472 permits since 2000 (engineer on 425 permits, architect on 34 permits, designer on 12 permits, authorized agent-others on 1 permit): 323 completed, 28 in progress, 53 never finaled, 68 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 472.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 394 Laidley St | rev 201612296232: new entry door at garage level. minor shifting of a handful of interior partition walls. removal of 3 non-egress windows and skylights from scope of work.Details
rev 201612296232: new entry door at garage level. minor shifting of a handful of interior partition walls. removal of 3 non-egress windows and skylights from scope of work. | ||
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 254 08th Av | create new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab.Details
create new parking space; remove (e) wall in garage, new steel structural beam, wood posts + conc. footings, new partial conc slab. | $35,000 | |
| Jul 24, 2026 | In progress issued Jul 2026 | 30 Lopez Av | Javier Magana Construction Services | revision to 202605271951 for structural framing at door way.Details
revision to 202605271951 for structural framing at door way. | |
| Jul 1, 2026 | In progress issued Jul 2026 | 2814 Clay St | removing (e) barrel vauted garage. install new garage door. rebuild (e) exterior stair from sidewalk to front door with rise and run per code. remove (e) exterior stair on west side. (e) interior stair from level 2 to 3 rebuilt per code under separate permit.Details
removing (e) barrel vauted garage. install new garage door. rebuild (e) exterior stair from sidewalk to front door with rise and run per code. remove (e) exterior stair on west side. (e) interior stair from level 2 to 3 rebuilt per code under separate permit. | $49,000 | |
| Jun 18, 2026 | In progress issued Jun 2026 | 262 Lexington St | Blue Bend Construction Inc | revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair.Details
revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair. | |
| Jun 11, 2026 | In progress issued Jun 2026 | 628 Shotwell St | 3rd flr: bathroom 2 (n) bathtub and relocate toilet. bathroom 4 remove partition wall, (n) bathtub and relocate toilet. (n) electrical and plumbing as required at area of work only.Details
3rd flr: bathroom 2 (n) bathtub and relocate toilet. bathroom 4 remove partition wall, (n) bathtub and relocate toilet. (n) electrical and plumbing as required at area of work only. | $5,000 | |
| May 27, 2026 | In progress issued Jun 2026 | 30 Lopez Av | Javier Magana Construction Services | convert existing storage to new bed and bath.Details
convert existing storage to new bed and bath. | $25,000 |
| May 20, 2026 | In progress issued Jul 2026 | 622 24th Av | 1st/f: remodel e) fl space to n) home office, media rm, bath & laundry. wet bar.Details
1st/f: remodel e) fl space to n) home office, media rm, bath & laundry. wet bar. | $123,000 | |
| May 15, 2026 | Completed final sign-off Jul 2026 | 1443 Hudson Av | Connor Daly Corporation | revision 202512182101- footing detail to reflect actual field verified conditionDetails
revision 202512182101- footing detail to reflect actual field verified condition | $34,000 |
| Apr 30, 2026 | In progress issued Sep 2026 | 511 Elizabeth St | Stephen Mc Elroy Construction Llc. | revision to 202408219182: reduce scope of work to partial renovation & 242 sf rear yard addition to reduce from 492 sf to 242 sf addition. removal of front facade updates.Details
revision to 202408219182: reduce scope of work to partial renovation & 242 sf rear yard addition to reduce from 492 sf to 242 sf addition. removal of front facade updates. | |
| Apr 15, 2026 | In progress issued May 2026 | 20 Blake St | D3 Construction | 3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck.Details
3rd floor (top floor) reconfiguration of kitchen & living room, reconfiguration of rear bedroom to master bedroom & adding new master bath (n) electrical and plumbing as required at rear of work only, adding new roof deck. | $80,000 |
| Apr 13, 2026 | In progress issued Oct 2026 | 125 Alma St | General Max Construction | addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony.Details
addition to existing 3rd floor to remodel existing rooms & add new bedroom and balcony. | $200,000 |
| Feb 20, 2026 | In progress issued Feb 2026 | 1443 Hudson Av | Connor Daly Corporation | revision to 202512182101: replace e) window with french doorsDetails
revision to 202512182101: replace e) window with french doors | $500 |
| Jan 20, 2026 | In progress issued Jan 2026 | 2627 21st St | Jose Martinez | reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodelDetails
