O Donoghue Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Jun 2026
- Last 24 months
- 14 permits filed
113 permits since 2000: 95 completed, 4 in progress, 13 never finaled, 1 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 113.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2026 | In progress issued Jun 2026 | 786 Colby St | remove approv 80 sq. ft. stucco. replace damaged sheeting (3/4" plywood shtg) & moistures membrance. apply new stucco to match existing.Details
remove approv 80 sq. ft. stucco. replace damaged sheeting (3/4" plywood shtg) & moistures membrance. apply new stucco to match existing. | $12,000 |
| Apr 24, 2026 | Completed final sign-off Jun 2026 | 755 Duncan St | revision to 202303103512. add new roof deck at e roof. provide new operable skylight for roof access. provide new interior from 3rd fl to roof deck. provide new 30' high 1 hr rated parapet adjacent to skylight opening for fire protection.Details
revision to 202303103512. add new roof deck at e roof. provide new operable skylight for roof access. provide new interior from 3rd fl to roof deck. provide new 30' high 1 hr rated parapet adjacent to skylight opening for fire protection. | $12,500 |
| Mar 19, 2026 | In progress issued Mar 2026 | 311 Valencia St | remove and replace damaged drywall on (e) walls in commercial space. no structural changes. no change to layout, use or occupancy.Details
remove and replace damaged drywall on (e) walls in commercial space. no structural changes. no change to layout, use or occupancy. | $4,800 |
| Feb 10, 2026 | Completed final sign-off Sep 2026 | 444 04th Av | to comply with nov 202538488- remove sheetrock at the main level as required to expose work for inspection. expose or resume (n) structural members as required for inspection. obtain permits and complete requiredinsepctions for (e) decks, stairs, concerte work. revision 202407106218 to remove (e)Details
to comply with nov 202538488- remove sheetrock at the main level as required to expose work for inspection. expose or resume (n) structural members as required for inspection. obtain permits and complete requiredinsepctions for (e) decks, stairs, concerte work. revision 202407106218 to remove (e) | $50,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 755 Duncan St | provide excavation sequence and shoring to accommodate foundation installation. bpa#: 202303103512.Details
provide excavation sequence and shoring to accommodate foundation installation. bpa#: 202303103512. | $20,000 |
| Aug 6, 2025 | Completed final sign-off Oct 2025 | 720 Victoria St | convert 1 ground floor bedroom into a junior adu within the (e) structure per ca govt code section 65852.2(e).Details
convert 1 ground floor bedroom into a junior adu within the (e) structure per ca govt code section 65852.2(e). | $15,000 |
| Jul 1, 2025 | Completed final sign-off Nov 2025 | 20 San Pablo Av | remodel kitchen in kind. no layout changes. chaning countertops, cabinets, floor & backsplash. roughly 170 sq ft.Details
remodel kitchen in kind. no layout changes. chaning countertops, cabinets, floor & backsplash. roughly 170 sq ft. | $24,000 |
| May 29, 2025 | Completed final sign-off Oct 2025 | 720 Victoria St | proposed interior remodel to include the addition of one bedroom, one family room within the existing structureDetails
proposed interior remodel to include the addition of one bedroom, one family room within the existing structure | $30,000 |
| May 7, 2025 | Completed final sign-off Sep 2025 | 14 Hill St | fire damage repair at 3rd fl to comply w/ nov 202535688: stair landing & stairs. damage repair in-kindDetails
fire damage repair at 3rd fl to comply w/ nov 202535688: stair landing & stairs. damage repair in-kind | $10,000 |
| May 1, 2025 | In progress issued May 2026 | 1057 Pacific Av | vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit.Details
vertical and horizontal addition and adu addition to existing 2 unit building. create adu on ground flr behind garage per local program section 207.1. creat new 4th flr and roof deck attached to upper unit (1057). sprinkler entire building to nfpa 13 full, under separate permit. | $915,000 |
| May 1, 2025 | Completed final sign-off Oct 2025 | 720 Victoria St | foundation replacementDetails
