen. 4. rehabilitate existing bathroom. 5. install washer and dryer.Details
unit #501. 1. convert existing kitchen to bath. 2. convert existing dining to bedroom 3. relocate kitchen. 4. rehabilitate existing bathroom. 5. install washer and dryer. | $45,000 |
| Jul 13, 2021 | Completed final sign-off Feb 2022 | 1801 Gough St | Axel8 Construction | unit 307 - convert (e) kitchen to storage; relocate kitchen and rehabilitate (e) bathroom; install washer & dryer; install new bathroom; convert (e) dining to studyDetails
unit 307 - convert (e) kitchen to storage; relocate kitchen and rehabilitate (e) bathroom; install washer & dryer; install new bathroom; convert (e) dining to study | $45,000 |
| Jul 2, 2021 | Completed final sign-off Dec 2021 | 1801 Gough St | Axel8 Construction | unit 206 - rehabilitate existing bathroom and kitchen; install washer & dryerDetails
unit 206 - rehabilitate existing bathroom and kitchen; install washer & dryer | $35,000 |
| May 19, 2021 | Completed final sign-off Sep 2021 | 1801 Gough St | Axel8 Construction | unit 302: convert existing kitchen to bedroom. relocate kitchen and rehabilitate existing bathroom, install washer and dryer.Details
unit 302: convert existing kitchen to bedroom. relocate kitchen and rehabilitate existing bathroom, install washer and dryer. | $42,000 |
| Apr 13, 2021 | Completed final sign-off Sep 2021 | 1801 Gough St | Axel8 Construction | unit #402: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washier and dryerDetails
unit #402: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washier and dryer | $42,000 |
| Apr 13, 2021 | Never finaled issued May 2021, no final | 1801 Gough St | Axel8 Construction | unit# 502: rev to pa# 202102043972; convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washier and dryerDetails
unit# 502: rev to pa# 202102043972; convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washier and dryer | $42,000 |
| Feb 4, 2021 | Completed final sign-off Jul 2021 | 1801 Gough St | Axel8 Construction | #502: rehabilitate existing kitchen & bathroom. install washer & ventless electricaldryer in existing closet.Details
#502: rehabilitate existing kitchen & bathroom. install washer & ventless electricaldryer in existing closet. | $35,000 |
| Oct 6, 2020 | Completed final sign-off Jun 2021 | 1801 Gough St | Axel8 Construction | unit 407: convert (e) dining room to bedroom . relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install washer & dryer.Details
unit 407: convert (e) dining room to bedroom . relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install washer & dryer. | $40,000 |
| Oct 6, 2020 | Completed final sign-off Apr 2021 | 1801 Gough St | Axel8 Construction | unit # 202: convert existing dining room to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer.Details
unit # 202: convert existing dining room to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer & dryer. | $40,000 |
| Oct 6, 2020 | Completed final sign-off Jun 2021 | 1801 Gough St | Axel8 Construction | unit #601: convert (e) dining room to bedroom. convert (e) kitchen to bathroom. relocate kitchen. rehabilitate (e) bathrooom. install washer & dryer.Details
unit #601: convert (e) dining room to bedroom. convert (e) kitchen to bathroom. relocate kitchen. rehabilitate (e) bathrooom. install washer & dryer. | $40,000 |
| Jul 20, 2020 | Completed final sign-off Feb 2021 | 1801 Gough St | Axel8 Construction | unit #305 - convert (e) dining room to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryerDetails
unit #305 - convert (e) dining room to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer and dryer | $40,000 |
| Jul 16, 2020 | Completed final sign-off Feb 2021 | 1801 Gough St | Axel8 Construction | #602: 1)convert extg dinning room to bedroom. 2)relocate kitchen. 3)rehabilitate extg 6 bathrooms. 4)install washer and dryer.Details
#602: 1)convert extg dinning room to bedroom. 2)relocate kitchen. 3)rehabilitate extg 6 bathrooms. 4)install washer and dryer. | $40,000 |
| Mar 16, 2020 | Completed final sign-off Aug 2020 | 1801 Gough St | B-Side Inc. | unit 100: remodel kitchen in-kind.Details
unit 100: remodel kitchen in-kind. | $15,000 |
| Jan 30, 2020 | Never finaled issued Jan 2020, no final | 1801 Gough St | street space onlyDetails
street space only | ||
| Dec 23, 2019 | Never finaled issued Dec 2019, no final | 1801 Gough St | street spaceDetails
street space | ||