reconstruct front woor stairs to be code compliant. reconstruct rear deck & stairs in kind. replace front 2nd fl wood windows and all rear windows. front wood windows to match existing style & size. install new hardie siding at rear facade. kitchen and bathroom remodel | $100,000 |
| Dec 1, 2025 | Completed final sign-off Apr 2026 | 976 Noe St | D3 Construction | 1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed.Details
1st fl: existing posts at garage to be removed. 3rd fl: existing portion of wall between kitchen and dining room to be removed. | $3,780 |
| Oct 31, 2025 | Completed final sign-off Jan 2026 | 1301 41st Av | Aurora Builders | new home lift from 1st and 2nd flr within (e) building.Details
new home lift from 1st and 2nd flr within (e) building. | $40,000 |
| Oct 14, 2025 | In progress issued May 2026 | 108 Chattanooga St | Tip Managers Inc | rear horiz. addition & infill @ 2nd & 3rd flrs; expansion of conditioned living space to 1st flr toliving space to the 1st flr to include guest/exercise rm & bath; reconfigure rear kitchen & dining areas & convert full bath to powder rm @ 2nd fl; renova & reconfigure 3rd flr bedrms & bath to add.Details
rear horiz. addition & infill @ 2nd & 3rd flrs; expansion of conditioned living space to 1st flr toliving space to the 1st flr to include guest/exercise rm & bath; reconfigure rear kitchen & dining areas & convert full bath to powder rm @ 2nd fl; renova & reconfigure 3rd flr bedrms & bath to add. | $300,000 |
| Oct 9, 2025 | In progress issued Nov 2025 | 3531 Vicente St | new deck & stair with roof covering at rear yard. replace rear windows & exterior door w/ marvin units. no work to front of house. no interior work, no new habitable space proposedDetails
new deck & stair with roof covering at rear yard. replace rear windows & exterior door w/ marvin units. no work to front of house. no interior work, no new habitable space proposed | $20,000 | |
| Sep 12, 2025 | In progress issued Feb 2026 | 4210 22nd St | 1/f: attached adu include remodel and ext of (e) structure.convert (e) area adj and to rear of garage & excavation. 2/f:remove porch area to match neighborhood vernacular of porch entry.mirror plan on g/f and in-fill.extend match structure on w/s.3/f: match roof line back to align with structure.Details
1/f: attached adu include remodel and ext of (e) structure.convert (e) area adj and to rear of garage & excavation. 2/f:remove porch area to match neighborhood vernacular of porch entry.mirror plan on g/f and in-fill.extend match structure on w/s.3/f: match roof line back to align with structure. | $1,050,000 | |
| Sep 3, 2025 | In progress issued Oct 2025 | 350 Cumberland St | Olive Construction Corp | new garden retaining wall at rear yardDetails
new garden retaining wall at rear yard | $15,980 |
| Aug 19, 2025 | In progress issued Feb 2026 | 267 28th Av | D3 Construction | basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet.Details
basement: rear horizontal addition of family room, bathroom and storage; 1/f: horizontal addition includes new family room, new kitchen; 2/f: horizontal addition includes new 2 bedrooms, new 2 walk-in-closets, remodel primary closet. | $350,000 |
| Aug 18, 2025 | Completed final sign-off Sep 2026 | 152 Fairmount St | D3 Construction | first floor: replace (e) door and (e) windows with (n) door and psl header second floor: replace rear (e) door in kind. no change to opening dimenionsDetails
first floor: replace (e) door and (e) windows with (n) door and psl header second floor: replace rear (e) door in kind. no change to opening dimenions | $10,000 |
| Aug 13, 2025 | Completed final sign-off Apr 2026 | 628 Shotwell St | Tip Managers Inc | revision for roof framing on permits 201911197709 and 202504083990.Details
revision for roof framing on permits 201911197709 and 202504083990. | |
| Jun 27, 2025 | In progress issued Jun 2025 | 240 Vicente St | Jwl 888 Construction Inc | rev 202406275391: add 2 inseet beams per structural drawning. garage door replacementDetails
rev 202406275391: add 2 inseet beams per structural drawning. garage door replacement | |
| Jun 26, 2025 | In progress issued Jul 2025 | 1077 Fell St | Velox Construction Inc/Velox Des & Const | revisions for approved pa 202405172393: structural work - this approved plan set inaccurately showed rear wall dimensions. new arch/structural plan show correct dimensions. minor structural revision.Details
revisions for approved pa 202405172393: structural work - this approved plan set inaccurately showed rear wall dimensions. new arch/structural plan show correct dimensions. minor structural revision. | $8,500 |