foundation replacement | $60,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 661 Miramar Av | replace in kind (10) windows at west side + rear. (6) windows to be replace on west side + (4) windows at rear or building. no alterations to size or location. max ufactor 0.3Details
replace in kind (10) windows at west side + rear. (6) windows to be replace on west side + (4) windows at rear or building. no alterations to size or location. max ufactor 0.3 | $25,000 |
| Dec 2, 2024 | Completed final sign-off Feb 2025 | 4050 Ulloa St | install new cabinets in kitchen, new countertop and appliances, sink, stove, ref in same place. remodel existing bath and replace fixtures and tile. new electrical throughout. no wall demolition or construction.Details
install new cabinets in kitchen, new countertop and appliances, sink, stove, ref in same place. remodel existing bath and replace fixtures and tile. new electrical throughout. no wall demolition or construction. | $25,000 |
| Oct 15, 2024 | Completed final sign-off Nov 2024 | 4234 24th St | legalize kitchenette that was installed in lower unit lower floor. reconfigure upper unit kitchen layout.Details
legalize kitchenette that was installed in lower unit lower floor. reconfigure upper unit kitchen layout. | $4,000 |
| Aug 21, 2024 | Completed final sign-off Jan 2025 | 160 Cresta Vista Dr | revision to pa # 2021-1103-1677 structural memebers removed from previously approved solariumDetails
revision to pa # 2021-1103-1677 structural memebers removed from previously approved solarium | |
| Jul 17, 2024 | Completed final sign-off Dec 2025 | 20 San Pablo Av | proposed conversion of crawl space to accomdate (2) bedrooms, new offices (2) new bathrooms, all work to be performed within the (e) boundary of the buildingDetails
proposed conversion of crawl space to accomdate (2) bedrooms, new offices (2) new bathrooms, all work to be performed within the (e) boundary of the building | $185,000 |
| Jun 26, 2024 | Completed final sign-off Jul 2024 | 611 Minna St | to obtain final inspection for work apprvoed under 201709148353. all work is complete and all work is performed under 201806152073Details
to obtain final inspection for work apprvoed under 201709148353. all work is complete and all work is performed under 201806152073 | |
| Jun 14, 2024 | Completed final sign-off Jun 2024 | 4234 24th St | as built changes to pa 201909262861 eliminate off-set walls @ below grade patio; reduce size unit 1/bed 2; alocohol fuel fire place unit 1; new bathroom unit 2Details
as built changes to pa 201909262861 eliminate off-set walls @ below grade patio; reduce size unit 1/bed 2; alocohol fuel fire place unit 1; new bathroom unit 2 | $20,000 |
| May 1, 2024 | Completed final sign-off Jun 2025 | 822 Union St | relocate kitchen & laundry. add one new bathroom & remodel (e) bathroom. replace (e) sheetrock with new. all work at 2nd flDetails
relocate kitchen & laundry. add one new bathroom & remodel (e) bathroom. replace (e) sheetrock with new. all work at 2nd fl | $120,000 |
| Apr 18, 2024 | Completed final sign-off Jun 2025 | 824 Union St | relocate kitchen, laundry, add 1 new bathroom. remodel (e) bathroom & replace (e) sheet rock w/ new. all work on 3/f.Details
relocate kitchen, laundry, add 1 new bathroom. remodel (e) bathroom & replace (e) sheet rock w/ new. all work on 3/f. | $140,000 |
| Nov 29, 2023 | Completed final sign-off Dec 2023 | 2121 Mason St | add new shower and sink at basement level for 2121aDetails
add new shower and sink at basement level for 2121a | $20,000 |
| Nov 29, 2023 | Completed final sign-off Dec 2023 | 4 Newell St | to add new shower and sink @ basement level.Details
to add new shower and sink @ basement level. | $20,000 |
| Nov 21, 2023 | Completed final sign-off May 2025 | 563 44th Av | revision under pa #202308154503: structural revision to foundation and framing to acommodate field identified condition. new lower slabDetails
revision under pa #202308154503: structural revision to foundation and framing to acommodate field identified condition. new lower slab | $8,000 |
| Aug 15, 2023 | Completed final sign-off Nov 2025 | 563 44th Av | relocate 2 (e) bathroom, convert (e) media room to bedroom & install kitchenette at g/f. remodel (e) kitchen, bathroom. construct 1 bathroom & replace sheetrock w/ new at 2/f.Details