| Nov 12, 2019 | Never finaled issued Nov 2019, no final | 1801 Gough St | Axel8 Construction | apt 605 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate (e) bathroom and install washer & dryer. maher n/a.Details
apt 605 - convert existing kitchen to bedroom; relocate kitchen; rehabilitate (e) bathroom and install washer & dryer. maher n/a. | $38,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2019 | 1801 Gough St | B-Side Inc. | unit 204: upgrade (e) washer dryer in (e) closetDetails
unit 204: upgrade (e) washer dryer in (e) closet | $5,000 |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 1801 Gough St | Brighter Bay Builders Inc | unit 506: convert e dining to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer and dryerDetails
unit 506: convert e dining to bedroom, rehabilitate e kitchen, rehabilitate e bath, install washer and dryer | $32,000 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 1801 Gough St | street spaceDetails
street space | ||
| Jul 9, 2018 | Completed final sign-off Dec 2018 | 1801 Gough St | Brighter Bay Builders Inc | #208 -convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. inatall w/dDetails
#208 -convert (e) kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. inatall w/d | $45,000 |
| Mar 8, 2018 | Expired or cancelled cancelled May 2025 | 1801 Gough St | addition of 5 dwelling units per ordinance# 162-16 . all work is located within (e) building envelope @ the 1st floor.Details
addition of 5 dwelling units per ordinance# 162-16 . all work is located within (e) building envelope @ the 1st floor. | $150,000 | |
| Sep 11, 2017 | Completed final sign-off Mar 2018 | 1801 Gough St | J C Tan Builders | unit 507 - convert existing kitchen to storage; relocate kitchen; convert existing dining room to bedroom; rehabilitate existing bathroom; install 2nd bathroom; install washer/dryerDetails
unit 507 - convert existing kitchen to storage; relocate kitchen; convert existing dining room to bedroom; rehabilitate existing bathroom; install 2nd bathroom; install washer/dryer | $48,000 |
| Jan 13, 2017 | Never finaled issued Feb 2017, no final | 1801 Gough St | Palmera Construction Co | apt 308, 3rd floor - convert (e) kitchen into den, relocate kitchen into dining room, remodel (e) bathroom. add washer & dryerDetails
apt 308, 3rd floor - convert (e) kitchen into den, relocate kitchen into dining room, remodel (e) bathroom. add washer & dryer | $34,000 |
| Jul 14, 2016 | Completed final sign-off Dec 2016 | 1801 Gough St | A G C I Inc | remodel unit 401, 5th floor - remodel (e) bathroom, relocate kitchen, convert (e) dining room into bedroom, add bathroom, add washer & dryer.Details
remodel unit 401, 5th floor - remodel (e) bathroom, relocate kitchen, convert (e) dining room into bedroom, add bathroom, add washer & dryer. | $60,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 1801 Gough St | street spaceDetails
street space | ||
| Dec 19, 2014 | Completed final sign-off Oct 2015 | 1801 Gough St | B-Side Inc. | unit #408: remodel existing unit, remove non-bearing walls, add laundry outlet & den and bathroom & closet, relocating kitchen fixtures & cabinets & remodel existing bathrm & add new bathroomDetails
unit #408: remodel existing unit, remove non-bearing walls, add laundry outlet & den and bathroom & closet, relocating kitchen fixtures & cabinets & remodel existing bathrm & add new bathroom | $10,000 |
| Nov 26, 2014 | Completed final sign-off Jul 2015 | 1801 Gough St | B-Side Inc. | #504- remodel non-bearing wall, add bathroom. relocate kitchen & remodel kitchen & bathroom, add (n) washer & dryer.Details
#504- remodel non-bearing wall, add bathroom. relocate kitchen & remodel kitchen & bathroom, add (n) washer & dryer. | $10,000 |
| Nov 25, 2014 | Completed final sign-off Jul 2015 | 1801 Gough St | B-Side Inc. | remodel unit 607: remove 6 non bearing walls, add washer and dryer. relocate kitchen, remodel kitchen and bathDetails
remodel unit 607: remove 6 non bearing walls, add washer and dryer. relocate kitchen, remodel kitchen and bath | $10,000 |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 1801 Gough St | street space permitDetails
street space permit | ||
| Sep 18, 2014 | Never finaled issued Oct 2014, no final | 1801 Gough St | B-Side Inc. | remodel unit 303. remove non bearing walls, add laundry outlet. relocate kitchen fixtures; add laundry outlet & new washer and dryer. relocate kitchen fixture & remodel bathroom in kind.Details