| May 27, 2025 | Completed final sign-off Nov 2025 | 2 Dawnview Wy | revision to 202312072145 - change railing on deck to trex pre fabucated glass railingDetails
revision to 202312072145 - change railing on deck to trex pre fabucated glass railing | $1,500 | |
| May 16, 2025 | Completed final sign-off May 2026 | 642 Washington St | Radiant Construction Company | revision to pa #202302061437 remove floor opening btwn 1st & 2nd fl. remove non structural wood columns at basement. remove 1 skylight & infill opening. amend fire rated walls at restrooms. minor changes of interior non partition per field adjustment from approved plansDetails
revision to pa #202302061437 remove floor opening btwn 1st & 2nd fl. remove non structural wood columns at basement. remove 1 skylight & infill opening. amend fire rated walls at restrooms. minor changes of interior non partition per field adjustment from approved plans | |
| May 13, 2025 | Completed final sign-off Nov 2025 | 3782 21st St | Cook Construction | revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrationsDetails
revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrations | $5,000 |
| May 1, 2025 | In progress issued May 2026 | 1057 Pacific Av | O Donoghue Construction Inc. | vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit.Details
vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit. | $915,000 |
| Apr 21, 2025 | Completed final sign-off Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | revision to permit 202210144345. voluntary foundation reinforcement of crawl space. (front building)Details
revision to permit 202210144345. voluntary foundation reinforcement of crawl space. (front building) | $30,000 |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | Cook Construction | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| Mar 26, 2025 | In progress issued May 2025 | 226 Louisburg St | A-1 Dynamic Builders Inc. | rev pa 202407186748, relocate minisplit to rear, remove door from adu to garage. (e) water heater & furnace remain same location.Details
rev pa 202407186748, relocate minisplit to rear, remove door from adu to garage. (e) water heater & furnace remain same location. | |
| Feb 7, 2025 | Expired or cancelled cancelled Feb 2025 | 2814 Clay St | Acri Ddc | revise legalization pa# 202106182818. add 4 stop hydraulic elevator. add interior hallway @ basement. remove (e) exterior stairway. rebuild interior stair in kind from level 2 to 3 to meet code. remodel level 3 kitchen & bathroom. 90 sq reare addition @ level 3 within buildable area. reframe level 3Details
revise legalization pa# 202106182818. add 4 stop hydraulic elevator. add interior hallway @ basement. remove (e) exterior stairway. rebuild interior stair in kind from level 2 to 3 to meet code. remodel level 3 kitchen & bathroom. 90 sq reare addition @ level 3 within buildable area. reframe level 3 | $149,000 |
| Dec 19, 2024 | Expired or cancelled expired Apr 2026 | 1827 33rd Av | Bc United Construction Inc | revision to pa # 2024-1011-2864 scope of work includes changes to previously approved voluntary perameter foundation only. no expansion of (e) footprintDetails
revision to pa # 2024-1011-2864 scope of work includes changes to previously approved voluntary perameter foundation only. no expansion of (e) footprint | |
| Dec 13, 2024 | In progress issued Dec 2024 | 97 Hoff St | Seagren General Contracting Inc | to comply with nov 202302670. secure framing structure.Details
to comply with nov 202302670. secure framing structure. | $20,000 |
| Oct 3, 2024 | In progress issued Feb 2026 | 511 Elizabeth St | partial renovation & rear yard addition to single family home. renovation of front facade. widen driveway & widen garage door.Details
partial renovation & rear yard addition to single family home. renovation of front facade. widen driveway & widen garage door. | $450,000 | |
| Aug 5, 2024 | In progress issued Aug 2024 | 47 Worth St | San Francisco Developers | main floor remodeling. ref pa#202406214999 and 202403046978; replacement of windows at rear, add skylights; seismic strenghtening at 2nd floor, widening window opening in the back of houseDetails
main floor remodeling. ref pa#202406214999 and 202403046978; replacement of windows at rear, add skylights; seismic strenghtening at 2nd floor, widening window opening in the back of house | $20,000 |
| Jul 18, 2024 | In progress issued Oct 2024 | 22 Gennessee St | Alvarado & Son Construction Inc | demolish portions of g/f and 2/f. construct new small closet addition at 2/f entry. interior work includes new walls, doors, windows. relocate stairway, new kitchen, upgrade bathrooms, add new skylights. install new hvac and water heater. expand g/f primary suite.Details