relocate 2 (e) bathroom, convert (e) media room to bedroom & install kitchenette at g/f. remodel (e) kitchen, bathroom. construct 1 bathroom & replace sheetrock w/ new at 2/f. | $362,000 |
| May 16, 2023 | Completed final sign-off Nov 2025 | 79 Melrose Av | new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unitDetails
new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unit | $117,100 |
| May 1, 2023 | Completed final sign-off Jun 2024 | 4238 24th St | foundation replacement at rear cottage building. new 42" high guardrail, repair damaged lumber.Details
foundation replacement at rear cottage building. new 42" high guardrail, repair damaged lumber. | $110,000 |
| Apr 6, 2023 | Never finaled issued Jul 2023, no final | 55 Santa Monica Wy | adding a new elevator to existing building through basement to 2nd flr.Details
adding a new elevator to existing building through basement to 2nd flr. | $200,000 |
| Mar 10, 2023 | Completed final sign-off Jun 2026 | 755 Duncan St | proposed horizontal & vertical addition to expand the existing unit & add one additional adu unitDetails
proposed horizontal & vertical addition to expand the existing unit & add one additional adu unit | $1,400,000 |
| Mar 6, 2023 | Completed final sign-off Oct 2023 | 600 Vermont St | ada access barrier removal, new ada bathroom, new ada counterDetails
ada access barrier removal, new ada bathroom, new ada counter | $50,000 |
| Jan 9, 2023 | Completed final sign-off Nov 2023 | 733 Castro St | inteiror remodel. 2/f: remodeling the (e) kitchen and half bath. 3/f: remodeling of the (e) common bath, relocation of washer and dryer to 3/f. remodeling of (e) master bath. window replacement throughout.Details
inteiror remodel. 2/f: remodeling the (e) kitchen and half bath. 3/f: remodeling of the (e) common bath, relocation of washer and dryer to 3/f. remodeling of (e) master bath. window replacement throughout. | $90,000 |
| Dec 22, 2021 | Completed final sign-off May 2024 | 4314 17th St | repair of existing retaining wall to comply with nov #202173588.Details
repair of existing retaining wall to comply with nov #202173588. | $150,000 |
| Nov 3, 2021 | Completed final sign-off Jan 2025 | 160 Cresta Vista Dr | horizontal & vertical addition to add a new story below the (e) lower floor & extend the building into the rear yard at all levels.Details
horizontal & vertical addition to add a new story below the (e) lower floor & extend the building into the rear yard at all levels. | $650,000 |
| May 26, 2021 | Never finaled issued Jan 2022, no final | 2233 Powell St | emergency repair of fire damaged building to (partially) comply with nov 202047402. maher not reqDetails
emergency repair of fire damaged building to (partially) comply with nov 202047402. maher not req | $30,000 |
| Jan 27, 2021 | Completed final sign-off Aug 2024 | 1485 20th Av | interior remodel to 2nd & 3rd floor of (2) (e) units. (adu addition & seismic retrofit under separate permit)Details
interior remodel to 2nd & 3rd floor of (2) (e) units. (adu addition & seismic retrofit under separate permit) | $500,000 |
| Nov 25, 2020 | Completed final sign-off Aug 2024 | 1483 20th Av | proposed horizontal addition to main structural building to develop two accessory dwelling. remodel of 2 (e) dwelling units.Details
proposed horizontal addition to main structural building to develop two accessory dwelling. remodel of 2 (e) dwelling units. | $25,000 |
| Oct 15, 2020 | Completed final sign-off Jun 2022 | 1351 Mason St | revise bpa # 201709067080. modify structural plans.Details
revise bpa # 201709067080. modify structural plans. | |
| Oct 24, 2019 | Never finaled issued Nov 2019, no final | 301 Valencia St | mechanical, electrical, plumbing and fire sprinkler modifications by design build contractor. electrical scope limited to providing power to address the ada accessible upgrades. ref pa 2017-0912-7848 & 2017-0912-7842Details
mechanical, electrical, plumbing and fire sprinkler modifications by design build contractor. electrical scope limited to providing power to address the ada accessible upgrades. ref pa 2017-0912-7848 & 2017-0912-7842 | |