remodel unit 303. remove non bearing walls, add laundry outlet. relocate kitchen fixtures; add laundry outlet & new washer and dryer. relocate kitchen fixture & remodel bathroom in kind. | $10,000 |
| Jan 30, 2014 | Completed final sign-off May 2014 | 1801 Gough St | Sandbank Construction, Inc | remodel unit 207. remove non bearing walls. add laundry outlet, add a bedroom and bath, closets. relocate kitchen fixtures and cabinets. remodel existing bathroomsDetails
remodel unit 207. remove non bearing walls. add laundry outlet, add a bedroom and bath, closets. relocate kitchen fixtures and cabinets. remodel existing bathrooms | $30,000 |
| Dec 11, 2013 | Never finaled issued Dec 2013, no final | 1801 Gough St | street spaceDetails
street space | ||
| Nov 15, 2013 | Completed final sign-off Mar 2014 | 1801 Gough St | Pacific General Construction | unit # 403: remove non-bearing walls. add laundry outlet, and a den and a closet. relocate extg kitchen fixutures and cabs. remodel bathroom.Details
unit # 403: remove non-bearing walls. add laundry outlet, and a den and a closet. relocate extg kitchen fixutures and cabs. remodel bathroom. | $6,000 |
| Oct 31, 2013 | Completed final sign-off Jan 2014 | 1801 Gough St | Pacific General Construction | unit #203-remodel bathroom, relocate kitchen, painting, remove non bearing walls. new kitchen cabinetsDetails
unit #203-remodel bathroom, relocate kitchen, painting, remove non bearing walls. new kitchen cabinets | $30,000 |
| Jul 30, 2013 | Never finaled issued Jul 2013, no final | 1801 Gough St | Eagle Ridge Construction And Roofing | unit #402-comply with nov# 200875376-remodel of kitchen & bathroomDetails
unit #402-comply with nov# 200875376-remodel of kitchen & bathroom | $8,000 |
| Mar 18, 2013 | Never finaled issued Mar 2013, no final | 1801 Gough St | street space permitDetails
street space permit | ||
| Feb 15, 2013 | Completed final sign-off Oct 2013 | 1801 Gough St | B I G Construction | remodel units #405, #505 & #503 remodel kitchen & bathroom. remove non-bearing walls, add laundry outlet, add (n) den, (n) closet & (n) living room.Details
remodel units #405, #505 & #503 remodel kitchen & bathroom. remove non-bearing walls, add laundry outlet, add (n) den, (n) closet & (n) living room. | $27,000 |
| Oct 23, 2007 | Completed final sign-off Feb 2008 | 1801 Gough St | Cardona Construction | work on unit#307. kitchen upgrade cabinet, sink and countertop and flooring.bathroom upgrade tub tile and flooring and minor drywall repair. no structural work.Details
work on unit#307. kitchen upgrade cabinet, sink and countertop and flooring.bathroom upgrade tub tile and flooring and minor drywall repair. no structural work. | $15,500 |
| Feb 20, 2007 | Completed final sign-off May 2007 | 1801 Gough St | Can Do Contractors | unit #201-kitchen upgrade: cabinets, kitchen sink, counters and flooring. bathroom: upgrade tub tile,flooring, plumbing fixtures in kind. bathroom and kitchen lighting to be flourscent. minor dry rot repair at kitchen and bathroom.Details
unit #201-kitchen upgrade: cabinets, kitchen sink, counters and flooring. bathroom: upgrade tub tile,flooring, plumbing fixtures in kind. bathroom and kitchen lighting to be flourscent. minor dry rot repair at kitchen and bathroom. | $13,500 |
| Mar 17, 2005 | Completed final sign-off May 2005 | 1801 Gough St | Frankie English Dba Doe Mabuhay Builders | sheetrock 1 hour fire rated. all opening basement walls and ceilingDetails
sheetrock 1 hour fire rated. all opening basement walls and ceiling | $3,000 |
| Nov 26, 2002 | Completed final sign-off Mar 2003 | 1801 Gough St | Coll Construction, Inc. | add additional $18,000.00 to permit value per district inspection requestDetails
add additional $18,000.00 to permit value per district inspection request | $24,000 |
| Aug 22, 2002 | Completed final sign-off Mar 2003 | 1801 Gough St | Coll Construction, Inc. | remove existing paster, rewire unit & replaster interior, replace kitchen & bathrm cabsDetails
remove existing paster, rewire unit & replaster interior, replace kitchen & bathrm cabs | $6,000 |
| Mar 14, 2002 | Completed final sign-off Mar 2003 | 1801 Gough St | John Morrison Inc | renew:200101260697 to complete workDetails
renew:200101260697 to complete work | $100,000 |
| Jan 26, 2001 | Expired or cancelled expired Jan 2002 | 1801 Gough St | John Morrison Inc | replace 375 windows all sides.Details
replace 375 windows all sides. | $180,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.