demolish portions of g/f and 2/f. construct new small closet addition at 2/f entry. interior work includes new walls, doors, windows. relocate stairway, new kitchen, upgrade bathrooms, add new skylights. install new hvac and water heater. expand g/f primary suite. | $267,350 |
| May 20, 2024 | In progress issued Jul 2024 | 460 Lansdale Av | Winwin Construction Inc | repair drywall throughout. window replacements at front and sides of the building. deck replacement in rear. repair 3 bathrooms & 2 kitchens. install new skylightDetails
repair drywall throughout. window replacements at front and sides of the building. deck replacement in rear. repair 3 bathrooms & 2 kitchens. install new skylight | $200,000 |
| May 1, 2024 | Completed final sign-off Sep 2025 | 71 Bradford St | Doran Construction & Design | revision to pa 202401294833. partial foundation upgrade.Details
revision to pa 202401294833. partial foundation upgrade. | $32,725 |
| Mar 14, 2024 | Completed final sign-off Sep 2024 | 1645 Golden Gate Av | J P F Construction | soft story retrofit (mandatory)- soft story retrofit per sfebc ch. 4d engineering criteria asce 41-13Details
soft story retrofit (mandatory)- soft story retrofit per sfebc ch. 4d engineering criteria asce 41-13 | $10,000 |
| Feb 23, 2024 | Completed final sign-off Sep 2025 | 169 Precita Av | D3 Construction | ground fl remodel. convert e library into family room w e full bath and utility sink, office to bedroom, add closet, convert partial laundry into sitting room/laundry.Details
ground fl remodel. convert e library into family room w e full bath and utility sink, office to bedroom, add closet, convert partial laundry into sitting room/laundry. | $45,000 |
| Dec 7, 2023 | Completed final sign-off Nov 2025 | 2 Dawnview Wy | existing rear wood deck to be extended at second floor.Details
existing rear wood deck to be extended at second floor. | $8,000 | |
| Sep 26, 2023 | Never finaled issued Sep 2023, no final | 1077 Fell St | Velox Construction Inc/Velox Des & Const | revision to 202306099711. upgrade structural under dining rm & bath. replac floor joists. our new footingDetails
revision to 202306099711. upgrade structural under dining rm & bath. replac floor joists. our new footing | $15,000 |
| Sep 22, 2023 | Completed final sign-off Mar 2026 | 2430 Scott St | Bilt Rite Inc | g/f: expand (e) bonus rm into (e) garage. remodel (e) bathroom. 1st/f: relocate (e) entry door to enclose (e) porch, remodel (e) kitchen. new bathroom. 2nd/f: remodel (e) bathroom 2, e bedroom 2, bathroom 3, & master bathroomDetails
g/f: expand (e) bonus rm into (e) garage. remodel (e) bathroom. 1st/f: relocate (e) entry door to enclose (e) porch, remodel (e) kitchen. new bathroom. 2nd/f: remodel (e) bathroom 2, e bedroom 2, bathroom 3, & master bathroom | $80,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 131 Caselli Av | Olive Construction Corp | replace (e) rutted hood/tile/stucco stair @ front entry in like kind. replace misc rotted framing @ bldg wall adjacent to stair. replace (e) landing finish above garage w/ new landing finish in like kind. all work within property line not public rowDetails
replace (e) rutted hood/tile/stucco stair @ front entry in like kind. replace misc rotted framing @ bldg wall adjacent to stair. replace (e) landing finish above garage w/ new landing finish in like kind. all work within property line not public row | $18,000 |
| Jul 12, 2023 | Completed final sign-off Dec 2023 | 119 Crescent Av | Fertiz Construction Inc. | amend to pa 202211146458 - add retaining wall next to the neighbor. replce reset of the floor framing on room addition.Details
amend to pa 202211146458 - add retaining wall next to the neighbor. replce reset of the floor framing on room addition. | $15,000 |
| Jul 6, 2023 | Never finaled issued Jul 2023, no final | 23 Kenwood Wy | facade renovation, no structural work. replace garage door, replace portion of wood siding to stucco, window replacement at front. rear deck work is under separate permit 202208120429Details
facade renovation, no structural work. replace garage door, replace portion of wood siding to stucco, window replacement at front. rear deck work is under separate permit 202208120429 | $5,000 | |
| May 24, 2023 | Expired or cancelled cancelled Jan 2026 | 1157 Vallejo St | to remove small roof deck. revision to 202301270898. a service landing/stairs for roof maintenance onlyDetails
to remove small roof deck. revision to 202301270898. a service landing/stairs for roof maintenance only | $1,000 | |
| May 11, 2023 | Completed final sign-off Oct 2024 | 520 Foerster St | Mission Home Remodeling Inc | revision to 202007130070. revised structural details for roof framingDetails