| Oct 17, 2019 | Completed final sign-off May 2022 | 301 Valencia St | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref pa 2017-0912-7842 & 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4.Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref pa 2017-0912-7842 & 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. | $769,358 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 301 Valencia St | commercial: soft story upgrades to (e) historic building ada upgrades to (e) restrooms to full compliance. ref pa 2017-0912-7842 and 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
commercial: soft story upgrades to (e) historic building ada upgrades to (e) restrooms to full compliance. ref pa 2017-0912-7842 and 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 26, 2019 | Completed final sign-off Oct 2022 | 583 Clipper St | new deck & stair @ rear to serve 2nd floor. new sliding gladd door at deck. new windows at rear side east wallDetails
new deck & stair @ rear to serve 2nd floor. new sliding gladd door at deck. new windows at rear side east wall | $45,000 |
| Sep 26, 2019 | Completed final sign-off Jul 2024 | 4234 24th St | to erect a type v-b, 4-story with one basement two family dwelling.Details
to erect a type v-b, 4-story with one basement two family dwelling. | $850,000 |
| Jul 15, 2019 | Completed final sign-off Nov 2019 | 355 Lansdale Av | interior remodel at 355 lansdale dwelling units, addition of a bath, bath #3 at the (e) 2nd fl. bath #1, (e) bath #1 window to be relaced in new configurationDetails
interior remodel at 355 lansdale dwelling units, addition of a bath, bath #3 at the (e) 2nd fl. bath #1, (e) bath #1 window to be relaced in new configuration | $19,000 |
| May 30, 2019 | Completed final sign-off Dec 2019 | 55 Terrace Dr | interior remodel of (e) 1st fl. to include a new half bath and a new exterior door on the west elevattion.Details
interior remodel of (e) 1st fl. to include a new half bath and a new exterior door on the west elevattion. | $5,000 |
| Apr 4, 2019 | Completed final sign-off Sep 2022 | 609 San Bruno Av | vertical addition. 3/fl addition with deck, convert some existing garage space to living area. replace front window with custom to match, widen garage door,seismic upgrade, sprinklers. remodeling of existing 2/fl home including kitchen and new bathroom.Details
vertical addition. 3/fl addition with deck, convert some existing garage space to living area. replace front window with custom to match, widen garage door,seismic upgrade, sprinklers. remodeling of existing 2/fl home including kitchen and new bathroom. | $800,000 |
| Mar 21, 2019 | Completed final sign-off Nov 2019 | 357 Lansdale Av | add units per ord 95-17. accessory dwelling unit addition at existing front crawlspace.Details
add units per ord 95-17. accessory dwelling unit addition at existing front crawlspace. | $100,000 |
| Feb 25, 2019 | Completed final sign-off Jul 2019 | 2 Nahua Av | repair dryrot at front stairway walls, remove some stucco, repair and patch. remove kitchen cabinets and replace. remove tile and fixtures in bathroom. replace with new. no electrical and plumbing and structural work. approximately 10 sqaure feet of stucco to be removed.Details
repair dryrot at front stairway walls, remove some stucco, repair and patch. remove kitchen cabinets and replace. remove tile and fixtures in bathroom. replace with new. no electrical and plumbing and structural work. approximately 10 sqaure feet of stucco to be removed. | $12,000 |
| Jan 25, 2019 | Completed final sign-off Apr 2019 | 2528 Ocean Av | tenant improvement to convert e salon/office to yoga studio including ada upgrade 2 e restrooms, new showers, treatment room. new office, partial ada upgrade of e entry; lighting t24 onlyDetails
tenant improvement to convert e salon/office to yoga studio including ada upgrade 2 e restrooms, new showers, treatment room. new office, partial ada upgrade of e entry; lighting t24 only | $128,800 |
| Dec 7, 2018 | Completed final sign-off Apr 2019 | 2528 Ocean Av | demo of interior non bearing partitions, remove (e) finish flooring, light fixtures, and non structural soffits exploratory demo of potential load bearing walls for analysis, tenant improvement uder sep permit. ab-017.Details
