Block 3547, lot 018A
311 Valencia St
- City’s use
- Multi-Family Residential
- Built
- 1926
- Stories
- 3
- Units
- 26
- Rooms
- 26 bathrooms
- Building
- 14,854 sq ft
- Lot
- 7,496 sq ft
- Zoning
- VALEN
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2026 | In progress issued Mar 2026 | 311 Valencia St | O Donoghue Construction Inc. | remove and replace damaged drywall on (e) walls in commercial space. no structural changes. no change to layout, use or occupancy.Details
remove and replace damaged drywall on (e) walls in commercial space. no structural changes. no change to layout, use or occupancy. | $4,800 |
| Mar 10, 2025 | In progress issued Aug 2025 | 309 Valencia St | change of use from art gallery to nail salon . no constrution work.Details
change of use from art gallery to nail salon . no constrution work. | ||
| Jan 17, 2024 | In progress issued Jan 2024 | 301 Valencia St | San Francisco Fire Protection | upgrade existing local fire system to meet sffd sec 1103.7.6.1 with new power supply panel and lf horns inside all units. new devices will be tie-in to existing control panel. no change in matrix as in pa 201707061111.Details
upgrade existing local fire system to meet sffd sec 1103.7.6.1 with new power supply panel and lf horns inside all units. new devices will be tie-in to existing control panel. no change in matrix as in pa 201707061111. | $15,000 |
| Nov 12, 2020 | Never finaled filed Nov 2020, never issued | 301 Valencia St | the scope of the work is to add 4 new accessory dwelling units to the rear portion of the basement per ordinance no. 162-16. a courtyard will be added in the rear yard to provide exposure for the units.Details
the scope of the work is to add 4 new accessory dwelling units to the rear portion of the basement per ordinance no. 162-16. a courtyard will be added in the rear yard to provide exposure for the units. | $597,440 | |
| Feb 10, 2020 | Never finaled issued Feb 2020, no final | 301 Valencia St | street space and mtaDetails
street space and mta | ||
| Oct 24, 2019 | Never finaled issued Nov 2019, no final | 301 Valencia St | O Donoghue Construction Inc. | mechanical, electrical, plumbing and fire sprinkler modifications by design build contractor. electrical scope limited to providing power to address the ada accessible upgrades. ref pa 2017-0912-7848 & 2017-0912-7842Details
mechanical, electrical, plumbing and fire sprinkler modifications by design build contractor. electrical scope limited to providing power to address the ada accessible upgrades. ref pa 2017-0912-7848 & 2017-0912-7842 | |
| Oct 17, 2019 | Completed final sign-off May 2022 | 301 Valencia St | O Donoghue Construction Inc. | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref pa 2017-0912-7842 & 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4.Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. ref pa 2017-0912-7842 & 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. | $769,358 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 301 Valencia St | O Donoghue Construction Inc. | commercial: soft story upgrades to (e) historic building ada upgrades to (e) restrooms to full compliance. ref pa 2017-0912-7842 and 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
commercial: soft story upgrades to (e) historic building ada upgrades to (e) restrooms to full compliance. ref pa 2017-0912-7842 and 2017-0912-7848 soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Sep 12, 2017 | Completed final sign-off May 2022 | 301 Valencia St | office: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
office: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $158,000 | |
| Sep 12, 2017 | Completed final sign-off May 2022 | 301 Valencia St | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $39,500 | |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 301 Valencia St | San Francisco Fire Protection | like for like voluntary local fire system replacement w/new control panel, smoke detectors & pull stations at the same location. existing bells will be tie-in to new panel. will comply with new sffc by 2021.Details
like for like voluntary local fire system replacement w/new control panel, smoke detectors & pull stations at the same location. existing bells will be tie-in to new panel. will comply with new sffc by 2021. | $5,600 |
| Jun 15, 2017 | Never finaled issued Oct 2017, no final | 301 Valencia St | replacement of all residential non compliant e windows to comply with current codes. no change in opening. u-factor = 0.32Details
replacement of all residential non compliant e windows to comply with current codes. no change in opening. u-factor = 0.32 | $7,000 | |
| Feb 6, 2015 | Completed final sign-off Jan 2016 | 307 Valencia St | Dominguez Roofing | remove (e) roofing material on bay windows only. replace with self-adhesive roofing membrane.Details
remove (e) roofing material on bay windows only. replace with self-adhesive roofing membrane. | $15,600 |
| Jan 28, 2015 | Completed final sign-off Jul 2015 | 301 Valencia St | Building Alchemy | build new wood frame 10 ft with wooden stairs - drywall over. space remain vacant.Details
build new wood frame 10 ft with wooden stairs - drywall over. space remain vacant. | $14,500 |
| Dec 30, 2014 | Never finaled issued Dec 2014, no final | 301 Valencia St | Building Alchemy | remove non-bearing partition wall. remove t-bar ceiling.Details
remove non-bearing partition wall. remove t-bar ceiling. | $3,000 |
| Jul 12, 2011 | Completed final sign-off Mar 2012 | 301 Valencia St | International Commercial Awning, Inc. | erect a non electric projecting double faced non illuminated new signDetails
erect a non electric projecting double faced non illuminated new sign | $500 |
| Jan 14, 2011 | Expired or cancelled expired Mar 2012 | 301 Valencia St | Dan Gillies Construction Services Inc | removal of non load bearing wall. reolcation of door opening, installation of new non load bearing partitionDetails
removal of non load bearing wall. reolcation of door opening, installation of new non load bearing partition | $6,677 |
| Dec 23, 2010 | Completed final sign-off Jan 2011 | 301 Valencia St | Clear Channel Outdoor | obtain a building permit for sign located at 301 valencia street as required by sign i.d number "orig 532" per n.o.r dated october 6,2010. block and lot number: 3547/18a.Details
obtain a building permit for sign located at 301 valencia street as required by sign i.d number "orig 532" per n.o.r dated october 6,2010. block and lot number: 3547/18a. | $5,000 |
| Sep 28, 2009 | Never finaled issued Sep 2009, no final | 301 Valencia St | street space and siewalk repairDetails
street space and siewalk repair | ||
| Mar 7, 2008 | Never finaled issued Mar 2008, no final | 301 Valencia St | street spaceDetails
street space | ||
| Dec 3, 2004 | Never finaled issued Dec 2004, no final | 301 Valencia St | sidewalk repair permitDetails
sidewalk repair permit | ||
| Oct 1, 2003 | Completed final sign-off Mar 2004 | 307 Valencia St | dry-rot repair of joists & connection at conc. walls, along valencia street side only, no change toDetails
dry-rot repair of joists & connection at conc. walls, along valencia street side only, no change to | $3,000 | |
| May 17, 2001 | Completed final sign-off Jun 2001 | 307 Valencia St | Precision Roofing Inc | reroofingDetails
reroofing | $24,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- O Donoghue Construction Inc. (4), Building Alchemy (2), San Francisco Fire Protection (2), Clear Channel Outdoor, Dan Gillies Construction Services Inc, Dominguez Roofing, International Commercial Awning, Inc., Precision Roofing Inc
- Architects
- Ahmad Mohazab (5), Mark Hogan
- Engineers
- Chen Wei-Chung, Majid Amiri-Razavian
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.