revision to 202007130070. revised structural details for roof framing | $15,000 |
| Apr 26, 2023 | Completed final sign-off Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | convert (e) undocumented ground floor unit to become studio 1 bath adu. reference soft story work under separate permit #202210144345Details
convert (e) undocumented ground floor unit to become studio 1 bath adu. reference soft story work under separate permit #202210144345 | $138,000 |
| Apr 24, 2023 | Completed final sign-off Feb 2024 | 550 12th Av | Aurora Builders | revision to 202211186851. structural plan s2 replace footing and post under grider @ 3 locations @ 1st flDetails
revision to 202211186851. structural plan s2 replace footing and post under grider @ 3 locations @ 1st fl | $3,500 |
| Feb 6, 2023 | Completed final sign-off May 2026 | 642 Washington St | Radiant Construction Company | base building improvement of interior basement, grnd & 2nd. demolition of e non bearing wall(int wall) e restrooms, e stair and e mezz floor, new construction non bearing int partitions, ext modification, new accessible restrms, new stairs, (n) incline ladder. new drop down ladder at fire escape.Details
base building improvement of interior basement, grnd & 2nd. demolition of e non bearing wall(int wall) e restrooms, e stair and e mezz floor, new construction non bearing int partitions, ext modification, new accessible restrms, new stairs, (n) incline ladder. new drop down ladder at fire escape. | $653,776 |
| Jan 27, 2023 | Completed final sign-off Jul 2023 | 1157 Vallejo St | Barker-O'donoghue Master Bldrs | revision to 201410038089. new floating interior stairsDetails
revision to 201410038089. new floating interior stairs | |
| Nov 7, 2022 | Never finaled issued May 2023, no final | 133 Venus St | Culligan Construction | 1st floor: remodel (e) rec room, bath, garage, add 2 bedrooms & add new 1 bath. 2nd floor: remodel (e) kitchen, dining, and 2 baths. replace (e) front & rear windows & rear siding.Details
1st floor: remodel (e) rec room, bath, garage, add 2 bedrooms & add new 1 bath. 2nd floor: remodel (e) kitchen, dining, and 2 baths. replace (e) front & rear windows & rear siding. | $50,000 |
| Oct 14, 2022 | Completed final sign-off Dec 2025 | 1756 Broadway | Pattani Construction Co Inc | per ab-094 voluntary seismic upgrade of soft story. front buildingDetails
per ab-094 voluntary seismic upgrade of soft story. front building | $10,000 |
| Aug 11, 2022 | Completed final sign-off Jun 2023 | 99 Mountain Spring Av | Ramos General Construction Inc. | repair (e) front deck due to dry rot, replace wood guard rail w/cables. not for full demo of existing deckDetails
repair (e) front deck due to dry rot, replace wood guard rail w/cables. not for full demo of existing deck | $5,000 |
| Aug 10, 2022 | Completed final sign-off Apr 2023 | 14 Santa Clara Av | Bashland Inc. Dba Bashland Builders | exterior work: replace sash selected windows in kind. interior: replace main bath fixtures in kind. relocate attic ceiling access.Details
exterior work: replace sash selected windows in kind. interior: replace main bath fixtures in kind. relocate attic ceiling access. | $38,000 |
| Aug 4, 2022 | Completed final sign-off Feb 2023 | 3668 24th St | Spryscapes Const Inc. | in-kind replacement of (e) deck to dry rot @ 4th fl.Details
in-kind replacement of (e) deck to dry rot @ 4th fl. | $10,000 |
| Aug 4, 2022 | Completed final sign-off Feb 2023 | 3670 24th St | Spryscapes Const Inc. | in-kind replacement of (e) deck due to dry rot @ 3rd fl.Details
in-kind replacement of (e) deck due to dry rot @ 3rd fl. | $10,000 |
| Jul 20, 2022 | Completed final sign-off Aug 2023 | 3624 Webster St | Prime Construction & Renovation Inc. | g/f: expand (e) social hall at ground floor within (e) building footprint. convert non-conditioned space to conditined. add new full bathroom & new exterior doors to new patio.Details
g/f: expand (e) social hall at ground floor within (e) building footprint. convert non-conditioned space to conditined. add new full bathroom & new exterior doors to new patio. | $125,000 |
| Jul 7, 2022 | Expired or cancelled expired Oct 2025 | 20 Gloria Ct | Jose Martinez | interior scope: proposed family rm, (n) bathroom & laundry area, led light fixture @ garage level. re-build interior stair. (n) rear grade level deck.Details
interior scope: proposed family rm, (n) bathroom & laundry area, led light fixture @ garage level. re-build interior stair. (n) rear grade level deck. | $28,000 |
| Jun 27, 2022 | Completed final sign-off Apr 2023 | 1608 Fulton St | M & L Construction | (e) rear staircase to be replaced due to dry rot.Details