demo of interior non bearing partitions, remove (e) finish flooring, light fixtures, and non structural soffits exploratory demo of potential load bearing walls for analysis, tenant improvement uder sep permit. ab-017. | $5,000 |
| Aug 27, 2018 | Completed final sign-off May 2023 | 1950 Eddy St | 1st floor: seismic retrofit. foundation placementDetails
1st floor: seismic retrofit. foundation placement | $150,000 |
| Jun 29, 2018 | Completed final sign-off Nov 2020 | 198 Cresta Vista Dr | voluntary ground floor seismic upgrade per sfebc chapter 4d:2016 cebc appendix a-4 basement shear of 100% of value required by current bldg code.Details
voluntary ground floor seismic upgrade per sfebc chapter 4d:2016 cebc appendix a-4 basement shear of 100% of value required by current bldg code. | $80,000 |
| Jun 15, 2018 | Completed final sign-off Jul 2024 | 611 Minna St | adding (2) dwelling units at the basement level per ordinance #162-16. ** maher n/a**Details
adding (2) dwelling units at the basement level per ordinance #162-16. ** maher n/a** | $400,000 |
| Jun 5, 2018 | Completed final sign-off Jan 2019 | 907 Innes Av | install fire sprinkler sytem throughout building per nfpa 13r. underground service will be installed under ba # 201805048269. n/a for maher.Details
install fire sprinkler sytem throughout building per nfpa 13r. underground service will be installed under ba # 201805048269. n/a for maher. | $10,000 |
| Mar 30, 2018 | Completed final sign-off Dec 2022 | 36 Cook St | to erect 4 stories, no basement, type v-b, 2 units residential building.Details
to erect 4 stories, no basement, type v-b, 2 units residential building. | $1,000,000 |
| Dec 14, 2017 | Completed final sign-off Mar 2019 | 2448 Clement St | commercial restaurants: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref residential 201708074086.Details
commercial restaurants: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref residential 201708074086. | $3,000 |
| Oct 6, 2017 | Completed final sign-off Jun 2018 | 50 San Rafael Wy | interior renovations to kitchen, 4 bathrooms & bedrooms. in kind replacement (e) windows & entry stair. new study, family room bath & storage at garage level.Details
interior renovations to kitchen, 4 bathrooms & bedrooms. in kind replacement (e) windows & entry stair. new study, family room bath & storage at garage level. | $150,000 |
| Oct 4, 2017 | Completed final sign-off Sep 2022 | 2121 Mason St | renovate (e)(2) bed (2) bath single family home. proposed project to add (1) story & create 2nd unit. comprising of: 1st unit (1)bed/(1.5) bath. 2nd unit (3)bed/(2.5)bath & (1)car parking. increase (e) by (2) bed/(2)bath.Details
renovate (e)(2) bed (2) bath single family home. proposed project to add (1) story & create 2nd unit. comprising of: 1st unit (1)bed/(1.5) bath. 2nd unit (3)bed/(2.5)bath & (1)car parking. increase (e) by (2) bed/(2)bath. | $507,450 |
| Oct 4, 2017 | Completed final sign-off Sep 2022 | 4 Newell St | renovate (e) single family home (2bed/2bath). proposed project is to add (1)story & create 2nd unit. comprising of: unit 1: (1)bed/(1.5)bath, unit 2: (3)bed/(2.5)bath & one car parking.Details
renovate (e) single family home (2bed/2bath). proposed project is to add (1)story & create 2nd unit. comprising of: unit 1: (1)bed/(1.5)bath, unit 2: (3)bed/(2.5)bath & one car parking. | $507,450 |
| Sep 5, 2017 | Completed final sign-off Apr 2024 | 3359 26th St | vertical addition to an (e)structure over basement on a through lot. (3)(n)floors on top of (e)2-story over basement portion facing 26th street;& (4)(n)floors above (e)1-story over basement portion facing capp street. (7)new condominiums will be added to the (e)single dwelling unit over commercial.Details
vertical addition to an (e)structure over basement on a through lot. (3)(n)floors on top of (e)2-story over basement portion facing 26th street;& (4)(n)floors above (e)1-story over basement portion facing capp street. (7)new condominiums will be added to the (e)single dwelling unit over commercial. | $500,000 |
| Aug 7, 2017 | Completed final sign-off Mar 2019 | 390 26th Av | residential: soft story seismic upgrade per sf ord 66-13, sfebc ch 34, cebc app 4. reference commercial under pa201712146465.Details
residential: soft story seismic upgrade per sf ord 66-13, sfebc ch 34, cebc app 4. reference commercial under pa201712146465. | $15,000 |
| Jul 14, 2017 | Completed final sign-off Feb 2019 | 907 Innes Av | erect a three story type five construction two dwelling unit building. maher exempt with letter from health dept.Details
erect a three story type five construction two dwelling unit building. maher exempt with letter from health dept. | $400,000 |
| Jun 28, 2017 | Completed final sign-off Mar 2018 | 1158 Montgomery St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $90,000 |
| Mar 29, 2017 | Completed final sign-off Sep 2018 | 1418 Rhode Island St | soft story to comply with sfbc soft story ord.Details
soft story to comply with sfbc soft story ord. | $175,000 |
| Mar 16, 2017 | Never finaled issued May 2017, no final | 4287 23rd St | add 10' wooden fence surrounding the building lightwell and rear yard, all work to be performed within (e) boundary of the propoerty line. to comply with complaint #201764052Details
add 10' wooden fence surrounding the building lightwell and rear yard, all work to be performed within (e) boundary of the propoerty line. to comply with complaint #201764052 | $10,000 |
| Nov 16, 2016 | Completed final sign-off Sep 2018 | 1418 Rhode Island St | proposed addition of (4) studio units as adu per ord #162-16 @ 1st & 2nd floor. all work to be performed within (e) boundary of the building.Details
proposed addition of (4) studio units as adu per ord #162-16 @ 1st & 2nd floor. all work to be performed within (e) boundary of the building. | $500,000 |
| Jun 28, 2016 | Never finaled issued Jan 2017, no final | 4287 23rd St | proposed interior remodel to 1st flr: (n) wet bar & expanding master bedroom & 2 bathrooms; 2nd floor converting 1 half bath to full bath. all work to be performed within (e) boundary of the building.Details
proposed interior remodel to 1st flr: (n) wet bar & expanding master bedroom & 2 bathrooms; 2nd floor converting 1 half bath to full bath. all work to be performed within (e) boundary of the building. | $90,000 |
| Jun 2, 2016 | Completed final sign-off Oct 2016 | 85 Heather Av | soft story seismic retrofit per sf ordinance 66-13, sf building code chapter 34b & sf admin bulletins 106 & 107, analysis per iebc-a4.Details
soft story seismic retrofit per sf ordinance 66-13, sf building code chapter 34b & sf admin bulletins 106 & 107, analysis per iebc-a4. | $130,000 |
| Jun 2, 2016 | Completed final sign-off Nov 2016 | 220 16th Av | soft story seismic retrofit per sf ordinance 66-13,sf building code chapter 34b and sf admin bulletins 106 & 107, analysis per iebc-a4.Details
soft story seismic retrofit per sf ordinance 66-13,sf building code chapter 34b and sf admin bulletins 106 & 107, analysis per iebc-a4. | $105,000 |
| Apr 7, 2016 | Completed final sign-off Sep 2017 | 2845 Noriega St | interior remodel to 1st floor removing all extg posts; 2nd floor expanding 2 bathrooms and convert 1 half bath to full bath; add new roof deck. all work to be performed within boundary of the bldg.Details
interior remodel to 1st floor removing all extg posts; 2nd floor expanding 2 bathrooms and convert 1 half bath to full bath; add new roof deck. all work to be performed within boundary of the bldg. | $180,000 |
| Apr 6, 2016 | Never finaled issued Apr 2016, no final | 755 Victoria St | reroofingDetails
reroofing | $10,000 |
| Feb 29, 2016 | Completed final sign-off Jan 2017 | 2203 Newcomb Av | request address change from 928 toland street to 2203, 2207, 2211, 2215, 2219, 2223, 2227 and 2231 newcomb avenue (ref 201301248656) n/a maher ord. # 155-13Details
request address change from 928 toland street to 2203, 2207, 2211, 2215, 2219, 2223, 2227 and 2231 newcomb avenue (ref 201301248656) n/a maher ord. # 155-13 | |
| Jan 5, 2016 | Completed final sign-off Jul 2016 | 75 Heather Av | soft story retrofit per sfbc ordinance 66-13 sf bldg code chapter 34b and sf admin. bulletins 106 & 107, 2012 iebc appendix a-4Details
soft story retrofit per sfbc ordinance 66-13 sf bldg code chapter 34b and sf admin. bulletins 106 & 107, 2012 iebc appendix a-4 | $105,000 |
| Aug 18, 2015 | Completed final sign-off Mar 2017 | 1644 Diamond St | to erect 3-story, type5, 1 basement, single family dwelling building.Details