(e) rear staircase to be replaced due to dry rot. | $10,000 |
| Jun 21, 2022 | Completed final sign-off Apr 2023 | 760 Church St | C H Burnham Inc | revision to 202203079364. (e) post at garage to be removed, 2 posts. reinforce beams, sister w/ (e) beams. replace (e) beam.Details
revision to 202203079364. (e) post at garage to be removed, 2 posts. reinforce beams, sister w/ (e) beams. replace (e) beam. | $5,000 |
| Jun 10, 2022 | Completed final sign-off Jan 2023 | 21 Douglass St | new deck & stairs from house to rear yard.Details
new deck & stairs from house to rear yard. | $10,000 | |
| Jun 7, 2022 | Completed final sign-off Sep 2022 | 26 Genebern Wy | Aya Homes Llc | existing front staircase replacement in kind due to dry rot.(wood replacement)Details
existing front staircase replacement in kind due to dry rot.(wood replacement) | $5,000 |
| May 26, 2022 | Never finaled issued Apr 2023, no final | 75 Jersey St | Bay Home Remodeling | bathroom remodel. 2 new skylights. kitchen remodel. 3 window replacementDetails
bathroom remodel. 2 new skylights. kitchen remodel. 3 window replacement | $20,000 |
| May 10, 2022 | Expired or cancelled cancelled Jan 2026 | 76 Homestead St | 292sf infill addition on basement level beneath (e) entry deck. r/r (e) entry deck, stairs and railing with new waterproof roof deck under.Details
292sf infill addition on basement level beneath (e) entry deck. r/r (e) entry deck, stairs and railing with new waterproof roof deck under. | $20,000 | |
| Apr 21, 2022 | Completed final sign-off Dec 2022 | 46 Caselli Av | Olmec Builders Inc | to comply with physical insp. report cc-8523. response to sfdbi condo physical inspection comments (dated 08/31/2021) item 3 = engineering to verify the removal of the post in the garage and adequate capacity or reinforcement for rthe center beam with typical floor loads. no architectural changes.Details
to comply with physical insp. report cc-8523. response to sfdbi condo physical inspection comments (dated 08/31/2021) item 3 = engineering to verify the removal of the post in the garage and adequate capacity or reinforcement for rthe center beam with typical floor loads. no architectural changes. | $4,000 |
| Apr 7, 2022 | Completed final sign-off Oct 2024 | 4338 25th St | Seapoint Construction | replace rear decks on 1st and 2nd floor. kitchen and existing bath renovation.Details
replace rear decks on 1st and 2nd floor. kitchen and existing bath renovation. | $45,000 |
| Apr 5, 2022 | Completed final sign-off Mar 2023 | 3624 Webster St | Prime Construction & Renovation Inc. | remodel and partially reconfigure existing interior space at 1/f. add new half bath, replacing (e) f.a.u w/ heat pump hvac system for all conditioned spaces. no work to front facade - any work to front windows will be under seperate permit.Details
remodel and partially reconfigure existing interior space at 1/f. add new half bath, replacing (e) f.a.u w/ heat pump hvac system for all conditioned spaces. no work to front facade - any work to front windows will be under seperate permit. | $300,000 |
| Mar 31, 2022 | Completed final sign-off Nov 2022 | 430 Folsom St | R 3 Builders Inc. | revision to permit 202102195021. add build up slab and toppings slab to march existing door thresholds futures tenant improvement under seperate permit application.Details
revision to permit 202102195021. add build up slab and toppings slab to march existing door thresholds futures tenant improvement under seperate permit application. | $10,000 |
| Feb 10, 2022 | Completed final sign-off Jan 2024 | 844 Clayton St | Andrew Gallagher Construction | revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bathDetails
revision to pa 202104208922 1/f interior remodel: remove wall b/t hall and media room, remove laundry closet, show elec and lighting layout in hall, media rm and office. revision to pa 202111222912 in-kind kitchen remodel: reconfigure kitchen layout, remove wall b/t dining and kitchen, new half bath | $35,231 |
| Feb 2, 2022 | Completed final sign-off Apr 2022 | 900 Cole St | Sage Construction Services | (e) 10x10in post to be repaired. in-kind repair. all structural.Details
(e) 10x10in post to be repaired. in-kind repair. all structural. | $1,000 |
| Jan 14, 2022 | Completed final sign-off Apr 2023 | 3085 21st St | Arroyo Realty & Development Llc | minor structural upgrade associated with approved t.i# 2021-0701-3629. (n) work includes installing (n) steel brace between grid lines 2 and 3. also includes changes to layout of restroom, janitor room and break room.Details