to erect 3-story, type5, 1 basement, single family dwelling building. | $500,000 |
| Jan 23, 2015 | Completed final sign-off Apr 2015 | 3775 16th St | remove illegal small kitchen (sink & cabinet) attached to garage to restore back to original use, no new wall and no existing wall relocation.Details
remove illegal small kitchen (sink & cabinet) attached to garage to restore back to original use, no new wall and no existing wall relocation. | $300 |
| Dec 4, 2014 | Completed final sign-off Nov 2015 | 1 Webster St | major street encroachment for a new infant play yard, sitting area, trellised entry and stroller parking at exsiting ground floor child care center. maher n/a.Details
major street encroachment for a new infant play yard, sitting area, trellised entry and stroller parking at exsiting ground floor child care center. maher n/a. | $93,340 |
| Dec 1, 2014 | Completed final sign-off Apr 2020 | 50 Lucky St | demolish (e) garage/storage.Details
demolish (e) garage/storage. | $10,000 |
| Dec 1, 2014 | Completed final sign-off Feb 2018 | 50 Lucky St | construct (n) 4-story single family dwelling residence.Details
construct (n) 4-story single family dwelling residence. | $800,000 |
| Nov 13, 2014 | Completed final sign-off Apr 2015 | 3775 16th St | remodel kitchen and bathroom- new insulation, drywall; - all fixtures, tub & sink in same location. to comply with cec150.0(k)3 & 5. repair of deck less than 50%Details
remodel kitchen and bathroom- new insulation, drywall; - all fixtures, tub & sink in same location. to comply with cec150.0(k)3 & 5. repair of deck less than 50% | $100,000 |
| Oct 21, 2014 | Completed final sign-off Nov 2015 | 434 Chestnut St | proposed soft story retrofit of garage floor. all within e building envelope. soft story retrofit per sfbc chapter 34bDetails
proposed soft story retrofit of garage floor. all within e building envelope. soft story retrofit per sfbc chapter 34b | $25,000 |
| Oct 21, 2014 | Completed final sign-off May 2015 | 1360 Valencia St | proposed soft story retrofit of ground fl at 1360 valencia street. all within (e) building boundary. soft story retrofit per sfbc chapter 34bDetails
proposed soft story retrofit of ground fl at 1360 valencia street. all within (e) building boundary. soft story retrofit per sfbc chapter 34b | $25,000 |
| May 8, 2014 | Completed final sign-off Jan 2017 | 1501 Folsom St | proposed interior remodel at first and second floors. proposed vertical addition to add a roof top restaurant and a roof deck. maher-compliance with ordinance no. 155-13 not required.Details
proposed interior remodel at first and second floors. proposed vertical addition to add a roof top restaurant and a roof deck. maher-compliance with ordinance no. 155-13 not required. | $500,000 |
| Apr 18, 2014 | Completed final sign-off Oct 2014 | 133 Elsie St | revision to 200603015694/s1 changes to foundation planDetails
revision to 200603015694/s1 changes to foundation plan | |
| Apr 8, 2014 | Completed final sign-off Oct 2014 | 133 Elsie St | revision to the approved shoring plan with permit ap #2o0603015694. shoring was under previous permits, added cost of piles are $17,000Details
revision to the approved shoring plan with permit ap #2o0603015694. shoring was under previous permits, added cost of piles are $17,000 | $17,000 |
| Feb 10, 2014 | Completed final sign-off Feb 2014 | 4631 Balboa St | proposed revisoin to approved pa #2013.0626.0539 & 2014.01.16.6432 to reflect as built condition @4631 balboa - to show foundation & framing plan.Details
proposed revisoin to approved pa #2013.0626.0539 & 2014.01.16.6432 to reflect as built condition @4631 balboa - to show foundation & framing plan. | |
| Feb 10, 2014 | Completed final sign-off Apr 2014 | 233 Dellbrook Av | remodel existing 1st flr bathroom, repl fixtures, ie., new toilet, vanity, shower pan and faucets, install new tile on floor and shower wallsDetails
remodel existing 1st flr bathroom, repl fixtures, ie., new toilet, vanity, shower pan and faucets, install new tile on floor and shower walls | $3,000 |
| Feb 7, 2014 | Never finaled issued Feb 2014, no final | 2035 15th Av | revision to app#200406307735si. proposed as built floor plans.Details
revision to app#200406307735si. proposed as built floor plans. | |
| Jan 24, 2014 | Completed final sign-off Apr 2017 | 237 Shipley St | to erect 4 stories, no basement, 21 units multi family residential buidling. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 4 stories, no basement, 21 units multi family residential buidling. ** maher: compliance with ordinance no# 155-13 not required ** | $1,000,000 |
| Jan 23, 2014 | Completed final sign-off Feb 2014 | 126 Bronte St | partial replacement of existing retaining wall.Details
partial replacement of existing retaining wall. | $10,000 |
| Jan 16, 2014 | Completed final sign-off Feb 2014 | 4631 Balboa St | proposed interior remodel to convert garage space to storage, all within the (e) bldg. boundary.Details
proposed interior remodel to convert garage space to storage, all within the (e) bldg. boundary. | $1,000 |
| Dec 31, 2013 | Never finaled issued Dec 2013, no final | 664 Sweeny St | proposed foundation replacement.Details
proposed foundation replacement. | $20,000 |
| Oct 17, 2013 | Completed final sign-off Nov 2013 | 1454 California St | existing stairs exterior: remove dryrot & damaged wood on two exterior stairways. replace/repaire-in-kind stringers, risers & treads. approximately 30% replacement.Details
existing stairs exterior: remove dryrot & damaged wood on two exterior stairways. replace/repaire-in-kind stringers, risers & treads. approximately 30% replacement. | $6,000 |
| Jun 26, 2013 | Completed final sign-off Feb 2014 | 4631 Balboa St | voluntary structural strengthening within (e) boundaries per plan. (structural)Details
voluntary structural strengthening within (e) boundaries per plan. (structural) | $5,000 |
| May 15, 2013 | Completed final sign-off Oct 2013 | 300 03rd St | apt. 311:remodel bathroom. replacing 1 door. adding 2 doors. replacing 2 lights, adding 6 lights. apply decorative wood slat finish to entry and 1 wall of bedroom. add new wood flooring.Details
apt. 311:remodel bathroom. replacing 1 door. adding 2 doors. replacing 2 lights, adding 6 lights. apply decorative wood slat finish to entry and 1 wall of bedroom. add new wood flooring. | $30,000 |
| Mar 12, 2013 | Completed final sign-off Oct 2015 | 248 09th St | to erect 5 stories, 15 units multi-family residential with 1 commercial unit.Details
to erect 5 stories, 15 units multi-family residential with 1 commercial unit. | $2,000,000 |
| Jan 29, 2013 | Completed final sign-off Apr 2013 | 2680 Great Hy | proposed interior remodel for 2 bedrooms, 1 full bath at rear of 1st floor with kitchen and bath remodel at 2nd flr and add 1 bath. structural upgrades to accomodate interior modifications per plan. all work performed within e boundry of buildingDetails
proposed interior remodel for 2 bedrooms, 1 full bath at rear of 1st floor with kitchen and bath remodel at 2nd flr and add 1 bath. structural upgrades to accomodate interior modifications per plan. all work performed within e boundry of building | $75,000 |
| Jan 24, 2013 | Completed final sign-off Nov 2014 | 928 Toland St | to demolish shed / concrete.Details
to demolish shed / concrete. | $5,000 |
| Jan 24, 2013 | Completed final sign-off Jan 2017 | 928 Toland St | to erect 1 story commercial building.Details
to erect 1 story commercial building. | $700,000 |
| Dec 19, 2012 | Never finaled issued Dec 2012, no final | 15 Nebraska St | foundation replacement. all work to be done within (e) boundry.Details
foundation replacement. all work to be done within (e) boundry. | $20,000 |
| Oct 29, 2012 | Completed final sign-off Feb 2013 | 3065 Steiner St | partial replacement of (e) distressed foundation, voluntary seismic strengthening at 1st level (garage area)Details
partial replacement of (e) distressed foundation, voluntary seismic strengthening at 1st level (garage area) | $85,000 |
| Oct 25, 2012 | Completed final sign-off Nov 2012 | 2578 30th Av | dry rot repairs around garage door in kind & bay area @ front of building, raising water heater & strapDetails
dry rot repairs around garage door in kind & bay area @ front of building, raising water heater & strap | $3,000 |
| Sep 10, 2012 | Completed final sign-off Sep 2013 | 1265 Bosworth St | erect 2-story type 5Details
erect 2-story type 5 | $400,000 |