minor structural upgrade associated with approved t.i# 2021-0701-3629. (n) work includes installing (n) steel brace between grid lines 2 and 3. also includes changes to layout of restroom, janitor room and break room. | $17,750 |
| Dec 20, 2021 | Completed final sign-off Apr 2022 | 1356 Page St | D3 Construction | new foundation replacement adjacent to the ground floor level tradesman corridor. voluntary aeismic strengthening of the garage space area with new plywood shear walls.Details
new foundation replacement adjacent to the ground floor level tradesman corridor. voluntary aeismic strengthening of the garage space area with new plywood shear walls. | $15,000 |
| Dec 20, 2021 | Completed final sign-off Jun 2023 | 1128 Harrison St | convert (e0 study to new bedroom, new hallway and new door to (e) bedroom.Details
convert (e0 study to new bedroom, new hallway and new door to (e) bedroom. | $5,000 | |
| Dec 10, 2021 | Completed final sign-off May 2023 | 580 Mississippi St | Hong Shink Construction | 1/f: renovation of existing bedroom and bathroom. repair rear yard deck in kind. 2/f: kitchen and bath renovation. enclose (e) interior lighwell. redesign of (e) interior stairDetails
1/f: renovation of existing bedroom and bathroom. repair rear yard deck in kind. 2/f: kitchen and bath renovation. enclose (e) interior lighwell. redesign of (e) interior stair | $200,000 |
| Dec 3, 2021 | Completed final sign-off Jun 2022 | 280 Granada Av | M & L Construction | existing front balconies (2) to be replaced due to dry-rot in-kind.wood guardrail to match existing.no changes to facade.Details
existing front balconies (2) to be replaced due to dry-rot in-kind.wood guardrail to match existing.no changes to facade. | $15,000 |
| Dec 3, 2021 | Completed final sign-off May 2022 | 234 Gates St | Heirloom Builders Inc | replace front exterior entry stair in-kind.Details
replace front exterior entry stair in-kind. | $5,000 |
| Nov 16, 2021 | Completed final sign-off Apr 2023 | 28 Atalaya Tr | C & M Woodworking Inc Dba C & M General, Doran Construction & Design | convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street.Details
convert (e) 1st fl storage space to (n) habitable space connected to (e) 2nd fl via (n) internal stair. renovate & reconfigure 2nd fl bathroom. no work visible from street. | $100,000 |
| Nov 5, 2021 | Completed final sign-off Mar 2022 | 2860 Sacramento St | D3 Construction | interior improvements on the 3rd fl includes a new non-structural partitions, new door, hardware, new lighting and ceiling, new finishes, new flooring, new plumbing, fixture & refinemant of a structural workDetails
interior improvements on the 3rd fl includes a new non-structural partitions, new door, hardware, new lighting and ceiling, new finishes, new flooring, new plumbing, fixture & refinemant of a structural work | $80,000 |
| Oct 20, 2021 | Completed final sign-off Nov 2022 | 830 41st Av | Northbay Home Construction Solutions Inc | remodel (e) second fl bathroom.Details
remodel (e) second fl bathroom. | $18,000 |
| Oct 7, 2021 | Completed final sign-off Jan 2024 | 3970 Clay St | O'shaughnessy Construction | scope of work on 1st fl only - convert (e) storage space on 1st fl (ground floor) into habitable rooms including (n) bedroom, (n) bath, (n) wine room, (n) great room, (n) 1/2 bathroom and (n) laundry roomm. required excavation to be cu yds (822 sf x 1.5' deep)Details
scope of work on 1st fl only - convert (e) storage space on 1st fl (ground floor) into habitable rooms including (n) bedroom, (n) bath, (n) wine room, (n) great room, (n) 1/2 bathroom and (n) laundry roomm. required excavation to be cu yds (822 sf x 1.5' deep) | $190,200 |
| Oct 5, 2021 | Completed final sign-off Apr 2023 | 258 Hartford St | Top To Bottom Renovation | kitchen remodel (top unit), remove portion of half height wall between dining room and kitchen, window replacement (2 side windows - not visible from street). new skylight.Details
kitchen remodel (top unit), remove portion of half height wall between dining room and kitchen, window replacement (2 side windows - not visible from street). new skylight. | $55,000 |
| Sep 30, 2021 | Completed final sign-off Jul 2022 | 451 Guerrero St | D3 Construction | voluntary soft story retrofit.Details
voluntary soft story retrofit. | $100,000 |
| Sep 22, 2021 | Completed final sign-off Apr 2023 | 760 Church St | C H Burnham Inc | unit #2: new office. new door to rear yard.Details
unit #2: new office. new door to rear yard. | $15,000 |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 649 Central Av | Prime Construction & Renovation Inc. | revision to pa# 202012070371. change beam location.Details
revision to pa# 202012070371. change beam location. | |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 651 Central Av | Prime Construction & Renovation Inc. | revision to pa# 202105250941. renovation to kitchen & bathrooom at 3rd fl. remove (e) non-bearing walls. add plywood sheathed wall.Details
revision to pa# 202105250941. renovation to kitchen & bathrooom at 3rd fl. remove (e) non-bearing walls. add plywood sheathed wall. | $5,000 |
| Aug 24, 2021 | Completed final sign-off Oct 2022 | 672 Teresita Bl | Jeurieb Construction | replace extg windows to sliding doors at 2nd floor. new rear deck at 7'-0" above ground.Details
replace extg windows to sliding doors at 2nd floor. new rear deck at 7'-0" above ground. | $15,000 |
| Aug 5, 2021 | Never finaled issued Jul 2022, no final | 1073 Church St | Prosper Construction Dev Inc. | demolish (e) deck between the main dwelling & garage, bridge the main dwelling & garage wi/ (n) deck. (n) decking over the garage. (n) 2-story deck & balcony replacing the (e).Details
demolish (e) deck between the main dwelling & garage, bridge the main dwelling & garage wi/ (n) deck. (n) decking over the garage. (n) 2-story deck & balcony replacing the (e). | $15,000 |
| Aug 4, 2021 | Completed final sign-off Dec 2024 | 1133 South Van Ness Av | S L M Development Inc. | change of use from group i-2 nursing home non-ambulatory to group e, day care facility; painting, general clean up, furniture; accessible entrance upgradeDetails
change of use from group i-2 nursing home non-ambulatory to group e, day care facility; painting, general clean up, furniture; accessible entrance upgrade | $30,000 |
| Jul 20, 2021 | Completed final sign-off Nov 2023 | 930 Minnesota St | Colindres & Associates | additional scope to current permit pa#2021-0401-7717 of (e) 3 story residence replacing (e) perimeter foundation and providing for a minimum of floor to ceiling 8"6' ht at ground floor conditioned areas, no changes to upper unit, this is a remains a non - sprinklered structureDetails
additional scope to current permit pa#2021-0401-7717 of (e) 3 story residence replacing (e) perimeter foundation and providing for a minimum of floor to ceiling 8"6' ht at ground floor conditioned areas, no changes to upper unit, this is a remains a non - sprinklered structure | $35,000 |
| Jul 14, 2021 | Never finaled issued Nov 2021, no final | 544 Clayton St | Ewen Utting Inc. | unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only.Details
unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only. | |
| Jul 12, 2021 | Expired or cancelled cancelled Jan 2026 | 83 Madrone Av | (e) wood retaining wall at rear property line to be replacedDetails
(e) wood retaining wall at rear property line to be replaced | $5,000 | |
| Jun 28, 2021 | Expired or cancelled expired Jun 2024 | 544 Clayton St | Ewen Utting Inc. | revision to pa #201709158769. foundation field revision.Details
revision to pa #201709158769. foundation field revision. | |
| Jun 24, 2021 | Never finaled issued Jul 2023, no final | 559 Jersey St | Turley Construction | addition of (n) 3rd flr w/ (n) roof deck to an (e)single fam home. (n) third floor includes (n) north elevation windows, (n) south elevation windows, (n) west elevation windows, (n) deck, (n) staircase from (e) main level to the (n) 3rd level and (n) staircase from (n) 3rd flr to (n) roof top deck.Details
addition of (n) 3rd flr w/ (n) roof deck to an (e)single fam home. (n) third floor includes (n) north elevation windows, (n) south elevation windows, (n) west elevation windows, (n) deck, (n) staircase from (e) main level to the (n) 3rd level and (n) staircase from (n) 3rd flr to (n) roof top deck. | $300,000 |
| Jun 9, 2021 | Completed final sign-off Feb 2022 | 2856 Sacramento St | D3 Construction | 1st flr- (n) structural posts, (n) non-structural partitions, (n) door & hardware, (n) lighting & ceilings, (n) finishes, (n) flooring, (n) plumbing fixtures and (n) funiture.Details
1st flr- (n) structural posts, (n) non-structural partitions, (n) door & hardware, (n) lighting & ceilings, (n) finishes, (n) flooring, (n) plumbing fixtures and (n) funiture. | $10,000 |
| Jun 4, 2021 | Expired or cancelled cancelled Jan 2026 | 742 San Bruno Av | conversion of (e) garage to a new residential unit. modify front and rar elevations to provide access and egress to new unit. extend existing rear deck.Details
conversion of (e) garage to a new residential unit. modify front and rar elevations to provide access and egress to new unit. extend existing rear deck. | $125,000 | |
| Jun 4, 2021 | Never finaled filed Jun 2021, never issued | 2421 Polk St | new rear wood deck at 10'-1" from ground.Details
new rear wood deck at 10'-1" from ground. | $10,000 |